메뉴 건너뛰기




Volumn 35, Issue 1, 2004, Pages 49-53

Optimal scheduling of two-component products on a single facility

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; ASSEMBLY; GROUP TECHNOLOGY; MATHEMATICAL MODELS; OPTIMIZATION; PRODUCT DEVELOPMENT;

EID: 1642397400     PISSN: 00207721     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207720310001657072     Document Type: Article
Times cited : (4)

References (12)
  • 2
    • 0025489361 scopus 로고
    • Scheduling production of common component at a single facility
    • Aneja, Y. P., and Singh, N., 1990, Scheduling production of common component at a single facility. IIE Transactions, 22, 234-237.
    • (1990) IIE Transactions , vol.22 , pp. 234-237
    • Aneja, Y.P.1    Singh, N.2
  • 3
    • 0002844386 scopus 로고
    • Scheduling the production of component at a common facility
    • Baker, K. R., 1988, Scheduling the production of component at a common facility. IIE Transactions, 20, 32-35.
    • (1988) IIE Transactions , vol.20 , pp. 32-35
    • Baker, K.R.1
  • 4
    • 0024664606 scopus 로고
    • Optimal scheduling of products with two subassemblies on a single machine
    • Coffman, E. G., Nozari, A., and Yannakakis, M., 1989, Optimal scheduling of products with two subassemblies on a single machine. Operations Research, 37, 426-436.
    • (1989) Operations Research , vol.37 , pp. 426-436
    • Coffman, E.G.1    Nozari, A.2    Yannakakis, M.3
  • 5
    • 0025646885 scopus 로고
    • A pairwise interchange solution procedure for scheduling problem with production of components at a single facility
    • Ding, F. Y., 1990, A pairwise interchange solution procedure for scheduling problem with production of components at a single facility. Computers and Industrial Engineering, 18, 325-331.
    • (1990) Computers and Industrial Engineering , vol.18 , pp. 325-331
    • Ding, F.Y.1
  • 7
    • 0030128155 scopus 로고    scopus 로고
    • Optimal scheduling of products with common and unique components
    • Liao, C. J., 1996, Optimal scheduling of products with common and unique components. International Journal of Systems Science, 27, 361-366.
    • (1996) International Journal of Systems Science , vol.27 , pp. 361-366
    • Liao, C.J.1
  • 8
    • 0036027370 scopus 로고    scopus 로고
    • Fabrication scheduling on a single machine with due date constraints
    • Lin, B. M. T., 2002, Fabrication scheduling on a single machine with due date constraints. European Journal of Operational Research, 136, 95-105.
    • (2002) European Journal of Operational Research , vol.136 , pp. 95-105
    • Lin, B.M.T.1
  • 9
    • 85010608254 scopus 로고
    • Group scheduling jobs on a single machine: A multi-objective approarch with preemptive priority structure
    • Rana, S. P., and Singh, N., 1994, Group scheduling jobs on a single machine: A multi-objective approarch with preemptive priority structure. European Journal of Operational Research, 77, 1-13.
    • (1994) European Journal of Operational Research , vol.77 , pp. 1-13
    • Rana, S.P.1    Singh, N.2
  • 10
    • 0027641652 scopus 로고
    • Scheduling of products with common and product-dependent components manufactured at a single facility
    • Sung, C. S., and Park, C. K., 1993, Scheduling of products with common and product-dependent components manufactured at a single facility. Journal of Operational Research Society, 44, 773-784.
    • (1993) Journal of Operational Research Society , vol.44 , pp. 773-784
    • Sung, C.S.1    Park, C.K.2
  • 11
    • 0027569358 scopus 로고
    • Batching and sequencing of components at a single facility
    • Vickson, R. G., Magazine, M. J., and Santos, C. A., 1993, Batching and sequencing of components at a single facility. IIE Transactions, 25, 65-70.
    • (1993) IIE Transactions , vol.25 , pp. 65-70
    • Vickson, R.G.1    Magazine, M.J.2    Santos, C.A.3
  • 12
    • 0029338650 scopus 로고
    • Scheduling groups of jobs on a single machine
    • Webster, S., and Baker, K. R., 1995, Scheduling groups of jobs on a single machine. Operations Research, 43, 692-703.
    • (1995) Operations Research , vol.43 , pp. 692-703
    • Webster, S.1    Baker, K.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.