-
2
-
-
0001176459
-
The Effect on Well Productivity of Formation Penetration Beyond Perforated Casing
-
McDowell, J.M. and Muskat, M.: "The Effect on Well Productivity of Formation Penetration Beyond Perforated Casing," Trans. AIME 189 (1950) 309-12.
-
(1950)
Trans. AIME
, vol.189
, pp. 309-312
-
-
McDowell, J.M.1
Muskat, M.2
-
3
-
-
0002125215
-
The Effect of Perforating on Well Productivity
-
April
-
Harris, M.H.: "The Effect of Perforating on Well Productivity," JPT (April 1966) 518-28.
-
(1966)
JPT
, pp. 518-528
-
-
Harris, M.H.1
-
4
-
-
0016126012
-
Effect of Perforation damage on Well Productivity
-
Nov.
-
Klotz, J.A., Krueger, R.F., and Pye, D.S.: "Effect of Perforation damage on Well Productivity," JPT (Nov. 1974) 1303-14.
-
(1974)
JPT
, pp. 1303-1314
-
-
Klotz, J.A.1
Krueger, R.F.2
Pye, D.S.3
-
5
-
-
0016573855
-
Unsteady Pressure Distribution Created by a Directionally Drilled Well
-
Nov.
-
Cinco, H., Miller, F.G., and Ramey, H.J.: "Unsteady Pressure Distribution Created by a Directionally Drilled Well," JPT (Nov. 1975) 1392-1400.
-
(1975)
JPT
, pp. 1392-1400
-
-
Cinco, H.1
Miller, F.G.2
Ramey, H.J.3
-
6
-
-
85058522588
-
Numerical Simulations of the Combined Effects of Wellbore Damage and Partial Penetration
-
paper SPE 8204 presented at the, Las Vegas, Sept. 23-26
-
Saidikowski, R.M: "Numerical Simulations of the Combined Effects of Wellbore Damage and Partial Penetration," paper SPE 8204 presented at the 1979 Annual Technical Conference and Exhibition, Las Vegas, Sept. 23-26.
-
1979 Annual Technical Conference and Exhibition
-
-
Saidikowski, R.M.1
-
7
-
-
0026106518
-
Semianalytical Productivity Models for Perforated Completions
-
Feb.
-
Karakas, M. and Tariq, S.M.: "Semianalytical Productivity Models for Perforated Completions," SPEPE (Feb. 1991) 73-82.
-
(1991)
SPEPE
, pp. 73-82
-
-
Karakas, M.1
Tariq, S.M.2
-
8
-
-
0016544869
-
Productivity of Perforated Completions in Formations With and Without Damage
-
Aug.
-
Hong, K.C.: "Productivity of Perforated Completions in Formations With and Without Damage," JPT (Aug. 1975) 1027-38.
-
(1975)
JPT
, pp. 1027-1038
-
-
Hong, K.C.1
-
9
-
-
0019710060
-
An Advanced Method for Predicting the Productivity Ratio of a Perforated Well
-
Dec.
-
Locke, S.: "An Advanced Method for Predicting the Productivity Ratio of a Perforated Well," JPT (Dec. 1981) 2481-88.
-
(1981)
JPT
, pp. 2481-2488
-
-
Locke, S.1
-
10
-
-
0023341713
-
Evaluation of Flow Characteristics of Perforations Including Nonlinear Effects With the Finite Element Method
-
May
-
Tariq, S.M.: "Evaluation of Flow Characteristics of Perforations Including Nonlinear Effects With the Finite Element Method," SPEPE (May 1987) 104-12.
-
(1987)
SPEPE
, pp. 104-112
-
-
Tariq, S.M.1
-
11
-
-
0031636734
-
Modeling of Well Productivity in Perforated Completions
-
paper SPE 51048 presented at the, Pittsburgh, PA, Nov. 09-11
-
Dogulu, Y.S.: "Modeling of Well Productivity in Perforated Completions," paper SPE 51048 presented at the 1998 SPE Eastern Regional Meeting, Pittsburgh, PA, Nov. 09-11
-
1998 SPE Eastern Regional Meeting
-
-
Dogulu, Y.S.1
|