메뉴 건너뛰기




Volumn 3, Issue , 1998, Pages 134-137

On-line Algorithms for Hybrid Flow Shop Scheduling

Author keywords

Hybrid flow shop; Job scheduling; On line algorithms

Indexed keywords

HYBRID FLOW SHOPS; JOB SCHEDULING; ON-LINE ALGORITHMS;

EID: 1642315543     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (6)

References (6)
  • 2
    • 0014477093 scopus 로고
    • Bounds for multiprocessing timing anomalies
    • R. L. Graham, Bounds for multiprocessing timing anomalies, SIAM J. Appl. Math. 17, 416-429 (1969).
    • (1969) SIAM J. Appl. Math. , vol.17 , pp. 416-429
    • Graham, R.L.1
  • 4
    • 0026190509 scopus 로고
    • Schedules for a two-stage hybrid flowshop with parallel machines at the second stage
    • J. N. D. Gupta and E. A Tunc, Schedules for a two-stage hybrid flowshop with parallel machines at the second stage, International Journal of Production Research, 29, 1489-1502 (1991)
    • (1991) International Journal of Production Research , vol.29 , pp. 1489-1502
    • Gupta, J.N.D.1    Tunc, E.A.2
  • 5
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • S. M. Johnson, Optimal two- and three-stage production schedules with setup times included, Naval Research Logistic Quarterly, 1, 61-68 (1954).
    • (1954) Naval Research Logistic Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.