-
1
-
-
0001233812
-
Improved algorithms for economic lot-size problems
-
A. Aggarwal and J. Park," Improved algorithms for economic lot-size problems," Operations Research, vol. 41, no. 3, pp. 549-571, 1993.
-
(1993)
Operations Research
, vol.41
, Issue.3
, pp. 549-571
-
-
Aggarwal, A.1
Park, J.2
-
2
-
-
0037449224
-
The single-item lot-sizing problem with immediate lost sales
-
D. Aksen, K. Altinkemer, and S. Chand, "The single-item lot-sizing problem with immediate lost sales," European Journal" of Operational Research, vol. 147, pp. 558-566, 2003.
-
(2003)
European Journal of Operational Research
, vol.147
, pp. 558-566
-
-
Aksen, D.1
Altinkemer, K.2
Chand, S.3
-
3
-
-
0020194024
-
Computational complexity of the capacitated lot size problem
-
G. Bitran and H. Yanasse, "Computational complexity of the capacitated lot size problem," Management Science, vol. 28, no. 10, pp. 1174-1186, 1982.
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1174-1186
-
-
Bitran, G.1
Yanasse, H.2
-
4
-
-
0019032810
-
Deterministic production planning: Algorithms and complexity
-
M. Florian, J. Lenstra, and A. Rinnooy Kan, "Deterministic production planning: Algorithms and complexity," Management Science, vol. 26, no. 7, pp. 669-679, 1980.
-
(1980)
Management Science
, vol.26
, Issue.7
, pp. 669-679
-
-
Florian, M.1
Lenstra, J.2
Kan, A.R.3
-
5
-
-
0025432875
-
A forward algorithm for the capacitated lot size model with stockouts
-
R. Sandbothe and G. Thompson, "A forward algorithm for the capacitated lot size model with stockouts," Operation Research, vol. 38, no. 3, pp. 474-486, 1990.
-
(1990)
Operation Research
, vol.38
, Issue.3
, pp. 474-486
-
-
Sandbothe, R.1
Thompson, G.2
-
6
-
-
0027605942
-
Decision horizons for the capacitated lot size model with inventory bounds and stockouts
-
R. Sandbothe and G. Thompson, "Decision horizons for the capacitated lot size model with inventory bounds and stockouts," Computer and Operations Research, vol. 20, no. 5, pp. 455-465, 1993.
-
(1993)
Computer and Operations Research
, vol.20
, Issue.5
, pp. 455-465
-
-
Sandbothe, R.1
Thompson, G.2
-
7
-
-
0016509152
-
A deterministic multi-period production planning model with piecewise concave production and holding-backorder costs
-
C. Swoveland, "A deterministic multi-period production planning model with piecewise concave production and holding-backorder costs," Management Science, vol. 21, no. 9, pp. 1007-1013, 1975.
-
(1975)
Management Science
, vol.21
, Issue.9
, pp. 1007-1013
-
-
Swoveland, C.1
-
8
-
-
0000495984
-
Economic lot-sizing: An O(n log n) algorithm that runs in linear time in the wagner-whitin case
-
A. Wagelmans, S. Van Hoesel, and A. Kolen, "Economic lot-sizing: An O(n log n) algorithm that runs in linear time in the Wagner-Whitin case," Operations Research, vol. 40. pp. 145-156, 1992.
-
(1992)
Operations Research
, vol.40
, pp. 145-156
-
-
Wagelmans, A.1
Van Hoesel, S.2
Kolen, A.3
-
9
-
-
0001962762
-
Dynamic version of the economic lot-size model
-
H. Wagner and T. Whitin, "Dynamic version of the economic lot-size model," Management Science, vol. 5, no. 1, pp. 89-96, 1958.
-
(1958)
Management Science
, vol.5
, Issue.1
, pp. 89-96
-
-
Wagner, H.1
Whitin, T.2
-
10
-
-
0002967761
-
A deterministic multi-period production scheduling model with back-logging
-
W. Zangwill, "A deterministic multi-period production scheduling model with back-logging," Management Science, vol 13, pp. 105-119, 1966.
-
(1966)
Management Science
, vol.13
, pp. 105-119
-
-
Zangwill, W.1
|