메뉴 건너뛰기




Volumn 15, Issue 4, 2003, Pages

The lazy cook problem, or scheduling two parallel machines to optimize vehicle utilization

Author keywords

Column generation; Non regular objective function; Parallel machine scheduling

Indexed keywords

ALGORITHMS; CUTTING; HEURISTIC METHODS; OPTIMIZATION; PROBLEM SOLVING; SCHEDULING; TRANSPORTATION;

EID: 19644379593     PISSN: 09206299     EISSN: None     Source Type: Journal    
DOI: 10.1023/B:FLEX.0000036059.45661.35     Document Type: Article
Times cited : (1)

References (15)
  • 2
    • 0023088871 scopus 로고
    • Optimal robot's service movements: A one dimensional case
    • Dror, M. and Stulman, A., "Optimal Robot's Service Movements: A One Dimensional Case," Computers in Industrial Engineering, Vol. 12, No. 1, pp. 39-46 (1987).
    • (1987) Computers in Industrial Engineering , vol.12 , Issue.1 , pp. 39-46
    • Dror, M.1    Stulman, A.2
  • 5
    • 0001510482 scopus 로고
    • A linear programming approach to the cutting stock problem - Part I and II
    • Gilmore, P. C. and Gomory, R. E., "A Linear Programming Approach to the Cutting Stock Problem - Part I and II," Operations Research, Vol. 9, pp. 848-859 (1961).
    • (1961) Operations Research , vol.9 , pp. 848-859
    • Gilmore, P.C.1    Gomory, R.E.2
  • 6
    • 0000143954 scopus 로고
    • A linear programming approach to the cutting stock problem - Part II
    • Gilmore, P. C. and Gomory, R. E., "A Linear Programming Approach to the Cutting Stock Problem - Part II," Operations Research, Vol. 11, pp. 863-888 (1963).
    • (1963) Operations Research , vol.11 , pp. 863-888
    • Gilmore, P.C.1    Gomory, R.E.2
  • 8
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • Graham, R. L., Lenstra, J. K., and Rinnooy Kan, A. H. G., "Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey," Annals of Discrete Mathematics, Vol. 5, pp. 287-326 (1979).
    • (1979) Annals of Discrete Mathematics , vol.5 , pp. 287-326
    • Graham, R.L.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 9
    • 6944256183 scopus 로고
    • Dynamic scheduling of a robot serving machines on a one-dimensional line
    • L'Ecuyer, P., Mayrand, M., and Dror, M., "Dynamic Scheduling of a Robot Serving Machines on a One-Dimensional Line," IIE Transactions, Vol. 23, No. 4, pp. 371-382 (1991).
    • (1991) IIE Transactions , vol.23 , Issue.4 , pp. 371-382
    • L'Ecuyer, P.1    Mayrand, M.2    Dror, M.3
  • 10
    • 0000197379 scopus 로고
    • A crane scheduling prolem in a computer-integrated manufacturing environment
    • Matsuo, H., Shang, J. S., and Sullivan, R. S., "A Crane Scheduling Prolem in a Computer-Integrated Manufacturing Environment," Management Science, Vol. 37, No. 5, pp. 587-605 (1991).
    • (1991) Management Science , vol.37 , Issue.5 , pp. 587-605
    • Matsuo, H.1    Shang, J.S.2    Sullivan, R.S.3
  • 11
    • 0035277048 scopus 로고    scopus 로고
    • A branch-and-cut algorithm for the maximum cardinality stable set problem
    • Rossi, F. and Smriglio, S., "A Branch-and-Cut Algorithm for the Maximum Cardinality Stable Set Problem," Operations Research Letters, Vol. 28, No. 2, pp. 63-74 (2001).
    • (2001) Operations Research Letters , vol.28 , Issue.2 , pp. 63-74
    • Rossi, F.1    Smriglio, S.2
  • 14
    • 0030086424 scopus 로고    scopus 로고
    • Optimal sequencing of double-gripper gantry robot moves in tightly coupled serial production systems
    • Su, Q. and Chen, F. F., "Optimal Sequencing of Double-Gripper Gantry Robot Moves in Tightly Coupled Serial Production Systems," IEEE Transactions on Robotics and Automation, Vol. 12, No. 1, pp. 22-30 (1996).
    • (1996) IEEE Transactions on Robotics and Automation , vol.12 , Issue.1 , pp. 22-30
    • Su, Q.1    Chen, F.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.