메뉴 건너뛰기




Volumn 56, Issue 6, 2005, Pages 738-743

Multi-objective allocation of multi-function workers with lower bounded capacity

Author keywords

Manpower planning; Networks

Indexed keywords

INTEGER PROGRAMMING; MATHEMATICAL MODELS; MATHEMATICAL TRANSFORMATIONS; MATRIX ALGEBRA; NONLINEAR PROGRAMMING; PLANNING; PROBLEM SOLVING; RESOURCE ALLOCATION; SET THEORY;

EID: 18944393874     PISSN: 01605682     EISSN: None     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2601871     Document Type: Article
Times cited : (22)

References (9)
  • 2
    • 0024864870 scopus 로고
    • Towards the measurement of manufacturing flexibility
    • First Quarter
    • Cox Jr T (1989). Towards the measurement of manufacturing flexibility. Prod Invent Mngt J First Quarter: 68-72.
    • (1989) Prod Invent Mngt J , pp. 68-72
    • Cox Jr., T.1
  • 3
    • 0010736589 scopus 로고    scopus 로고
    • Linking human resource flexibility with manufacturing flexibility: Enablers of labour capacity flexibility in manufacturing plants
    • Dominguez JA (ed). Sevilla, CD-Rom
    • Oke A (2000). Linking human resource flexibility with manufacturing flexibility: enablers of labour capacity flexibility in manufacturing plants. In: Dominguez JA (ed). Proceedings of the First World Conference in Production and Operations Management (POM). Sevilla, CD-Rom.
    • (2000) Proceedings of the First World Conference in Production and Operations Management (POM)
    • Oke, A.1
  • 4
    • 0015628628 scopus 로고
    • A three-stage manpower planning and scheduling model-a service-sector example
    • Abernathy WJ, Baloff N, Hershey JC and Wandel S (1973). A three-stage manpower planning and scheduling model-a service-sector example. Opns Res 21: 693-711.
    • (1973) Opns Res , vol.21 , pp. 693-711
    • Abernathy, W.J.1    Baloff, N.2    Hershey, J.C.3    Wandel, S.4
  • 5
    • 0026904878 scopus 로고
    • Workforce staffing and scheduling: Hospital nursing specific models
    • Siferd SP and Benton WC (1992). Workforce staffing and scheduling: Hospital nursing specific models. Eur J Opl Res 60: 233-246.
    • (1992) Eur J Opl Res , vol.60 , pp. 233-246
    • Siferd, S.P.1    Benton, W.C.2
  • 6
    • 84989491929 scopus 로고
    • An integrated work shift scheduling system
    • Buffa ES, Cosgrove MJ and Luce BJ (1976). An integrated work shift scheduling system. Decision Sci 7: 620-630.
    • (1976) Decision Sci , vol.7 , pp. 620-630
    • Buffa, E.S.1    Cosgrove, M.J.2    Luce, B.J.3
  • 7
    • 0036532645 scopus 로고    scopus 로고
    • Development and evaluation of an assignment heuristic for allocation cross-trained workers
    • Campbell GM and Diaby M (2002). Development and evaluation of an assignment heuristic for allocation cross-trained workers. Eur J Opl Res 138: 9-20.
    • (2002) Eur J Opl Res , vol.138 , pp. 9-20
    • Campbell, G.M.1    Diaby, M.2
  • 8
    • 0036790080 scopus 로고    scopus 로고
    • Using MILP to plan annualised working hours
    • Corominas A, Lusa A and Pastor R (2002). Using MILP to plan annualised working hours. J Opl Res Soc 53: 1101-1108.
    • (2002) J Opl Res Soc , vol.53 , pp. 1101-1108
    • Corominas, A.1    Lusa, A.2    Pastor, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.