|
Volumn 3, Issue , 2004, Pages 1312-1318
|
A practical probabilistic reliability assessment using contingency simulation
|
Author keywords
Availability; Contingency; Probability; Reliability; Root Cause; Transmission Operation; Transmission Planning
|
Indexed keywords
CONTINGENCY;
ROOT CAUSE;
TRANSMISSION OPERATION;
TRANSMISSION PLANNING;
AVAILABILITY;
COMPUTER SIMULATION;
COMPUTER SOFTWARE;
ELECTRIC GENERATORS;
ELECTRIC LINES;
ELECTRIC LOAD MANAGEMENT;
ELECTRIC POWER TRANSMISSION;
ELECTRIC TRANSFORMERS;
INVESTMENTS;
LARGE SCALE SYSTEMS;
PROBABILITY;
RELIABILITY;
ELECTRIC POWER SYSTEM INTERCONNECTION;
|
EID: 15944407298
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (29)
|
References (8)
|