|
Volumn , Issue , 2004, Pages 171-175
|
Analysis of seepage through dam foundation with closed system of grouting curtain, drainage and pumping measures
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ABUTMENTS (BRIDGE);
DAMS;
DRAINAGE;
FOUNDATIONS;
NUMERICAL METHODS;
PROJECT MANAGEMENT;
RESERVOIRS (WATER);
RIVERS;
ROCKS;
SOILS;
WATER;
ANTI-SEEPAGE CONCRETE PLATES;
BARRAGING STRUCTURES;
PIMPING WELLS;
PUMPING SYSTEMS;
SEEPAGE;
|
EID: 15344347864
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (6)
|
References (10)
|