메뉴 건너뛰기




Volumn 89, Issue 1, 2004, Pages 69-75

Selecting the best alternative based on life-cycle cost distributions of alternatives

Author keywords

Budget over run; Budget under run; Compromise over budget quantity; Life cycle cost

Indexed keywords

BUDGET CONTROL; COMPUTER SIMULATION; ESTIMATION; LIFE CYCLE; MATHEMATICAL MODELS; PROBABILITY DENSITY FUNCTION; PROBLEM SOLVING; RANDOM PROCESSES;

EID: 1842685760     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(03)00202-0     Document Type: Article
Times cited : (16)

References (14)
  • 1
    • 0029318733 scopus 로고
    • Life cycle cost and benefits of process automation in bulk pharmaceuticals
    • Adler D.J., Herkamp J.A., Wiesler J.R., Williams S.B. Life cycle cost and benefits of process automation in bulk pharmaceuticals. ISA Transactions. 34(2):1995;133-139.
    • (1995) ISA Transactions , vol.34 , Issue.2 , pp. 133-139
    • Adler, D.J.1    Herkamp, J.A.2    Wiesler, J.R.3    Williams, S.B.4
  • 2
    • 1842772010 scopus 로고
    • A design and implementation model for life cycle cost management system
    • Ahmed N.U. A design and implementation model for life cycle cost management system. Information and Management. 28:1995;261-269.
    • (1995) Information and Management , vol.28 , pp. 261-269
    • Ahmed, N.U.1
  • 3
    • 0032046060 scopus 로고    scopus 로고
    • Product life cycle cost analysis: State of the art review
    • Asiedu Y., Gu P. Product life cycle cost analysis. State of the art review International Journal of Production Research. 36(4):1998;883-908.
    • (1998) International Journal of Production Research , vol.36 , Issue.4 , pp. 883-908
    • Asiedu, Y.1    Gu, P.2
  • 4
    • 0025220847 scopus 로고
    • Quantifying variations in project-cost estimates
    • Bradley R.M., et al. Quantifying variations in project-cost estimates. Journal of Management in Engineering. 6(1):1990;99-106.
    • (1990) Journal of Management in Engineering , vol.6 , Issue.1 , pp. 99-106
    • Bradley, R.M.1
  • 5
    • 0037431957 scopus 로고    scopus 로고
    • Required characteristics of statistical distribution models for life cycle cost estimation
    • Jiang R., Zhang W.J., Ji P. Required characteristics of statistical distribution models for life cycle cost estimation. International Journal of Production Economics. 83(2):2003;185-194.
    • (2003) International Journal of Production Economics , vol.83 , Issue.2 , pp. 185-194
    • Jiang, R.1    Zhang, W.J.2    Ji, P.3
  • 8
    • 1842721579 scopus 로고
    • Estimating project risk
    • Roetzheim W.H. Estimating project risk. Information Executive. 3(1):1990;47-50.
    • (1990) Information Executive , vol.3 , Issue.1 , pp. 47-50
    • Roetzheim, W.H.1
  • 9
    • 0033908495 scopus 로고    scopus 로고
    • Modeling an asphalt pavement repair system considering fuzziness of budget constraints
    • Saitoh M. Modeling an asphalt pavement repair system considering fuzziness of budget constraints. Computer-Aided Civil and Infrastructure Engineering. 15:2000;39-44.
    • (2000) Computer-aided Civil and Infrastructure Engineering , vol.15 , pp. 39-44
    • Saitoh, M.1
  • 10
    • 0039768539 scopus 로고    scopus 로고
    • Selecting optimum mechanical systems for office buildings
    • Schaufelberger J.E., Jacobson R.H. Selecting optimum mechanical systems for office buildings. Cost Engineering. 42(5):2000;40-43.
    • (2000) Cost Engineering , vol.42 , Issue.5 , pp. 40-43
    • Schaufelberger, J.E.1    Jacobson, R.H.2
  • 11
    • 0035545606 scopus 로고    scopus 로고
    • Reliability-based assessment of aging bridges using risk ranking and life cycle cost decision analyses
    • Stewart S., Mark G. Reliability-based assessment of aging bridges using risk ranking and life cycle cost decision analyses. Reliability Engineering & System Safety. 74:2001;263-273.
    • (2001) Reliability Engineering & System Safety , vol.74 , pp. 263-273
    • Stewart, S.1    Mark, G.2
  • 12
    • 0030128197 scopus 로고    scopus 로고
    • A probabilistic cost estimating model
    • Uher T.E. A probabilistic cost estimating model. Cost Engineering. 38(1):1996;33-40.
    • (1996) Cost Engineering , vol.38 , Issue.1 , pp. 33-40
    • Uher, T.E.1
  • 14
    • 0031540745 scopus 로고    scopus 로고
    • Life cycle costing-theory, information acquisition and application
    • Woodward D.G. Life cycle costing-theory, information acquisition and application. International Journal of Project Management. 15(6):1997;335-344.
    • (1997) International Journal of Project Management , vol.15 , Issue.6 , pp. 335-344
    • Woodward, D.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.