|
Volumn 13, Issue , 2003, Pages 233-238
|
Successful Use of a Cost-Effective Temporary Non damaging Gel Plug System to Isolate a Highly Permeable Producing Zone During a Stimulation Job of a Low-Permeability Gas-Producing Zone in Khuff Gas Reservoir in Bahrain - A Case History
|
Author keywords
[No Author keywords available]
|
Indexed keywords
CARBONATES;
COST EFFECTIVENESS;
ELECTRICITY;
FRACTURE;
HYDROCHLORIC ACID;
MECHANICAL PERMEABILITY;
OIL WELLS;
OPTIMIZATION;
PETROLEUM ENGINEERING;
PHASE EQUILIBRIA;
SANDSTONE;
STRESSES;
BAHRAIN;
GAS INJECTION;
PRODUCTIVITY INDEX;
MULTIPLE ZONES;
|
EID: 1842558231
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.2118/81441-ms Document Type: Conference Paper |
Times cited : (2)
|
References (7)
|