메뉴 건너뛰기




Volumn 108, Issue 11, 2001, Pages 96-126

Alleviating unsteady-state flow headaches: Watch out for water hammer, surges and cavitation

Author keywords

[No Author keywords available]

Indexed keywords


EID: 18844452948     PISSN: 00092460     EISSN: None     Source Type: Trade Journal    
DOI: None     Document Type: Article
Times cited : (7)

References (17)
  • 1
    • 18844374455 scopus 로고    scopus 로고
    • "Water Hammer," Issue No. 98-02, DOE/EH-0560, Washington, D.C., November
    • U.S. Dept. of Energy, Office of Nuclear and Facility Safety, NFS Safety Notice, "Water Hammer," Issue No. 98-02, DOE/EH-0560, Washington, D.C., November 1998.
    • (1998) NFS Safety Notice
  • 2
    • 18844462459 scopus 로고    scopus 로고
    • Good piping practices prevents water hammer in steam systems
    • Morton Grove, III., August
    • ITT Industries, "Good Piping Practices Prevents Water Hammer in Steam Systems", Engineered Systems, Morton Grove, III., August 1998.
    • (1998) Engineered Systems
  • 4
    • 18844362650 scopus 로고
    • What caused the steam system accident that killed jack smith?
    • July
    • Krishner, W., What Caused the Steam System Accident That Killed Jack Smith?, Heating/Piping/Air Conditioning, pp. 36-53, July 1995.
    • (1995) Heating/Piping/Air Conditioning , pp. 36-53
    • Krishner, W.1
  • 5
    • 18844446194 scopus 로고
    • Issue No. 95-1, EH-0427, Washington, D.C., June
    • U.S. Dept. of Energy, Environment, Safety and Health Safety Bulletin, Issue No. 95-1, EH-0427, Washington, D.C., June 1995.
    • (1995) Environment, Safety and Health Safety Bulletin
  • 7
    • 0024590590 scopus 로고
    • How a good turn eliminated hydraulic hammer: The case of the noisy feed pipe
    • May
    • Harrison, M. E. and France, J. J, How a Good Turn Eliminated Hydraulic Hammer: The Case of the Noisy Feed Pipe, Chem. Eng., 96, 5, p. 130, May 1989.
    • (1989) Chem. Eng. , vol.96 , Issue.5 , pp. 130
    • Harrison, M.E.1    France, J.J.2
  • 9
    • 0029209092 scopus 로고
    • Problem-free pumping systems: A guide to holistic design - part II: design problems
    • Jan.
    • Nelson, W., Problem-Free Pumping Systems: A Guide To Holistic Design - Part II: Design Problems, Chem. Eng., 102, 1, pp. 87-94, Jan. 1995.
    • (1995) Chem. Eng. , vol.102 , Issue.1 , pp. 87-94
    • Nelson, W.1
  • 10
    • 0010546487 scopus 로고
    • Practical piping design part 8: piping design for two-phase flow
    • June 23
    • Kern, R., Practical Piping Design Part 8: Piping Design for Two-Phase Flow, CE Refresher, Chem. Eng., 82, 13, pp. 145-151, June 23, 1975.
    • (1975) CE Refresher, Chem. Eng. , vol.82 , Issue.13 , pp. 145-151
    • Kern, R.1
  • 11
    • 18844441196 scopus 로고    scopus 로고
    • Physical modeling to determine the cause of air-hammer in sewer pipes
    • others., Dept. of Civil and Environmental Engineering, University of Houston, Houston, Tex., Mar. 6
    • Zhang, B., others., "Physical Modeling to Determine the Cause of Air-hammer in Sewer Pipes," Proceedings of Cigmat-98, Poster II-23, Dept. of Civil and Environmental Engineering, University of Houston, Houston, Tex., Mar. 6, 1998.
    • (1998) Proceedings of Cigmat-98, Poster II-23
    • Zhang, B.1
  • 12
    • 18844408093 scopus 로고    scopus 로고
    • University of Iowa, Iowa City, Iowa
    • Iowa Institute of Hydraulic Research, "Computational Hydraulics," www.iihr.uiowa.edu.education/student/courses/53-273.html, University of Iowa, Iowa City, Iowa.
    • Computational Hydraulics
  • 16
    • 18844426526 scopus 로고    scopus 로고
    • Coade Inc., Houston, Tex., 77070, Mar.
    • Caesar II program, Ver. 4.30, Coade Inc., Houston, Tex., 77070, http://www.coade.com, Mar. 2001.
    • (2001) Caesar II Program, Ver. 4.30


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.