-
1
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
Omega
-
Allahverdi A., Gupta J.N.D. and T. Aldowaisan (1999), A review of scheduling research involving setup considerations, Omega, 27, 219-239.
-
(1999)
Omega
, vol.27
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
2
-
-
0002400184
-
Distributed optimization by ant-colonies
-
edited by F. Varela and P. Bourgine, Cambridge, Mass, USA, MIT Press
-
Colorni A., Dorigo M. and V. Maniezzo (1991), Distributed optimization by ant-colonies, in Proceedings of the European Conference on Artificial Life (ECAL'91), edited by F. Varela and P. Bourgine, 134-142, Cambridge, Mass, USA, MIT Press.
-
(1991)
Proceedings of the European Conference on Artificial Life (ECAL'91)
, pp. 134-142
-
-
Colorni, A.1
Dorigo, M.2
Maniezzo, V.3
-
3
-
-
84944661914
-
Rank transformations as a bridge between parametric and nonparametric statistics
-
Conover W.J. and R.L. Iman (1981), Rank transformations as a bridge between parametric and nonparametric statistics, The American Statistician, 35, 124-129.
-
(1981)
The American Statistician
, vol.35
, pp. 124-129
-
-
Conover, W.J.1
Iman, R.L.2
-
5
-
-
0029407502
-
A saving index heuristic algorithm for flowshop scheduling with sequence dependent set-up times
-
Das S.R., Gupta J.N.D. and B.M Khumawala (1995), A saving index heuristic algorithm for flowshop scheduling with sequence dependent set-up times, The Journal of the Operational Research Society, 46, 1365-1373.
-
(1995)
The Journal of the Operational Research Society
, vol.46
, pp. 1365-1373
-
-
Das, S.R.1
Gupta, J.N.D.2
Khumawala, B.3
-
6
-
-
33750016472
-
Probabilistic behaviour in ants: A strategy of errors?
-
Deneubourg J.L., Pasteels J.M. and J.C. Verhaeghe (1983), Probabilistic behaviour in ants: A strategy of errors?, Journal of Theorical Biology, 105, 259-271.
-
(1983)
Journal of Theorical Biology
, vol.105
, pp. 259-271
-
-
Deneubourg, J.L.1
Pasteels, J.M.2
Verhaeghe, J.C.3
-
7
-
-
84947590162
-
Collective patterns and decision-making
-
Deneubourg J.L. and S. Goss (1989), Collective patterns and decision-making, Ethology & Evolution, 1, 295-311.
-
(1989)
Ethology & Evolution
, vol.1
, pp. 295-311
-
-
Deneubourg, J.L.1
Goss, S.2
-
9
-
-
0002012598
-
The ant colony optimization meta-heuristic
-
D. Corne, M. Dorigo and F. Glover Editors, McGraw-Hill
-
Dorigo M. and G. Di Caro (1999), The Ant Colony Optimization Meta-Heuristic, In: D. Corne, M. Dorigo and F. Glover Editors, New Ideas in Optimization, McGraw-Hill.
-
(1999)
New Ideas in Optimization
-
-
Dorigo, M.1
Di Caro, G.2
-
10
-
-
0030759617
-
Ant colonies for the traveling salesman problem
-
Dorigo M. and L.M. Gambardella (1997), Ant colonies for the traveling salesman problem, BioSystems, 43, 73-81.
-
(1997)
BioSystems
, vol.43
, pp. 73-81
-
-
Dorigo, M.1
Gambardella, L.M.2
-
11
-
-
0004061426
-
-
Technical Report No 91-016, Politecnico di Milano, Italy, pages
-
Dorigo M., Maniezzo V. and A. Colorni (1991), Positive feedback as a search strategy, Technical Report No 91-016, Politecnico di Milano, Italy, 20 pages.
-
(1991)
Positive Feedback as a Search Strategy
, pp. 20
-
-
Dorigo, M.1
Maniezzo, V.2
Colorni, A.3
-
12
-
-
0030082551
-
Ant system: Optimization by a colony of cooperating agents
-
Dorigo M., Maniezzo V. and A. Colorni (1996), Ant system: optimization by a colony of cooperating agents, IEEE transactions on System, Man & Cybernitic, 26 (1), 29-41.
-
(1996)
IEEE Transactions on System, Man & Cybernitic
, vol.26
, Issue.1
, pp. 29-41
-
-
Dorigo, M.1
Maniezzo, V.2
Colorni, A.3
-
13
-
-
0000474126
-
Minimizing total tardiness on one machine is NP-hard
-
Du J. and J.Y. Leung (1990), Minimizing total tardiness on one machine is NP-hard, Mathematics of Operations Research, 15, 483-494.
-
(1990)
Mathematics of Operations Research
, vol.15
, pp. 483-494
-
-
Du, J.1
Leung, J.Y.2
-
14
-
-
0030170363
-
A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times
-
Franca P.M., Gendreau M., Laporte G. and F.M. Muller (1996), A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times, International Journal of Production Economics, 43, 79-89.
-
(1996)
International Journal of Production Economics
, vol.43
, pp. 79-89
-
-
Franca, P.M.1
Gendreau, M.2
Laporte, G.3
Muller, F.M.4
-
15
-
-
0036682205
-
Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times
-
Gagné C., Price W.L. and M. Gravel (2002), Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times, Journal of the Operational Research Society, 53, 895-906.
-
(2002)
Journal of the Operational Research Society
, vol.53
, pp. 895-906
-
-
Gagné, C.1
Price, W.L.2
Gravel, M.3
-
16
-
-
18744405670
-
Scheduling jobs in a Alcan aluminium factory using a genetic algorithm
-
Gravel M., Price W. and C. Gagné (2000), Scheduling jobs in a Alcan aluminium factory using a genetic algorithm, International Journal of Production Research, 38 (13), 3031-3041.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.13
, pp. 3031-3041
-
-
Gravel, M.1
Price, W.2
Gagné, C.3
-
17
-
-
0037121184
-
Scheduling continuous casting of aluminum using a multiple-objective ant colony optimization metaheuristic
-
In press
-
Gravel M., Price W. and C. Gagné (2002), Scheduling continuous casting of aluminum using a multiple-objective ant colony optimization metaheuristic, European Journal of Operational Research, (In press).
-
(2002)
European Journal of Operational Research
-
-
Gravel, M.1
Price, W.2
Gagné, C.3
-
18
-
-
0001193147
-
The traveling salesman problem: A case study in local optmization
-
E.H.L. Aarts & J.K. Lenstra editors, John Wiley and Sons Ltd.
-
Johnson D.S. and L.A. McGeoch (1997), The traveling salesman problem: a case study in local optmization, Local Search in Combinatorial Optimization, E.H.L. Aarts & J.K. Lenstra editors, John Wiley and Sons Ltd., 215-310.
-
(1997)
Local Search in Combinatorial Optimization
, pp. 215-310
-
-
Johnson, D.S.1
McGeoch, L.A.2
-
19
-
-
0028550668
-
The total tardiness problem: Review and extensions
-
Koulamas C. (1994), The total tardiness problem: review and extensions, Operations research, 42 (6), 1025-1041.
-
(1994)
Operations Research
, vol.42
, Issue.6
, pp. 1025-1041
-
-
Koulamas, C.1
-
21
-
-
0002415441
-
A branch-and-bound method for minimum tardiness sequencing on a single processor with sequence dependent setup times
-
Ragatz G.L. (1993), A branch-and-bound method for minimum tardiness sequencing on a single processor with sequence dependent setup times, Proceedings: Twenty-fourth Annual Meeting of the Decision Sciences Institute, 1375-1377.
-
(1993)
Proceedings: Twenty-fourth Annual Meeting of the Decision Sciences Institute
, pp. 1375-1377
-
-
Ragatz, G.L.1
-
22
-
-
0028368126
-
Scheduling in a sequence dependent setup environment with genetic search
-
Rubin P.A. and G.L. Ragatz (1995), Scheduling in a sequence dependent setup environment with genetic search, Computers and Operations Research, 22 (2), 85-99.
-
(1995)
Computers and Operations Research
, vol.22
, Issue.2
, pp. 85-99
-
-
Rubin, P.A.1
Ragatz, G.L.2
-
23
-
-
0031521417
-
Minimizing tardiness on a single processor with sequence-dependent setup times: A simulated annealing approach
-
Tan K.C. and R. Narasimhan (1997), Minimizing tardiness on a single processor with sequence-dependent setup times: a simulated annealing approach, Omega, 25 (6), 619-634.
-
(1997)
Omega
, vol.25
, Issue.6
, pp. 619-634
-
-
Tan, K.C.1
Narasimhan, R.2
-
24
-
-
0034196175
-
A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times
-
Tan K.C., Narasimhan R., Rubin PA. and G.L. Ragatz (2000), A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times, Omega, 28, 313-326.
-
(2000)
Omega
, vol.28
, pp. 313-326
-
-
Tan, K.C.1
Narasimhan, R.2
Rubin, Pa.3
Ragatz, G.L.4
-
25
-
-
0345403299
-
The influence of setup time on job performance
-
Wilbrecht J.K. and W.B. Prescott (1969). The influence of setup time on job performance, Management Science, 16, 274-280.
-
(1969)
Management Science
, vol.16
, pp. 274-280
-
-
Wilbrecht, J.K.1
Prescott, W.B.2
-
26
-
-
0002998497
-
Managing capacity: Getting the most from your firms assets
-
Wortman D.B. (1992), Managing capacity: getting the most from your firms assets, Industrial Engineering, 24, 47-49.
-
(1992)
Industrial Engineering
, vol.24
, pp. 47-49
-
-
Wortman, D.B.1
|