메뉴 건너뛰기




Volumn 10, Issue 6, 1999, Pages 322-327

FLEAS: A flowline environment for automated supervision

Author keywords

Clothing industry; Manufacturing systems; Modelling; Scheduling; Simulation

Indexed keywords


EID: 1842767108     PISSN: 09576061     EISSN: None     Source Type: Journal    
DOI: 10.1108/09576069910292997     Document Type: Article
Times cited : (2)

References (10)
  • 1
    • 1842802655 scopus 로고
    • PhD thesis, Department of Clothing Design and Technology, Manchester Metropolitan University
    • Fozzard, G.J.W. (1989), "Simulation of clothing manufacture", PhD thesis, Department of Clothing Design and Technology, Manchester Metropolitan University.
    • (1989) Simulation of Clothing Manufacture
    • Fozzard, G.J.W.1
  • 8
    • 84898679306 scopus 로고    scopus 로고
    • Constraint based reactive rescheduling in a stochastic environment
    • Steel, S. and Alami, R. (Eds), Springer, Verlag, New York, Berlin
    • Spragg, J., Fozzard, G. and Tyler, D. (1997), "Constraint based reactive rescheduling in a stochastic environment", in Steel, S. and Alami, R. (Eds), Recent Advances in AI Planning, Springer, Verlag, New York, Berlin, pp. 403-13.
    • (1997) Recent Advances in AI Planning , pp. 403-413
    • Spragg, J.1    Fozzard, G.2    Tyler, D.3
  • 9
    • 0024497737 scopus 로고
    • The development phase of the Textile/Clothing Technology Corporation apparel automation project
    • Tyler, D.J. (1989), "The development phase of the Textile/Clothing Technology Corporation apparel automation project", International Journal of Clothing Science and Technology, Vol. 1 No. 2, pp. 11-16.
    • (1989) International Journal of Clothing Science and Technology , vol.1 , Issue.2 , pp. 11-16
    • Tyler, D.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.