-
3
-
-
0003536746
-
A reservation-based algorithm for scheduling both periodic and aperiodic real-time tasks
-
Dec.
-
Y.-C. Chang and K.G. Shin, "A Reservation-Based Algorithm for Scheduling Both Periodic and Aperiodic Real-Time Tasks," IEEE Trans. Computers, vol. 44, no. 12, pp. 1405-1419, Dec. 1995.
-
(1995)
IEEE Trans. Computers
, vol.44
, Issue.12
, pp. 1405-1419
-
-
Chang, Y.-C.1
Shin, K.G.2
-
4
-
-
20244385655
-
Utilization bound revisited
-
Dec.
-
D. Chen, A.K. Mok, and T.-W. Kuo, "Utilization Bound Revisited," Proc. Sixth Int'l Conf. Real-Time Computing Systems and Applications, pp. 295-302, Dec. 1999.
-
(1999)
Proc. Sixth Int'l Conf. Real-Time Computing Systems and Applications
, pp. 295-302
-
-
Chen, D.1
Mok, A.K.2
Kuo, T.-W.3
-
5
-
-
0029273434
-
Optimal priority assignment for aperiodic tasks with firm deadlines in fixed priority pre-emptive systems
-
Mar.
-
R. Davis and A. Burns, "Optimal Priority Assignment for Aperiodic Tasks with Firm Deadlines in Fixed Priority Pre-Emptive Systems," Information Processing Letters, vol. 53, no. 5, pp. 249-254, Mar. 1995.
-
(1995)
Information Processing Letters
, vol.53
, Issue.5
, pp. 249-254
-
-
Davis, R.1
Burns, A.2
-
6
-
-
0033890026
-
Liu and Layland's schedulability test revisited
-
Mar.
-
R. Devillers and J. Goossens, "Liu and Layland's Schedulability Test Revisited", Information Processing Letters, vol. 73, no. 5, pp. 157-161, Mar. 2000.
-
(2000)
Information Processing Letters
, vol.73
, Issue.5
, pp. 157-161
-
-
Devillers, R.1
Goossens, J.2
-
7
-
-
0034854204
-
Feedback control of a lotus notes server: Modeling and control design
-
N. Gandhi, S. Parekh, J. Hellerstein, and D. Tilbury, "Feedback Control of a Lotus Notes Server: Modeling and Control Design," Proc. Am. Control Conf., 2001.
-
Proc. Am. Control Conf., 2001
-
-
Gandhi, N.1
Parekh, S.2
Hellerstein, J.3
Tilbury, D.4
-
8
-
-
0032299764
-
A better polynomial-time schedulability test for real-time multiframe tasks
-
Dec.
-
C.-C. Han, "A Better Polynomial-Time Schedulability Test for Real-Time Multiframe Tasks," Proc. 19th IEEE Real-Time Systems Symp., pp. 104-113, Dec. 1998.
-
(1998)
Proc. 19th IEEE Real-Time Systems Symp.
, pp. 104-113
-
-
Han, C.-C.1
-
9
-
-
0031367385
-
A better polynomial-time schedulability test for real-time fixed-priority scheduling algorithms
-
Dec.
-
C.-C. Han and H.-Y. Tyan, "A Better Polynomial-Time Schedulability Test for Real-Time Fixed-Priority Scheduling Algorithms," Proc. 18th IEEE Real-Time Systems Symp., pp. 36-45, Dec. 1997.
-
(1997)
Proc. 18th IEEE Real-Time Systems Symp.
, pp. 36-45
-
-
Han, C.-C.1
Tyan, H.-Y.2
-
10
-
-
84880867136
-
D-over: An optimal on-line scheduling algorithm for overloaded real-time systems
-
Dec.
-
G. Koren and D. Shasha, "D-Over: An Optimal On-Line Scheduling Algorithm for Overloaded Real-Time Systems," Proc. IEEE Real-Time Systems Symp., pp. 290-299, Dec. 1992.
-
(1992)
Proc. IEEE Real-Time Systems Symp.
, pp. 290-299
-
-
Koren, G.1
Shasha, D.2
-
14
-
-
84880912464
-
An optimal algorithm for scheduling soft-aperiodic tasks in fixed-priority preemptive systems
-
Dec.
-
J. Lehoczky and S.R. Thuel, "An Optimal Algorithm for Scheduling Soft-Aperiodic Tasks in Fixed-Priority Preemptive Systems," Proc. Real-Time Systems Symp., pp. 110-123, Dec. 1992.
-
(1992)
Proc. Real-Time Systems Symp.
, pp. 110-123
-
-
Lehoczky, J.1
Thuel, S.R.2
-
16
-
-
0031163033
-
Using real-time queueing theory to control lateness in real-time systems
-
June
-
J.P. Lehoczky, "Using Real-Time Queueing Theory to Control Lateness in Real-Time Systems," Proc. 1997 ACM SIGMETRICS Int'l Conf. Measurement and Modeling of Computer Systems, Performance Evaluation Rev., vol. 25, no. 1, pp. 158-168, June 1997.
-
(1997)
Proc. 1997 ACM SIGMETRICS Int'l Conf. Measurement and Modeling of Computer Systems, Performance Evaluation Rev.
, vol.25
, Issue.1
, pp. 158-168
-
-
Lehoczky, J.P.1
-
17
-
-
0003126655
-
Scheduling periodic and aperiodic tasks in hard real-time computing systems
-
May
-
T.-H. Lin and W. Tarng, "Scheduling Periodic and Aperiodic Tasks in Hard Real-Time Computing Systems," Performance Evaluation Rev., vol. 19, no. 1, May 1991.
-
(1991)
Performance Evaluation Rev.
, vol.19
, Issue.1
-
-
Lin, T.-H.1
Tarng, W.2
-
18
-
-
84974687699
-
Scheduling algorithms for multiprogramming in a hard-real-time environment
-
C.L. Liu and J.W. Layland, "Scheduling Algorithms for Multi-programming in a Hard-Real-Time Environment," J. ACM, vol. 20, no. 1, pp. 46-61, 1973.
-
(1973)
J. ACM
, vol.20
, Issue.1
, pp. 46-61
-
-
Liu, C.L.1
Layland, J.W.2
-
19
-
-
84884679161
-
Worst-case utilization bound for EDF scheduling on real-time multiprocessor systems
-
June
-
J.M. Lopez, M. Garcia, J.L. Diaz, and D.F. Garcia, "Worst-Case Utilization Bound for EDF Scheduling on Real-Time Multi-processor Systems," Proc. 12th Euromicro Conf. Real-Time Systems, pp. 25-33, June 2000.
-
(2000)
Proc. 12th Euromicro Conf. Real-Time Systems
, pp. 25-33
-
-
Lopez, J.M.1
Garcia, M.2
Diaz, J.L.3
Garcia, D.F.4
-
20
-
-
0034834916
-
A feedback control approach for guaranteeing relative delays in web servers
-
C. Lu, T. Abdelzaher, J. Stankovic, and S. Son, "A Feedback Control Approach for Guaranteeing Relative Delays in Web Servers," Proc. IEEE Real-Time Technology and Applications Symp., June 2001.
-
Proc. IEEE Real-Time Technology and Applications Symp., June 2001
-
-
Lu, C.1
Abdelzaher, T.2
Stankovic, J.3
Son, S.4
-
22
-
-
0000311867
-
A multiframe model for real-time tasks
-
Oct.
-
A.K. Mok and D. Chen, "A Multiframe Model for Real-Time Tasks," IEEE Trans. Software Eng., vol. 23, no. 10, pp. 635-645, Oct. 1997.
-
(1997)
IEEE Trans. Software Eng.
, vol.23
, Issue.10
, pp. 635-645
-
-
Mok, A.K.1
Chen, D.2
-
23
-
-
84882700513
-
Dynamic end-to-end guarantees in distributed real-time systems
-
Dec.
-
M.D. Natale and J.A. Stankovic, "Dynamic End-to-End Guarantees in Distributed Real-Time Systems," Proc. Real-Time Systems Symp., pp. 216-227, Dec. 1994.
-
(1994)
Proc. Real-Time Systems Symp.
, pp. 216-227
-
-
Natale, M.D.1
Stankovic, J.A.2
-
24
-
-
0032166831
-
Utilization bounds for n-processor rate monotone scheduling with static processor assignment
-
D.-I. Oh and T.P.B. Tp, "Utilization Bounds for n-Processor Rate Monotone Scheduling with Static Processor Assignment," Real-Time Systems, vol. 15, no. 2, 1998.
-
(1998)
Real-Time Systems
, vol.15
, Issue.2
-
-
Oh, D.-I.1
Tp, T.P.B.2
-
25
-
-
0032181415
-
Minimum achievable utilization for fault-tolerant processing of periodic tasks
-
Oct.
-
M. Pandya and M. Malek, "Minimum Achievable Utilization for Fault-Tolerant Processing of Periodic Tasks," IEEE Trans. Computers, vol. 47, no. 10, pp. 1102-1112, Oct. 1998.
-
(1998)
IEEE Trans. Computers
, vol.47
, Issue.10
, pp. 1102-1112
-
-
Pandya, M.1
Malek, M.2
-
26
-
-
0030126351
-
Fixed-priority scheduling of real-time systems using utilization bounds
-
Apr.
-
D.-W. Park, S. Natarajan, and A. Kanevsky, "Fixed-Priority Scheduling of Real-Time Systems Using Utilization Bounds," J. Systems and Software, vol. 33, no. 1, pp. 57-63, Apr. 1996.
-
(1996)
J. Systems and Software
, vol.33
, Issue.1
, pp. 57-63
-
-
Park, D.-W.1
Natarajan, S.2
Kanevsky, A.3
-
27
-
-
0024716426
-
Distributed scheduling of computing tasks with deadlines and resource requirements
-
Aug.
-
K. Ramamritham, J.A. Stankovic, and W. Zhao, "Distributed Scheduling of Computing Tasks with Deadlines and Resource Requirements," IEEE Trans. Computers, vol. 38, no. 8, pp. 1110-1123, Aug. 1989.
-
(1989)
IEEE Trans. Computers
, vol.38
, Issue.8
, pp. 1110-1123
-
-
Ramamritham, K.1
Stankovic, J.A.2
Zhao, W.3
-
28
-
-
0027855071
-
Modified rate-monotonic algorithm for scheduling periodic jobs with deferred deadlines
-
Dec.
-
W.K. Shih, J. Liu, and C.L. Liu, "Modified Rate-Monotonic Algorithm for Scheduling Periodic Jobs with Deferred Deadlines," IEEE Trans. Software Eng., vol. 19, no. 12, pp. 1171-1179, Dec. 1993.
-
(1993)
IEEE Trans. Software Eng.
, vol.19
, Issue.12
, pp. 1171-1179
-
-
Shih, W.K.1
Liu, J.2
Liu, C.L.3
-
29
-
-
0024684902
-
Aperiodic task scheduling for hard-real-time systems
-
June
-
B. Sprunt, L. Sha, and J. Lehoczky, "Aperiodic Task Scheduling for Hard-Real-Time Systems," Real-Time Systems, vol. 1, no. 1, pp. 27-60, June 1989.
-
(1989)
Real-Time Systems
, vol.1
, Issue.1
, pp. 27-60
-
-
Sprunt, B.1
Sha, L.2
Lehoczky, J.3
-
30
-
-
0024626839
-
Decentralized decision making for task reallocation in a hard real-time system
-
Mar.
-
J. Stankovic, "Decentralized Decision Making for Task Reallocation in a Hard Real-Time System," IEEE Trans. Computers, vol. 38, no. 3, pp. 341-355, Mar. 1989.
-
(1989)
IEEE Trans. Computers
, vol.38
, Issue.3
, pp. 341-355
-
-
Stankovic, J.1
-
33
-
-
0026152309
-
The spring kernel: A new paradigm for real-time systems
-
May
-
J.A. Stankovic and K. Ramamritham, "The Spring Kernel: A New Paradigm for Real-Time Systems," IEEE Software, pp. 62-72, May 1991.
-
(1991)
IEEE Software
, pp. 62-72
-
-
Stankovic, J.A.1
Ramamritham, K.2
-
34
-
-
0022305511
-
Evaluation of a flexible task scheduling algorithm for distributed hard real-time systems
-
Dec.
-
J.A. Stankovic, K. Ramamritham, and S. Cheng, "Evaluation of a Flexible Task Scheduling Algorithm for Distributed Hard Real-Time Systems," IEEE Trans. Computers, vol. 34, no. 12, pp. 1130-1143, Dec. 1985.
-
(1985)
IEEE Trans. Computers
, vol.34
, Issue.12
, pp. 1130-1143
-
-
Stankovic, J.A.1
Ramamritham, K.2
Cheng, S.3
-
35
-
-
0002242754
-
A feedback-driven proportion allocator for real-rate scheduling
-
D.C. Steere, A. Goel, J. Gruenberg, D. McNamee, C. Pu, and J. Walpole, "A Feedback-Driven Proportion Allocator for Real-Rate Scheduling," Operating Systems Design and Implementation, 1999.
-
(1999)
Operating Systems Design and Implementation
-
-
Steere, D.C.1
Goel, A.2
Gruenberg, J.3
McNamee, D.4
Pu, C.5
Walpole, J.6
-
36
-
-
0029230309
-
The deferrable server algorithm for enhanced aperiodic responsiveness in hard real-time environments
-
Jan.
-
J.K. Strosnider, J.P. Lehoczky, and L. Sha, "The Deferrable Server Algorithm for Enhanced Aperiodic Responsiveness in Hard Real-Time Environments," IEEE Trans. Computers, vol. 44, no. 1, pp. 73-91, Jan. 1995.
-
(1995)
IEEE Trans. Computers
, vol.44
, Issue.1
, pp. 73-91
-
-
Strosnider, J.K.1
Lehoczky, J.P.2
Sha, L.3
-
37
-
-
84882603405
-
Algorithms for scheduling hard aperiodic tasks in fixed-priority systems using slack stealing
-
Dec.
-
S.R. Thuel and J.P. Lehoczky, "Algorithms for Scheduling Hard Aperiodic Tasks in Fixed-Priority Systems Using Slack Stealing," Proc. Real-Time Systems Symp., pp. 22-33, Dec. 1994.
-
(1994)
Proc. Real-Time Systems Symp.
, pp. 22-33
-
-
Thuel, S.R.1
Lehoczky, J.P.2
-
38
-
-
0029411663
-
Allocating fixed-priority periodic tasks on multiprocessor systems
-
Nov.
-
O. Yingfeng and S.H. Son, "Allocating Fixed-Priority Periodic Tasks on Multiprocessor Systems," Real-Time Systems, vol. 9, no. 3, pp. 207-239, Nov. 1995.
-
(1995)
Real-Time Systems
, vol.9
, Issue.3
, pp. 207-239
-
-
Yingfeng, O.1
Son, S.H.2
-
39
-
-
0023401687
-
Preemptive scheduling under time and resource constraints
-
Aug.
-
W. Zhao, K. Ramamritham, and J. Stankovic, "Preemptive Scheduling under Time and Resource Constraints," IEEE Trans. Computers, vol. 36, no. 8, pp. 949-960, Aug. 1987.
-
(1987)
IEEE Trans. Computers
, vol.36
, Issue.8
, pp. 949-960
-
-
Zhao, W.1
Ramamritham, K.2
Stankovic, J.3
-
40
-
-
0023347828
-
Scheduling tasks with Resource requirements in hard real-time systems
-
May
-
W. Zhao, K. Ramamritham, and J. Stankovic, "Scheduling Tasks with Resource Requirements in Hard Real-Time Systems," IEEE Trans. Software Eng., vol. 13, no. 5, pp. 564-577, May 1987.
-
(1987)
IEEE Trans. Software Eng.
, vol.13
, Issue.5
, pp. 564-577
-
-
Zhao, W.1
Ramamritham, K.2
Stankovic, J.3
|