Volumn 23, Issue 2, 2005, Pages 199-213

Applying cluster identification algorithm and simulation to generate probabilistic network schedules for design projects

Author keywords

Cluster identification algorithm; Design schedule; Information dependency; Simulation, and project management

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; CONTRACTS; DATA PROCESSING; INDUSTRIAL MANAGEMENT; PROBABILITY; SCHEDULING;

EID: 15744374061     PISSN: 01446193     EISSN: None     Source Type: Journal    
DOI: 10.1080/0144619042000301393     Document Type: Review
Times cited : (7)

References (29)
  • 2
    • 0003727195 scopus 로고
    • Project management: Techniques in planning and controlling construction projects
    • John Wiley & Sons, New York
    • Ahuja, H.N., Dozzi, S.P. and Abourizk, S.M. (1994) Project management: techniques in planning and controlling construction projects John Wiley & Sons, New York.
    • (1994)
    • Ahuja, H.N.1    Dozzi, S.P.2    Abourizk, S.M.3
  • 3
    • 33744885201 scopus 로고
    • Manipulating the flow of design information to improve the programming of building design
    • Austin, S., Baldwin, A. and Newton, A. (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12, 445-55.
    • (1994) Construction Management and Economics , vol.12 , pp. 445-455
    • Austin, S.1    Baldwin, A.2    Newton, A.3
  • 4
    • 0003126540 scopus 로고    scopus 로고
    • Analytical design planning technique: A model of the detailed building design process
    • Austin, S., Baldwin, A., Li, B. and Waskett, P. (1999) Analytical design planning technique: a model of the detailed building design process. Design Studies, 20, 279-96.
    • (1999) Design Studies , vol.20 , pp. 279-296
    • Austin, S.1    Baldwin, A.2    Li, B.3    Waskett, P.4
  • 5
    • 22844440688 scopus 로고    scopus 로고
    • Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process
    • Austin, S., Baldwin, A., Li, B. and Waskett, P. (2000) Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process. Construction Management and Economics, 18, 173-82.
    • (2000) Construction Management and Economics , vol.18 , pp. 173-182
    • Austin, S.1    Baldwin, A.2    Li, B.3    Waskett, P.4
  • 7
    • 0018478270 scopus 로고
    • Simulation of construction project duration
    • Carr, R.I. (1979) Simulation of construction project duration. Journal of Construction Division, 105(2), 117-28.
    • (1979) Journal of Construction Division , vol.105 , Issue.2 , pp. 117-128
    • Carr, R.I.1
  • 8
    • 0035279228 scopus 로고    scopus 로고
    • Defining cost/schedule performance indices and their ranges for design projects
    • Chang, S.T. (2001) Defining cost/schedule performance indices and their ranges for design projects. Journal of Management in Engineering, 17(2), 122-30.
    • (2001) Journal of Management in Engineering , vol.17 , Issue.2 , pp. 122-130
    • Chang, S.T.1
  • 9
    • 0036162657 scopus 로고    scopus 로고
    • Reasons for cost and schedule increase for engineering design projects
    • Chang, S.T. (2002) Reasons for cost and schedule increase for engineering design projects. Journal of Management in Engineering, 18(1), 29-36.
    • (2002) Journal of Management in Engineering , vol.18 , Issue.1 , pp. 29-36
    • Chang, S.T.1
  • 13
    • 15744364886 scopus 로고    scopus 로고
    • Identifying a design management package to support concurrent design in building wafer fabs
    • Submitted to
    • Dzeng, R.J. (2003) Identifying a design management package to support concurrent design in building wafer fabs. Submitted to the Journal of Construction Engineering and Management.
    • (2003) The Journal of Construction Engineering and Management
    • Dzeng, R.J.1
  • 16
    • 0031655312 scopus 로고    scopus 로고
    • Modelling design process in industry -empirical investigations of design work in practice
    • Frankenberger, E. and Badke-Schaub, P. (1998) Modelling design process in industry -empirical investigations of design work in practice. Automation in Construction, 7, 139-55.
    • (1998) Automation in Construction , vol.7 , pp. 139-155
    • Frankenberger, E.1    Badke-Schaub, P.2
  • 19
    • 0031654682 scopus 로고    scopus 로고
    • Design guidelines for design-build projects
    • Fredrickson, K. (1998) Design guidelines for design-build projects. Journal of Management in Engineering, 14(1), 77-80.
    • (1998) Journal of Management in Engineering , vol.14 , Issue.1 , pp. 77-80
    • Fredrickson, K.1
  • 22
    • 0033102403 scopus 로고    scopus 로고
    • Scheduling of design projects with uncertain number of iterations
    • Luh, P.B., Liu, F. and Moser, B. (1999) Scheduling of design projects with uncertain number of iterations. European Journal of Operational Research, 113, 575-92.
    • (1999) European Journal of Operational Research , vol.113 , pp. 575-592
    • Luh, P.B.1    Liu, F.2    Moser, B.3
  • 25
    • 0345846263 scopus 로고    scopus 로고
    • Collaborative planning and scheduling of interrelated design changes
    • Mokhtar, A., Bedard, C. and Fazio, P. (2000) Collaborative planning and scheduling of interrelated design changes. Journal of Architectural Engineering, 6(2), 66-75.
    • (2000) Journal of Architectural Engineering , vol.6 , Issue.2 , pp. 66-75
    • Mokhtar, A.1    Bedard, C.2    Fazio, P.3
  • 27
    • 0002388703 scopus 로고
    • Exploring communication in collaborative design: Cooperative architectural modelling
    • Peng, C. (1994) Exploring communication in collaborative design: cooperative architectural modelling. Design Studies, 15, 19-44.
    • (1994) Design Studies , vol.15 , pp. 19-44
    • Peng, C.1