-
1
-
-
84988470567
-
Production and wield weldability evaluation of X100 linepipe
-
New Orleans
-
Barsanti, L, Pozzoli, G, and Hillenbrand, H-G (2001). "Production and Field Weldability Evaluation of X100 Linepipe," 13th Joint Mtg PRCI-EPRG, New Orleans, pp 7.1-7.23.
-
(2001)
13th Joint Mtg PRCI-EPRG
-
-
Barsanti, L.1
Pozzoli, G.2
Hillenbrand, H.-G.3
-
2
-
-
0942282196
-
Longitudinal welded X80 pipes for a high temperature, high pressure steam pipeline
-
Bishop, MD, Reepmeyer, O, Hillenbrand, H-G, Schröder, J, and. Liessem, A (2002). "Longitudinal Welded X80 Pipes for a High Temperature, High Pressure Steam Pipeline," 3 R Int, Vol 41. No 2, pp 113-117.
-
(2002)
3 R Int
, vol.41
, Issue.2
, pp. 113-117
-
-
Bishop, M.D.1
Reepmeyer, O.2
Hillenbrand, H.-G.3
Schröder, J.4
Liessem, A.5
-
3
-
-
0029632111
-
German gas pipeline first to use new generation linepipe
-
Chaudhari, V, Ritzmann, HP, Wellnitz, G, Hillenbrand, H-G, and Willings, V (1995). "German Gas Pipeline First To Use New Generation Linepipe," Oil & Gas J, Vol 33, No 2, pp 40-47.
-
(1995)
Oil and Gas J
, vol.33
, Issue.2
, pp. 40-47
-
-
Chaudhari, V.1
Ritzmann, H.P.2
Wellnitz, G.3
Hillenbrand, H.-G.4
Willings, V.5
-
4
-
-
0942271392
-
Fracture behaviour of X100 gas pipeline by full scale tests
-
Yokohama
-
Demofonti, G, Mannucci, G, Harris, D, Hillenbrand, H-G, and Barsanti, L (2002). "Fracture Behaviour of X100 Gas Pipeline by Full Scale Tests," Int Conf Appl and Eval of High-grade Linepipe in Hostile Environ, Yokohama, pp 245-261.
-
(2002)
Int Conf Appl and Eval of High-grade Linepipe in Hostile Environ
, pp. 245-261
-
-
Demofonti, G.1
Mannucci, G.2
Harris, D.3
Hillenbrand, H.-G.4
Barsanti, L.5
-
5
-
-
0942271386
-
First use of large-diameter pipes of the steel GRS 550 TM (X80)
-
Engelmann, H, Engel, A, Peters, PA, Düren, C, and Müsch, H (1986). "First Use of Large-diameter Pipes of the Steel GRS 550 TM (X80)," 3R International, Vol 25, No 4, pp 182-193.
-
(1986)
3R International
, vol.25
, Issue.4
, pp. 182-193
-
-
Engelmann, H.1
Engel, A.2
Peters, P.A.3
Düren, C.4
Müsch, H.5
-
6
-
-
24444433747
-
High quality pipe-a prerequisite for project cost reduction
-
Arlington, Virginia
-
Gräf, MK, and Hillenbrand, H-G (1997). "High Quality Pipe-A Prerequisite for Project Cost Reduction," 11th PRCI-EPRG Joint Tech Mtg, Arlington, Virginia, pp 3.1-3.15.
-
(1997)
11th PRCI-EPRG Joint Tech Mtg
-
-
Gräf, M.K.1
Hillenbrand, H.-G.2
-
7
-
-
0001583882
-
Development of large-diameter pipe in grade X100 - State of the art report from the manufacturer's point of view
-
Brugge, Belgium
-
Hillenbrand, H-G, Liessem, A, Knauf, G, Niederhoff, KA, and Bauer, J (2000). "Development of Large-diameter Pipe in Grade X100-State of the Art Report from The Manufacturer's Point of View," Int Pipeline Tech Conf, Brugge, Belgium, pp 469-482.
-
(2000)
Int Pipeline Tech Conf
, pp. 469-482
-
-
Hillenbrand, H.-G.1
Liessem, A.2
Knauf, G.3
Niederhoff, K.A.4
Bauer, J.5
-
8
-
-
0031405648
-
Procedure, considerations for welding X80 linepipe established
-
Hillenbrand, H-G, Niederhoff, KA, Hauck, G, Perteneder, E, and Wellnitz, G (1997). "Procedure, Considerations for Welding X80 Linepipe Established," Oil & Gas J, Vol 95, No 73, pp 47-56.
-
(1997)
Oil and Gas J
, vol.95
, Issue.73
, pp. 47-56
-
-
Hillenbrand, H.-G.1
Niederhoff, K.A.2
Hauck, G.3
Perteneder, E.4
Wellnitz, G.5
-
9
-
-
0942293141
-
Production and progress work of plates for pipes with strength level of X80 and above
-
Yokohama
-
Schwinn, V, Fluess, P, and Bauer, J (2002). "Production and Progress Work of Plates for Pipes with Strength Level of X80 and Above." Int Conf Appl and Eval of High-grade Linepipes in Hostile Environ, Yokohama, pp 339-353.
-
(2002)
Int Conf Appl and Eval of High-grade Linepipes in Hostile Environ
, pp. 339-353
-
-
Schwinn, V.1
Fluess, P.2
Bauer, J.3
|