메뉴 건너뛰기




Volumn 28, Issue 3-4, 2002, Pages 145-151

Mine size optimization using marginal analysis

Author keywords

Marginal analysis; Mineral economics; Optimum production rate

Indexed keywords

COSTS; MINES; MINING; OPTIMIZATION; ORES;

EID: 1942441749     PISSN: 03014207     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.resourpol.2004.01.001     Document Type: Article
Times cited : (25)

References (9)
  • 1
    • 0028442637 scopus 로고
    • Simplified cost models for prefeasibility mineral evaluation
    • June
    • Camm, T.W., 1994. Simplified cost models for prefeasibility mineral evaluation. Mining Engineering June, 559-562.
    • (1994) Mining Engineering , pp. 559-562
    • Camm, T.W.1
  • 2
    • 0026938545 scopus 로고
    • Determination of the optimum lifetime of a mining project using discounted cash flow analysis and option pricing techniques
    • October
    • Cavender, B., 1992. Determination of the optimum lifetime of a mining project using discounted cash flow analysis and option pricing techniques. Mining Engineering October, 1262-1268.
    • (1992) Mining Engineering , pp. 1262-1268
    • Cavender, B.1
  • 3
    • 0008679240 scopus 로고    scopus 로고
    • One project, two discount rates
    • April
    • Davis, G.A., 1998. One project, two discount rates. Mining Engineering April, 70-74.
    • (1998) Mining Engineering , pp. 70-74
    • Davis, G.A.1
  • 4
    • 0016911674 scopus 로고
    • Application of dynamic and stochastic programming to optimize cutoff grades and production rates
    • January
    • Dowd, P., 1976. Application of dynamic and stochastic programming to optimize cutoff grades and production rates. Trans. Instn. Min. Metal. (Sec.A: Min. industry) January, A22-A31.
    • (1976) Trans. Instn. Min. Metal. (Sec.A: Min. Industry)
    • Dowd, P.1
  • 5
    • 0020099927 scopus 로고
    • Choice of mine-mill capacities and production schedules using open-ended dynamic programming
    • March
    • Lizotte, Y., Elbrond, J., 1982. Choice of mine-mill capacities and production schedules using open-ended dynamic programming. CIM Bulletin March, 154-163.
    • (1982) CIM Bulletin , pp. 154-163
    • Lizotte, Y.1    Elbrond, J.2
  • 6
    • 0031071667 scopus 로고    scopus 로고
    • A critical examination of the methods and factors affecting the selection of an optimum production rate
    • February
    • Smith, LID., 1997. A critical examination of the methods and factors affecting the selection of an optimum production rate. CIM Bulletin February, 48-54.
    • (1997) CIM Bulletin , pp. 48-54
    • Smith, L.D.1
  • 7
    • 1842764837 scopus 로고    scopus 로고
    • The argument for a "bare bones" base case
    • June
    • Smith, L.D., 1999. The argument for a "bare bones" base case. CIM Bulletin June, 134-150.
    • (1999) CIM Bulletin , pp. 134-150
    • Smith, L.D.1
  • 9
    • 0018046432 scopus 로고
    • Optimization of mining engineering design in mineral valuation
    • December
    • Wells, H.M., 1978. Optimization of mining engineering design in mineral valuation. Mining Engineering December, 1676-1684.
    • (1978) Mining Engineering , pp. 1676-1684
    • Wells, H.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.