메뉴 건너뛰기




Volumn 10, Issue 3, 1999, Pages 401-411

The quality management role of the owner in different types of construction contract for process plant

Author keywords

[No Author keywords available]

Indexed keywords


EID: 1542420213     PISSN: 09544127     EISSN: None     Source Type: Journal    
DOI: 10.1080/0954412997910     Document Type: Article
Times cited : (6)

References (34)
  • 5
    • 85034558468 scopus 로고    scopus 로고
    • Quality assurance in construction and installation
    • J.H. ROGERSON (Ed.) Chapter 4 (London, Graham & Trotman)
    • BENTLEY, K.P. (1998) Quality assurance in construction and installation. In: J.H. ROGERSON (Ed.) Quality Assurance in Oil and Gas Industry, Vol. 3, Chapter 4 (London, Graham & Trotman).
    • (1998) Quality Assurance in Oil and Gas Industry , vol.3
    • Bentley, K.P.1
  • 8
    • 0026370807 scopus 로고
    • TU Electric Generation Division Fossil Construction Quality Management Programme project: Management institution
    • Dallas, USA, 28 September-2 October
    • CLARK, C.C. (1991) TU Electric Generation Division Fossil Construction Quality Management Programme project: management institution, Project Management Institute Seminar/Symposium, Dallas, USA, 28 September-2 October, pp. 239-244.
    • (1991) Project Management Institute Seminar/Symposium , pp. 239-244
    • Clark, C.C.1
  • 12
    • 85034555173 scopus 로고
    • Elmer L. Munger (Ed.) (New Jersey, Prentice-Hall)
    • DOUGLAS, C.J. (1969) Construction Management. Elmer L. Munger (Ed.) (New Jersey, Prentice-Hall).
    • (1969) Construction Management
    • Douglas, C.J.1
  • 16
    • 1542457853 scopus 로고
    • MSc Thesis, School of Industrial and Manufacturing Science, Cranfield Institute of Technology
    • HU, C.C. (1992) Quality costs model for engineering projects, MSc Thesis, School of Industrial and Manufacturing Science, Cranfield Institute of Technology.
    • (1992) Quality Costs Model for Engineering Projects
    • Hu, C.C.1
  • 21
    • 0028530453 scopus 로고
    • Managing capital projects: Where have we been - Where are we going?
    • MERROR, E. & YAROSSI, M.E. (1994) Managing capital projects: Where have we been - Where are we going? Chemical Engineering, 101, pp. 108-111.
    • (1994) Chemical Engineering , vol.101 , pp. 108-111
    • Merror, E.1    Yarossi, M.E.2
  • 22
    • 0029347253 scopus 로고
    • Design and Build - Lessons from the UK channel tunnel terminal, Proceedings of the Institution of Civil Engineers
    • NAPHTINE, R. & SMART, R. (1995) Design and Build - lessons from the UK channel tunnel terminal, Proceedings of the Institution of Civil Engineers, Civil Engineering, 108, pp. 123-130.
    • (1995) Civil Engineering , vol.108 , pp. 123-130
    • Naphtine, R.1    Smart, R.2
  • 23
    • 85034552012 scopus 로고
    • Resultados obtidos pelo programa de augtiroia tecnica das fases de construcao e montagem e de condicionacamento da petrovbras
    • São Paulo, Brasil, 10-12 November
    • ORFHAO LOBO, A.C., TELLES VIANNA, C.H. & MAGALHAE, F.B. (1987) Resultados obtidos pelo programa de augtiroia tecnica das fases de construcao e montagem e de condicionacamento da petrovbras, Annai do 3° Seminario sobre Garantia da Qualidade, São Paulo, Brasil, 10-12 November, pp. 383-401.
    • (1987) Annai do 3° Seminario Sobre Garantia da Qualidade , pp. 383-401
    • Orfhao Lobo, A.C.1    Telles Vianna, C.H.2    Magalhae, F.B.3
  • 26
    • 0026366496 scopus 로고
    • Quality management and the empowered project manager - Setting the requirements for success
    • Dallas, 2 September-2 October
    • POHANY, B.P. (1991) Quality management and the empowered project manager - setting the requirements for success, Project Management Institute Seminar/Symposium, Dallas, 2 September-2 October, pp. 376-387.
    • (1991) Project Management Institute Seminar/Symposium , pp. 376-387
    • Pohany, B.P.1
  • 28
    • 0006702564 scopus 로고
    • Perceptions on partnering in the public sector
    • SANDERS, S.R. & MOORE, M.M. (1992) Perceptions on partnering in the public sector, Project Management Journal, 22, pp. 13-19.
    • (1992) Project Management Journal , vol.22 , pp. 13-19
    • Sanders, S.R.1    Moore, M.M.2
  • 30
    • 85001574689 scopus 로고    scopus 로고
    • Bucking the trend: Cost-plus services in lump sum turnkey market
    • SMITH, H.F. (1997) Bucking the trend: cost-plus services in lump sum turnkey market, Journal of Management in Engineering, 13, pp. 38-43.
    • (1997) Journal of Management in Engineering , vol.13 , pp. 38-43
    • Smith, H.F.1
  • 31
    • 1542457832 scopus 로고
    • New York, United Nations, Economic Commission for Europe
    • UNITED NATIONS (1973) Guide on Drawing up Contracts for Large Industrial Work (New York, United Nations, Economic Commission for Europe), pp. 15-18.
    • (1973) Guide on Drawing Up Contracts for Large Industrial Work , pp. 15-18
  • 32
    • 38249005798 scopus 로고
    • Keeping large projects under control: The importance of contract type selection
    • VELD, J. IN'T & PEETERS, W.A. (1989) Keeping large projects under control: the importance of contract type selection, International Journal of Project Management, 7, pp. 155-162.
    • (1989) International Journal of Project Management , vol.7 , pp. 155-162
    • In't Veld, J.I.1    Peeters, W.A.2