-
1
-
-
16444363187
-
Simulation as a Tool for Re-engineering Construction Processes
-
PhD thesis, University of Colorado at Boulder
-
Abdulhadi, N. (1997) Simulation as a Tool for Re-engineering Construction Processes, PhD thesis, University of Colorado at Boulder.
-
(1997)
-
-
Abdulhadi, N.1
-
3
-
-
0010039649
-
Analysis of client-satisfaction factors in construction industry
-
Ahmed, S. and Kangari, R. (1995) Analysis of client-satisfaction factors in construction industry. Journal of Management in Engineering, 11(2), 36-44.
-
(1995)
Journal of Management in Engineering
, vol.11
, Issue.2
, pp. 36-44
-
-
Ahmed, S.1
Kangari, R.2
-
4
-
-
16444378155
-
The services quality of post in Saudi Arabia
-
Al-Shumaimeri, A.A. (2001) The services quality of post in Saudi Arabia. Public Administration Journal, 41(2), 265-302.
-
(2001)
Public Administration Journal
, vol.41
, Issue.2
, pp. 265-302
-
-
Al-Shumaimeri, A.A.1
-
6
-
-
16444385480
-
Business Process Re-engineering
-
unpublished master thesis, KFUPM, Dhahran
-
Al-yahya, A.A. (2001) Business Process Re-engineering, unpublished master thesis, KFUPM, Dhahran.
-
(2001)
-
-
Al-yahya, A.A.1
-
7
-
-
16444365291
-
-
Coe-Truman Technology, Inc. Retrieved 2002, available at: (accessed 2002)
-
Andrews, D. (1996) Choose the Right Recipe for Success, Coe-Truman Technology, Inc. Retrieved 2002, available at: http//www.reengineering. com/articles/jun96/nutsbolt.htm (accessed 2002).
-
(1996)
Choose the Right Recipe for Success
-
-
Andrews, D.1
-
8
-
-
13944258632
-
Quantiying benefits of electronic technology applied to bulk materials management: A report to the Construction Industry Action Group
-
Clemson University, Construction Industry Action Group, Houston, Texas
-
Back, W.E. and Bell, L.C. (1994) Quantiying benefits of electronic technology applied to bulk materials management: a report to the Construction Industry Action Group, Clemson University, Construction Industry Action Group, Houston, Texas.
-
(1994)
-
-
Back, W.E.1
Bell, L.C.2
-
9
-
-
16444378442
-
Re-engineering the business of construction
-
May/June
-
Bechdol, P. (1995) Re-engineering the business of construction. Construction Business Review, May/June, 40-2.
-
(1995)
Construction Business Review
, pp. 40-42
-
-
Bechdol, P.1
-
10
-
-
0013246537
-
Re-engineering construction: A new management research agenda
-
Betts, M. and Wood-Happer, T. (1994) Re-engineering construction: a new management research agenda. Construction Management and Economics, 12, 551-6.
-
(1994)
Construction Management and Economics
, vol.12
, pp. 551-556
-
-
Betts, M.1
Wood-Happer, T.2
-
11
-
-
16444378714
-
Assessment of individual, organizational and environmental variables in the implementation of business process redesign
-
Chan, W.Q. and Yung, K.L. (1999) Assessment of individual, organizational and environmental variables in the implementation of business process redesign. International Journal of Business Performance Management, 1(4), 388-402.
-
(1999)
International Journal of Business Performance Management
, vol.1
, Issue.4
, pp. 388-402
-
-
Chan, W.Q.1
Yung, K.L.2
-
12
-
-
16444361952
-
-
Change Management Success Factors and Obstacles available from: (accessed 2003)
-
Change Management Success Factors and Obstacles (2003) Best Practices in Change Management study, available from: http://www.prosci.com/ tutorial-cm-factors.htm (accessed 2003).
-
(2003)
Best Practices in Change Management Study
-
-
-
14
-
-
0002371543
-
-
Blackwell Business, Massachusetts
-
Cross, K.F., Feather, J.J. and Lynch, R.L. (1995) Corporate Renaissance: The Art of Re-engineering, Blackwell Business, Massachusetts.
-
(1995)
Corporate Renaissance: The Art of Re-engineering
-
-
Cross, K.F.1
Feather, J.J.2
Lynch, R.L.3
-
15
-
-
16444361952
-
-
Communications: What worked and what didn't? available at: (accessed 2003)
-
Communications: What worked and what didn't? (2003) Best Practices in Change Management study, available at: http://www.prosci.com/ tutorial-communication-messages.htm (accessed 2003).
-
(2003)
Best Practices in Change Management Study
-
-
-
18
-
-
0002273296
-
A practical guide for implementing reengineering
-
Farrell, J. (1994) A practical guide for implementing reengineering. Planning Review, 40-5.
-
(1994)
Planning Review
, pp. 40-45
-
-
Farrell, J.1
-
19
-
-
0029203834
-
Benchmarking in construction industry
-
Fisher, D., Miertschin, S. and Pollock, D. (1995) Benchmarking in construction industry. Journal of Management in Engineering, 11 1), 50-7.
-
(1995)
Journal of Management in Engineering
, vol.11
, Issue.1
, pp. 50-57
-
-
Fisher, D.1
Miertschin, S.2
Pollock, D.3
-
20
-
-
0003022068
-
A six step guide to process re-engineering
-
Furey, T.R. (1993) A six step guide to process re-engineering. Planning Review, 20-3.
-
(1993)
Planning Review
, pp. 20-23
-
-
Furey, T.R.1
-
21
-
-
0006315616
-
Business process change in the 21st century
-
Grover, V., Kettinger, W. and Teng, J. (2000) Business process change in the 21st century. Business & Economic Review Journal, 46(2), 14-8.
-
(2000)
Business & Economic Review Journal
, vol.46
, Issue.2
, pp. 14-18
-
-
Grover, V.1
Kettinger, W.2
Teng, J.3
-
22
-
-
0031195488
-
Business process re-engineering: A tutorial on the concept, evolution, method, technology and application
-
Grover, V. and Malhotra, M. (1997) Business process re-engineering: a tutorial on the concept, evolution, method, technology and application. Journal of Operations Management, 15(3), 193-213.
-
(1997)
Journal of Operations Management
, vol.15
, Issue.3
, pp. 193-213
-
-
Grover, V.1
Malhotra, M.2
-
31
-
-
0343698913
-
Business process re-engineering: Newest fad, or revolution in government?
-
Linden, R. (1993) Business process re-engineering: newest fad, or revolution in government? Public Management, 9-15.
-
(1993)
Public Management
, pp. 9-15
-
-
Linden, R.1
-
32
-
-
16444381124
-
Avoiding a fool's mission
-
available (accessed 2002)
-
Mayer, J.H. (1998) Avoiding a fool's mission, Software Magazine, available http//www.findarticles.com/cf_0/m0SMG/n3_v18/20404321/ print.jhtml (accessed 2002).
-
(1998)
Software Magazine
-
-
Mayer, J.H.1
-
33
-
-
84998014201
-
The implementation of reengineering in SMEs: A ground study
-
McAdam, R. (1999) The implementation of reengineering in SMEs: a ground study. International Small Business Journal, 18(4), 353-67.
-
(1999)
International Small Business Journal
, vol.18
, Issue.4
, pp. 353-367
-
-
McAdam, R.1
-
35
-
-
16444377067
-
General information about contractors' classification and instructions to fill the form
-
Ministry of Public Works and Housing: Contractors Classification Division (no date) Dar Al-Helal Press, Riyadh
-
Ministry of Public Works and Housing: Contractors Classification Division (no date) General information about contractors' classification and instructions to fill the form, Dar Al-Helal Press, Riyadh.
-
-
-
-
36
-
-
16444376494
-
Tutorials (T32): Applying simulation tools to the re-engineering of large and mid sized AEC firms, a tutorial presented at the AEC Systems
-
Georgia World Congress Center, June
-
Orr, J. (1995) Tutorials (T32): Applying simulation tools to the re-engineering of large and mid sized AEC firms, a tutorial presented at the AEC Systems, Georgia World Congress Center, June.
-
(1995)
-
-
Orr, J.1
-
37
-
-
16444381402
-
Reengineering anxiety
-
July
-
Panettieri, J. (1994) Reengineering anxiety. Information WSeek, July, 20.
-
(1994)
Information WSeek
, pp. 20
-
-
Panettieri, J.1
-
38
-
-
0012637945
-
The secret history of process re-engineering
-
Rigby, D. (1993) The secret history of process re-engineering. Planning Review, 24-8.
-
(1993)
Planning Review
, pp. 24-28
-
-
Rigby, D.1
-
39
-
-
0009720364
-
Process Reengineering: The key to achieving breakthrough success
-
ASQC Quality Press, Wisconsin
-
Roberts, L. (1994) Process Reengineering: the key to achieving breakthrough success, ASQC Quality Press, Wisconsin.
-
(1994)
-
-
Roberts, L.1
-
41
-
-
0012070016
-
Situational reengineering: Case study analysis
-
Songer, A.D., Diekmann, J., Hendrickson, W. and Flushing, D. (2000) Situational reengineering: case study analysis. Journal of Construction Engineering And Management, 126(3), 185-90.
-
(2000)
Journal of Construction Engineering And Management
, vol.126
, Issue.3
, pp. 185-190
-
-
Songer, A.D.1
Diekmann, J.2
Hendrickson, W.3
Flushing, D.4
-
44
-
-
16444382369
-
Change requires re-engineering
-
20 June
-
Verespej, M. (1994) Change requires re-engineering. Industry Week, 20 June, 42.
-
(1994)
Industry Week
, pp. 42
-
-
Verespej, M.1
|