메뉴 건너뛰기




Volumn 213, Issue 7, 1999, Pages 655-676

A prototype constraint-based system for the automation and optimization of machining processes

Author keywords

Concurrent engineering; Conflict resolution; Constraints; Cost estimation; Design consistency; Feature based design; Knowledge based systems; Object oriented programming; Process optimization

Indexed keywords


EID: 19644369850     PISSN: 09544054     EISSN: None     Source Type: Journal    
DOI: 10.1243/0954405991517100     Document Type: Article
Times cited : (17)

References (31)
  • 1
    • 0031344631 scopus 로고    scopus 로고
    • Developing an integrated frame work for feature-based early manufacturing cost estimisation
    • Ou-Yang, C. and Lin, T. S. Developing an integrated frame work for feature-based early manufacturing cost estimisation. Int. J. Advd Mfg Technol., 1997, 13(9), 618-629.
    • (1997) Int. J. Advd Mfg Technol. , vol.13 , Issue.9 , pp. 618-629
    • Ou-Yang, C.1    Lin, T.S.2
  • 3
    • 33747398387 scopus 로고    scopus 로고
    • Concurrent engineering for global manufacturing
    • Abdalla, H. S. Concurrent engineering for global manufacturing. Int. J. Prod. Econ., 1998, 1-10.
    • (1998) Int. J. Prod. Econ. , pp. 1-10
    • Abdalla, H.S.1
  • 5
    • 0009406503 scopus 로고
    • An approach to overall design consistency in concurrent engineering
    • Noble, J. S. An approach to overall design consistency in concurrent engineering. Int. J. Flexible Automn and Integrated Mfg, 1993, 1(1), 25-36.
    • (1993) Int. J. Flexible Automn and Integrated Mfg , vol.1 , Issue.1 , pp. 25-36
    • Noble, J.S.1
  • 7
    • 0002605876 scopus 로고    scopus 로고
    • A multi-agent architecture for concurrent design, process planning, routing, and scheduling
    • Balasubramanian, S. and Norrie, D. H. A multi-agent architecture for concurrent design, process planning, routing, and scheduling. Concurrent Engng: Res. and Applic., 1996, 4(1), 7-15.
    • (1996) Concurrent Engng: Res. and Applic. , vol.4 , Issue.1 , pp. 7-15
    • Balasubramanian, S.1    Norrie, D.H.2
  • 8
    • 0002439012 scopus 로고    scopus 로고
    • Designing integrated engineering environments: Blackboard-based integration of design and analysis tools
    • Lander, S. E. and Corkill, D. D. Designing integrated engineering environments: blackboard-based integration of design and analysis tools. Concurrent Engng: Res. and Applic., 1996, 4(1), 59-70.
    • (1996) Concurrent Engng: Res. and Applic. , vol.4 , Issue.1 , pp. 59-70
    • Lander, S.E.1    Corkill, D.D.2
  • 9
    • 45549114681 scopus 로고    scopus 로고
    • Early cost estimating in product design
    • Dewhurst, P. and Boothroyd, G. Early cost estimating in product design. J. Mfg Syst., 1998, 7(3), 183-191.
    • (1998) J. Mfg Syst. , vol.7 , Issue.3 , pp. 183-191
    • Dewhurst, P.1    Boothroyd, G.2
  • 10
    • 0009433338 scopus 로고
    • Intelligent evaluation of designs for manufacturing cost
    • Ed. A. Kusiak, John Wiley, New York
    • Thurston, D. and Carnahan, J. Intelligent evaluation of designs for manufacturing cost. In Concurrent Engineering: Automation, Tools, and Techniques (Ed. A. Kusiak), 1993, pp. 401-443 (John Wiley, New York).
    • (1993) Concurrent Engineering: Automation, Tools, and Techniques , pp. 401-443
    • Thurston, D.1    Carnahan, J.2
  • 11
    • 0028581401 scopus 로고
    • Development of an optimisation method for determination of process sequences considering prismatic workpieces
    • Taiber, J. G. Development of an optimisation method for determination of process sequences considering prismatic workpieces. Trans. ASME, Comput. in Engng, 1994, 1, 271-280.
    • (1994) Trans. ASME, Comput. in Engng , vol.1 , pp. 271-280
    • Taiber, J.G.1
  • 12
    • 0000209568 scopus 로고    scopus 로고
    • A comparison of equality constraints formulation for concurrent design optimisation
    • Tappeta, V. R. and Ranaud, E. J. A comparison of equality constraints formulation for concurrent design optimisation. Concurrent Engng: Res. and Applic., 1997, 5(5), 253-261.
    • (1997) Concurrent Engng: Res. and Applic. , vol.5 , Issue.5 , pp. 253-261
    • Tappeta, V.R.1    Ranaud, E.J.2
  • 13
    • 0002913580 scopus 로고    scopus 로고
    • Design optimisation in concurrent engineering: A team approach
    • Downlatshahi, S. and Ashok, M. S. Design optimisation in concurrent engineering: a team approach. Concurrent Engng: Res. and Applic., 1997, 5(5), 145-154.
    • (1997) Concurrent Engng: Res. and Applic. , vol.5 , Issue.5 , pp. 145-154
    • Downlatshahi, S.1    Ashok, M.S.2
  • 14
    • 0009410236 scopus 로고    scopus 로고
    • An expert system for manufacturing process optimisation
    • Manchester
    • Gayretli, A. and Abdalla, H. An expert system for manufacturing process optimisation. In Proceedings of TMCE '98, Manchester, 1998.
    • (1998) Proceedings of TMCE '98
    • Gayretli, A.1    Abdalla, H.2
  • 15
    • 0030296040 scopus 로고    scopus 로고
    • Cost evaluation in design with form features
    • Fen, C. J., Kusiak, A. and Huang, C. Cost evaluation in design with form features. Comput.-Aided Des., 1996, 28(11), 879-885.
    • (1996) Comput.-Aided Des. , vol.28 , Issue.11 , pp. 879-885
    • Fen, C.J.1    Kusiak, A.2    Huang, C.3
  • 16
    • 0026945249 scopus 로고
    • Minimisation of drilling cost: A closed-form solution
    • Shaikh, M. A. and Hansotia, B. J. Minimisation of drilling cost: a closed-form solution. Comput. and Ind. Engng, 1992, 23(1-4), 443-446.
    • (1992) Comput. and Ind. Engng , vol.23 , Issue.1-4 , pp. 443-446
    • Shaikh, M.A.1    Hansotia, B.J.2
  • 17
    • 0028600884 scopus 로고
    • Reducing set-up cost by automated generation of redesign suggestions
    • Das, D. Gupta, S. K. and Nau, D. S. Reducing set-up cost by automated generation of redesign suggestions. Trans. ASME, Comput. in Engng, 1994, 1, 159-170.
    • (1994) Trans. ASME, Comput. in Engng , vol.1 , pp. 159-170
    • Das, D.1    Gupta, S.K.2    Nau, D.S.3
  • 18
    • 0029419294 scopus 로고
    • Estimation of set-up time for machined parts: Accounting for work-holding constraints using a vice
    • American Society of Mechanical Engineers, New York
    • Das, D., Gupta, S. K. and Nau, D. S. Estimation of set-up time for machined parts: accounting for work-holding constraints using a vice. In Proceedings of the Computers in Engineering Conference and the Engineering Database Symposium, 1995, pp. 619-631 (American Society of Mechanical Engineers, New York).
    • (1995) Proceedings of the Computers in Engineering Conference and the Engineering Database Symposium , pp. 619-631
    • Das, D.1    Gupta, S.K.2    Nau, D.S.3
  • 19
    • 0029489571 scopus 로고
    • An integrated system for process planning and cost estimation in hole making
    • Luong, L. H. S. and Spedding, T. An integrated system for process planning and cost estimation in hole making. Int. J. Advd Mfg Technol., 1995, 10, 411-415.
    • (1995) Int. J. Advd Mfg Technol. , vol.10 , pp. 411-415
    • Luong, L.H.S.1    Spedding, T.2
  • 20
    • 0009367090 scopus 로고    scopus 로고
    • Machining set-up planning based on evaluation of feature relations and fixturing constraints
    • Eds R.A. Adey, G. Rzevski and R. Teti, Computational Mechanics Publications, Southampton, Boston
    • Pham, D. T. and Gologlu, C. Machining set-up planning based on evaluation of feature relations and fixturing constraints. In Application of Artificial Intelligence in Engineering XII (Eds R.A. Adey, G. Rzevski and R. Teti), 1997, pp. 35-38 (Computational Mechanics Publications, Southampton, Boston).
    • (1997) Application of Artificial Intelligence in Engineering XII , pp. 35-38
    • Pham, D.T.1    Gologlu, C.2
  • 21
    • 0026105982 scopus 로고
    • IKOOPS: An intelligent knowledge-base object-oriented process planning system for the manufacture of progressive dies
    • Lee, I. B. H., Lim, B. S. and Nee, A. Y. C. IKOOPS: an intelligent knowledge-base object-oriented process planning system for the manufacture of progressive dies. Expert Syst., 1991, 8(1), 19-31.
    • (1991) Expert Syst. , vol.8 , Issue.1 , pp. 19-31
    • Lee, I.B.H.1    Lim, B.S.2    Nee, A.Y.C.3
  • 23
    • 84965847336 scopus 로고
    • A constraint-based system for product design
    • Hashemian, M. and Gu, P. A constraint-based system for product design. Concurrent Engng: Res. and Applic., 1995, 3(3), 177-185.
    • (1995) Concurrent Engng: Res. and Applic. , vol.3 , Issue.3 , pp. 177-185
    • Hashemian, M.1    Gu, P.2
  • 25
    • 85034519621 scopus 로고
    • Metcut Research Associations Inc.
    • Machining Data Handbook, 3rd edition, 1980, Vols 1-2 (Metcut Research Associations Inc.).
    • (1980) Machining Data Handbook, 3rd Edition , vol.1-2
  • 29
    • 0031352475 scopus 로고    scopus 로고
    • Shop-floor scheduling at shipbuilding yards using the multiple intelligent agent system
    • Choi, H. S. and Park, K. H. Shop-floor scheduling at shipbuilding yards using the multiple intelligent agent system. J. Intelligent Mfg, 1997, 8(6), 505-515.
    • (1997) J. Intelligent Mfg , vol.8 , Issue.6 , pp. 505-515
    • Choi, H.S.1    Park, K.H.2
  • 30
    • 85034495541 scopus 로고    scopus 로고
    • Knowledge-based expert systems: User interface implications
    • Civil-Comp Press, Edinburgh
    • Berrais, A. Knowledge-based expert systems: user interface implications. In Advances in Computational Structure Technology, 1996, pp. 185-195 (Civil-Comp Press, Edinburgh).
    • (1996) Advances in Computational Structure Technology , pp. 185-195
    • Berrais, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.