메뉴 건너뛰기




Volumn 25, Issue 4, 2005, Pages 158-165

Fuzzy gain scheduled model predictive control for boiler-turbine coordinated system

Author keywords

Boiler Turbine system; Constrained optimization; Gain Scheduling; Global fuzzy model; Predictive control; Thermal power engineering

Indexed keywords

COMPUTER SIMULATION; DISCRETE TIME CONTROL SYSTEMS; FUZZY SETS; GAIN CONTROL; GLOBAL OPTIMIZATION; PREDICTIVE CONTROL SYSTEMS; STEAM TURBINES;

EID: 16644378794     PISSN: 02588013     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Article
Times cited : (33)

References (20)
  • 2
    • 16644376912 scopus 로고    scopus 로고
    • Study and application of optimal control strategy for automatic generating control (AGC)
    • Zhou Gang, Lu Jianhong, Wei Hongqi et al. Study and application of optimal control strategy for automatic generating control (AGC)[J]. Electric Power. 2004, 37(1): 57-61.
    • (2004) Electric Power , vol.37 , Issue.1 , pp. 57-61
    • Zhou, G.1    Lu, J.2    Wei, H.3
  • 3
    • 0342298451 scopus 로고    scopus 로고
    • Drum-boiler dynamics
    • Astrom K J, Bell R D. Drum-boiler dynamics[J]. Automatica, 2000, 36(3): 363-378.
    • (2000) Automatica , vol.36 , Issue.3 , pp. 363-378
    • Astrom, K.J.1    Bell, R.D.2
  • 4
    • 0035243791 scopus 로고    scopus 로고
    • Simulation on a load control system of thermal power units based on the feedback signal of radiant energy
    • Zhang Shishuai, Zhou Huaichun, Huang Yongli et al. Simulation on a load control system of thermal power units based on the feedback signal of radiant energy[J]. Proceedings of the Chinese Society for Electrical Engineering, 2001, 21(2): 85-88.
    • (2001) Proceedings of the Chinese Society for Electrical Engineering , vol.21 , Issue.2 , pp. 85-88
    • Zhang, S.1    Zhou, H.2    Huang, Y.3
  • 5
    • 0036552154 scopus 로고    scopus 로고
    • Multivariable model predictive control for thermal power unit load system
    • Ju Gang, Wei Hongqi, Chen Shaobing et al. Multivariable Model Predictive Control for Thermal Power Unit Load System[J]. Proceedings of the Chinese Society for Electrical Engineering, 2002, 22(4): 144-148.
    • (2002) Proceedings of the Chinese Society for Electrical Engineering , vol.22 , Issue.4 , pp. 144-148
    • Ju, G.1    Wei, H.2    Chen, S.3
  • 7
    • 0029512720 scopus 로고
    • Boiler-turbine control system design using a genetic algorithm
    • Dimeo R, Lee K Y. Boiler-turbine control system design using a genetic algorithm[J]. IEEE Transactions on Energy Conversion, 1995, 10(4): 752-759.
    • (1995) IEEE Transactions on Energy Conversion , vol.10 , Issue.4 , pp. 752-759
    • Dimeo, R.1    Lee, K.Y.2
  • 8
    • 0001761076 scopus 로고    scopus 로고
    • Research on gain scheduling
    • Rugh W J, Shamma J S. Research on gain scheduling[J]. Automatica, 2000, 36(10): 1401-1425.
    • (2000) Automatica , vol.36 , Issue.10 , pp. 1401-1425
    • Rugh, W.J.1    Shamma, J.S.2
  • 9
    • 0031987426 scopus 로고    scopus 로고
    • Off-equilibrium linearisation and design of gain-scheduled control with application to vehicle speed control
    • Johansen T A, Hunt K J, Gawthrop P J. Off-equilibrium linearisation and design of gain-scheduled control with application to vehicle speed control[J]. Control Engineering Practice, 1998, 6(2): 167-180.
    • (1998) Control Engineering Practice , vol.6 , Issue.2 , pp. 167-180
    • Johansen, T.A.1    Hunt, K.J.2    Gawthrop, P.J.3
  • 10
    • 0344513324 scopus 로고    scopus 로고
    • 1-optimal control for boiler-turbine dynamics with actuator saturation
    • 1-optimal control for boiler-turbine dynamics with actuator saturation[J]. Journal of Process Control, 2004, 14(3): 263-277.
    • (2004) Journal of Process Control , vol.14 , Issue.3 , pp. 263-277
    • Chan, P.1    Shamma, J.S.2
  • 11
    • 1442278666 scopus 로고    scopus 로고
    • Gain scheduled servo system for boiler-turbine unit
    • Huang Zuyi, Li Donghai, Jiang Xuezhi et al. Gain scheduled servo system for boiler-turbine unit[J]. Proceedings of the CSEE, 2003, 23(10): 191-198.
    • (2003) Proceedings of the CSEE , vol.23 , Issue.10 , pp. 191-198
    • Huang, Z.1    Li, D.2    Jiang, X.3
  • 12
    • 0142196087 scopus 로고    scopus 로고
    • Controller synthesis of fuzzy dynamic systems based on piecewise Lyapunov function
    • Feng Gang. Controller synthesis of fuzzy dynamic systems based on piecewise Lyapunov function[J]. IEEE Transactions on Fuzzy Systems, 2003. 11(5): 605-612.
    • (2003) IEEE Transactions on Fuzzy Systems , vol.11 , Issue.5 , pp. 605-612
    • Feng, G.1
  • 13
    • 0038200961 scopus 로고    scopus 로고
    • Fuzzy gain scheduling: controller and observer design based on Lyapunov method and convex optimization
    • Korba P, Babuska R. Fuzzy gain scheduling: controller and observer design based on Lyapunov method and convex optimization[J]. IEEE Transactions on Fuzzy Systems, 2003, 11(3): 285-298.
    • (2003) IEEE Transactions on Fuzzy Systems , vol.11 , Issue.3 , pp. 285-298
    • Korba, P.1    Babuska, R.2
  • 14
    • 0033907827 scopus 로고    scopus 로고
    • A tutorial on linear and bilinear matrix inequalities
    • VanAntwerp J G, Braatz R D. A tutorial on linear and bilinear matrix inequalities[J]. Journal of Process Control, 2000, 10(4): 363-385.
    • (2000) Journal of Process Control , vol.10 , Issue.4 , pp. 363-385
    • VanAntwerp, J.G.1    Braatz, R.D.2
  • 15
    • 0038177968 scopus 로고    scopus 로고
    • A dynamic fuzzy model for a drum-boiler-turbine system
    • Habbi H, Zelmat M, Bouamama B O. A dynamic fuzzy model for a drum-boiler-turbine system[J]. Automatica, 2003, 39(7): 1213-1219.
    • (2003) Automatica , vol.39 , Issue.7 , pp. 1213-1219
    • Habbi, H.1    Zelmat, M.2    Bouamama, B.O.3
  • 16
    • 0034205619 scopus 로고    scopus 로고
    • On the interpretation and identification of dynamic Takagi-Sugeno fuzzy models
    • Johansen T A, Shorten R, Murray-Smith R. On the interpretation and identification of dynamic Takagi-Sugeno fuzzy models[J]. IEEE Transactions on Fuzzy Systems, 2000, 8(3): 297-312.
    • (2000) IEEE Transactions on Fuzzy Systems , vol.8 , Issue.3 , pp. 297-312
    • Johansen, T.A.1    Shorten, R.2    Murray-Smith, R.3
  • 20
    • 0033896453 scopus 로고    scopus 로고
    • Linear programming and model predictive control
    • Rao C V, Rawlings J B. Linear programming and model predictive control[J]. Journal of Process Control, 2000, 10: 283-289.
    • (2000) Journal of Process Control , vol.10 , pp. 283-289
    • Rao, C.V.1    Rawlings, J.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.