Volumn 40, Issue 3, 2002, Pages 259-276

Ant colony optimization algorithm with multiple visibility matrices for the resolution of a problem of industrial plant scheduling;Algorithme d'optimisation par colonie de fourmis avec matrices de visibilité multiples pour la résolution d'un problème d'ordonnancement industriel

Author keywords

Ant colony optimization; Metaheuristic; Multiple objectives; Scheduling; Sequence dependent setups

Indexed keywords

ALGORITHMS; MATRIX ALGEBRA; METAL CASTING; OPTIMIZATION; PROBLEM SOLVING;

EID: 18344414102     PISSN: 03155986     EISSN: None     Source Type: Journal    
DOI: 10.1080/03155986.2002.11732657     Document Type: Article
Times cited : (11)

References (27)
  • 1
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Omega
    • Allahverdi A., Gupta J.N.D. and T. Aldowaisan (1999), A review of scheduling research involving setup considerations, Omega, 27, 219-239.
    • (1999) Omega , vol.27 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 3
    • 84944661914 scopus 로고
    • Rank transformations as a bridge between parametric and nonparametric statistics
    • Conover W.J. and R.L. Iman (1981), Rank transformations as a bridge between parametric and nonparametric statistics, The American Statistician, 35, 124-129.
    • (1981) The American Statistician , vol.35 , pp. 124-129
    • Conover, W.J.1    Iman, R.L.2
  • 5
    • 0029407502 scopus 로고
    • A saving index heuristic algorithm for flowshop scheduling with sequence dependent set-up times
    • Das S.R., Gupta J.N.D. and B.M Khumawala (1995), A saving index heuristic algorithm for flowshop scheduling with sequence dependent set-up times, The Journal of the Operational Research Society, 46, 1365-1373.
    • (1995) The Journal of the Operational Research Society , vol.46 , pp. 1365-1373
    • Das, S.R.1    Gupta, J.N.D.2    Khumawala, B.3
  • 7
    • 84947590162 scopus 로고
    • Collective patterns and decision-making
    • Deneubourg J.L. and S. Goss (1989), Collective patterns and decision-making, Ethology & Evolution, 1, 295-311.
    • (1989) Ethology & Evolution , vol.1 , pp. 295-311
    • Deneubourg, J.L.1    Goss, S.2
  • 9
    • 0002012598 scopus 로고    scopus 로고
    • The ant colony optimization meta-heuristic
    • D. Corne, M. Dorigo and F. Glover Editors, McGraw-Hill
    • Dorigo M. and G. Di Caro (1999), The Ant Colony Optimization Meta-Heuristic, In: D. Corne, M. Dorigo and F. Glover Editors, New Ideas in Optimization, McGraw-Hill.
    • (1999) New Ideas in Optimization
    • Dorigo, M.1    Di Caro, G.2
  • 10
    • 0030759617 scopus 로고    scopus 로고
    • Ant colonies for the traveling salesman problem
    • Dorigo M. and L.M. Gambardella (1997), Ant colonies for the traveling salesman problem, BioSystems, 43, 73-81.
    • (1997) BioSystems , vol.43 , pp. 73-81
    • Dorigo, M.1    Gambardella, L.M.2
  • 13
    • 0000474126 scopus 로고
    • Minimizing total tardiness on one machine is NP-hard
    • Du J. and J.Y. Leung (1990), Minimizing total tardiness on one machine is NP-hard, Mathematics of Operations Research, 15, 483-494.
    • (1990) Mathematics of Operations Research , vol.15 , pp. 483-494
    • Du, J.1    Leung, J.Y.2
  • 15
    • 0036682205 scopus 로고    scopus 로고
    • Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times
    • Gagné C., Price W.L. and M. Gravel (2002), Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times, Journal of the Operational Research Society, 53, 895-906.
    • (2002) Journal of the Operational Research Society , vol.53 , pp. 895-906
    • Gagné, C.1    Price, W.L.2    Gravel, M.3
  • 16
    • 18744405670 scopus 로고    scopus 로고
    • Scheduling jobs in a Alcan aluminium factory using a genetic algorithm
    • Gravel M., Price W. and C. Gagné (2000), Scheduling jobs in a Alcan aluminium factory using a genetic algorithm, International Journal of Production Research, 38 (13), 3031-3041.
    • (2000) International Journal of Production Research , vol.38 , Issue.13 , pp. 3031-3041
    • Gravel, M.1    Price, W.2    Gagné, C.3
  • 17
    • 0037121184 scopus 로고    scopus 로고
    • Scheduling continuous casting of aluminum using a multiple-objective ant colony optimization metaheuristic
    • In press
    • Gravel M., Price W. and C. Gagné (2002), Scheduling continuous casting of aluminum using a multiple-objective ant colony optimization metaheuristic, European Journal of Operational Research, (In press).
    • (2002) European Journal of Operational Research
    • Gravel, M.1    Price, W.2    Gagné, C.3
  • 18
    • 0001193147 scopus 로고    scopus 로고
    • The traveling salesman problem: A case study in local optmization
    • E.H.L. Aarts & J.K. Lenstra editors, John Wiley and Sons Ltd.
    • Johnson D.S. and L.A. McGeoch (1997), The traveling salesman problem: a case study in local optmization, Local Search in Combinatorial Optimization, E.H.L. Aarts & J.K. Lenstra editors, John Wiley and Sons Ltd., 215-310.
    • (1997) Local Search in Combinatorial Optimization , pp. 215-310
    • Johnson, D.S.1    McGeoch, L.A.2
  • 19
    • 0028550668 scopus 로고
    • The total tardiness problem: Review and extensions
    • Koulamas C. (1994), The total tardiness problem: review and extensions, Operations research, 42 (6), 1025-1041.
    • (1994) Operations Research , vol.42 , Issue.6 , pp. 1025-1041
    • Koulamas, C.1
  • 21
    • 0002415441 scopus 로고
    • A branch-and-bound method for minimum tardiness sequencing on a single processor with sequence dependent setup times
    • Ragatz G.L. (1993), A branch-and-bound method for minimum tardiness sequencing on a single processor with sequence dependent setup times, Proceedings: Twenty-fourth Annual Meeting of the Decision Sciences Institute, 1375-1377.
    • (1993) Proceedings: Twenty-fourth Annual Meeting of the Decision Sciences Institute , pp. 1375-1377
    • Ragatz, G.L.1
  • 22
    • 0028368126 scopus 로고
    • Scheduling in a sequence dependent setup environment with genetic search
    • Rubin P.A. and G.L. Ragatz (1995), Scheduling in a sequence dependent setup environment with genetic search, Computers and Operations Research, 22 (2), 85-99.
    • (1995) Computers and Operations Research , vol.22 , Issue.2 , pp. 85-99
    • Rubin, P.A.1    Ragatz, G.L.2
  • 23
    • 0031521417 scopus 로고    scopus 로고
    • Minimizing tardiness on a single processor with sequence-dependent setup times: A simulated annealing approach
    • Tan K.C. and R. Narasimhan (1997), Minimizing tardiness on a single processor with sequence-dependent setup times: a simulated annealing approach, Omega, 25 (6), 619-634.
    • (1997) Omega , vol.25 , Issue.6 , pp. 619-634
    • Tan, K.C.1    Narasimhan, R.2
  • 24
    • 0034196175 scopus 로고    scopus 로고
    • A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times
    • Tan K.C., Narasimhan R., Rubin PA. and G.L. Ragatz (2000), A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times, Omega, 28, 313-326.
    • (2000) Omega , vol.28 , pp. 313-326
    • Tan, K.C.1    Narasimhan, R.2    Rubin, Pa.3    Ragatz, G.L.4
  • 25
    • 0345403299 scopus 로고
    • The influence of setup time on job performance
    • Wilbrecht J.K. and W.B. Prescott (1969). The influence of setup time on job performance, Management Science, 16, 274-280.
    • (1969) Management Science , vol.16 , pp. 274-280
    • Wilbrecht, J.K.1    Prescott, W.B.2
  • 26
    • 0002998497 scopus 로고
    • Managing capacity: Getting the most from your firms assets
    • Wortman D.B. (1992), Managing capacity: getting the most from your firms assets, Industrial Engineering, 24, 47-49.
    • (1992) Industrial Engineering , vol.24 , pp. 47-49
    • Wortman, D.B.1
  • 27


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.