Volumn 44, Issue 9, 2005, Pages 933-940

A heuristic approach for solution of MINLP problem for production scheduling in preemptive mode

Author keywords

MILP; MINLP; Production scheduling

Indexed keywords

CONSTRAINT THEORY; HEURISTIC METHODS; MATHEMATICAL MODELS; PROBLEM SOLVING; SCHEDULING;

EID: 18844432296     PISSN: 02552701     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cep.2004.11.001     Document Type: Article
Times cited : (6)

References (13)
  • 1
    • 0026256602 scopus 로고
    • Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods
    • J.F. Pekny, and D.L. Miller Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods Comput. Chem. Eng. 15 1991 741 748
    • (1991) Comput. Chem. Eng. , vol.15 , pp. 741-748
    • Pekny, J.F.1    Miller, D.L.2
  • 2
    • 0000835757 scopus 로고
    • An approximate method for the production scheduling of industrial batch processes with parallel units
    • R.F.H. Mussier, and L.B. Evans An approximate method for the production scheduling of industrial batch processes with parallel units Comput. Chem. Eng. 13 1989 229 238
    • (1989) Comput. Chem. Eng. , vol.13 , pp. 229-238
    • Mussier, R.F.H.1    Evans, L.B.2
  • 3
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations: I: MILP formulation
    • E. Kondili, C.C. Pantelides, and R.W.H. Sargent A general algorithm for short-term scheduling of batch operations I: MILP formulation Comput. Chem. Eng. 17 1993 211 227
    • (1993) Comput. Chem. Eng. , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 4
    • 0027545175 scopus 로고
    • A general algorithm for short-term scheduling of batch operations: II: computational issues
    • N. Shah, C.C. Pantelides, and R.W.H. Sargent A general algorithm for short-term scheduling of batch operations II: computational issues Comput. Chem. Eng. 17 1993 229 244
    • (1993) Comput. Chem. Eng. , vol.17 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 5
    • 0031140322 scopus 로고    scopus 로고
    • A mixed integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines
    • J. Cerda, G.P. Henning, and I.E. Grossmann A mixed integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines Ind. Eng. Chem. Res. 36 1997 1695 1707
    • (1997) Ind. Eng. Chem. Res. , vol.36 , pp. 1695-1707
    • Cerda, J.1    Henning, G.P.2    Grossmann, I.E.3
  • 8
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
    • C.A. Floudas, and X. Lin Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review Comput. Chem. Eng. 28 2004 2109 2129
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 9
    • 1942532282 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty
    • X. Lin, S.L. Janak, and C.A. Floudas A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty Comput. Chem. Eng. 28 2004 1069 1085
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 1069-1085
    • Lin, X.1    Janak, S.L.2    Floudas, C.A.3
  • 10
    • 18844388780 scopus 로고    scopus 로고
    • Aggregated scheduling of a multiproduct batch plant by two-stage stochastic integer programming
    • S. Engell, A. Markert, G. Sand, and R. Schultz Aggregated scheduling of a multiproduct batch plant by two-stage stochastic integer programming Optim. Eng. 5 2004 335 359
    • (2004) Optim. Eng. , vol.5 , pp. 335-359
    • Engell, S.1    Markert, A.2    Sand, G.3    Schultz, R.4
  • 11
    • 0346729992 scopus 로고    scopus 로고
    • A mathematical programming approach for cyclic production and cleaning scheduling of multistage continuous plants
    • A. Alle, L.G. Papageorgiou, and J.M. Pinto A mathematical programming approach for cyclic production and cleaning scheduling of multistage continuous plants Comput. Chem. Eng. 28 2004 3 15
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 3-15
    • Alle, A.1    Papageorgiou, L.G.2    Pinto, J.M.3
  • 12
    • 4143112202 scopus 로고    scopus 로고
    • Cyclic short term scheduling of multiproduct batch plants using continuous-time representation
    • W. Wu, and M. Ierapetritou Cyclic short term scheduling of multiproduct batch plants using continuous-time representation Comput. Chem. Eng. 28 2004 3 15
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 3-15
    • Wu, W.1    Ierapetritou, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.