메뉴 건너뛰기




Volumn 54, Issue 2, 2005, Pages 198-213

Efficient reclaiming in reservation-based real-time systems with variable execution times

Author keywords

Overload control; Overrun management; Resource reclaiming; Variable execution times

Indexed keywords

ALGORITHMS; BANDWIDTH; COMPUTATIONAL COMPLEXITY; COMPUTER SIMULATION; THEOREM PROVING;

EID: 14844365663     PISSN: 00189340     EISSN: None     Source Type: Journal    
DOI: 10.1109/TC.2005.25     Document Type: Article
Times cited : (52)

References (21)
  • 1
    • 0032293318 scopus 로고    scopus 로고
    • "Integrating Multimedia Applications in Hard Real-Time Systems"
    • Dec
    • L. Abeni and G. Buttazzo, "Integrating Multimedia Applications in Hard Real-Time Systems," Proc. IEEE Real-Time Systems Symp., Dec. 1998.
    • (1998) Proc. IEEE Real-Time Systems Symp.
    • Abeni, L.1    Buttazzo, G.2
  • 2
    • 3543087309 scopus 로고    scopus 로고
    • "Resource Reservations in Dynamic Real-Time Systems"
    • L. Abeni and G. Buttazzo, "Resource Reservations in Dynamic Real-Time Systems," Real-Time Systems, vol. 27, no. 2, pp. 123-165, 2004.
    • (2004) Real-Time Systems , vol.27 , Issue.2 , pp. 123-165
    • Abeni, L.1    Buttazzo, G.2
  • 3
    • 0026118563 scopus 로고
    • "Stack-Based Scheduling of Real-Time Processes"
    • T.P. Baker, "Stack-Based Scheduling of Real-Time Processes," J. Real-Time Systems, vol. 3, no. 1, pp. 67-100, 1991.
    • (1991) J. Real-Time Systems , vol.3 , Issue.1 , pp. 67-100
    • Baker, T.P.1
  • 4
    • 0036155399 scopus 로고    scopus 로고
    • "Multiple Servers and Capacity Sharing for Implementing Flexible Scheduling"
    • Jan.-Mar
    • G. Bernat and A. Burns, "Multiple Servers and Capacity Sharing for Implementing Flexible Scheduling," Real-Time Systems, vol. 22, nos. 1-2, pp. 49-75, Jan.-Mar. 2002.
    • (2002) Real-Time Systems , vol.22 , Issue.1-2 , pp. 49-75
    • Bernat, G.1    Burns, A.2
  • 13
    • 84974687699 scopus 로고
    • "Scheduling Algorithms for Multi-programming in a Hard Real-Time Environment"
    • C.L. Liu and J.W. Layland, "Scheduling Algorithms for Multi-programming in a Hard Real-Time Environment," J. ACM, vol. 20, no. 1, pp. 40-61, 1973.
    • (1973) J. ACM , vol.20 , Issue.1 , pp. 40-61
    • Liu, C.L.1    Layland, J.W.2
  • 18
    • 0022045231 scopus 로고
    • "A Unified Method for Evaluating Real-Time Computer Controllers and Its Application"
    • Apr
    • K.G. Shin, C.M. Krishna, and Y.-H. Lee, "A Unified Method for Evaluating Real-Time Computer Controllers and Its Application," IEEE Trans. Automatic Control, pp. 357-365, Apr. 1985.
    • (1985) IEEE Trans. Automatic Control , pp. 357-365
    • Shin, K.G.1    Krishna, C.M.2    Lee, Y.-H.3
  • 19
    • 0024684902 scopus 로고
    • "Aperiodic Scheduling for Hard Real-Time System"
    • B. Sprunt, L. Sha, and J.P. Lehoczky, "Aperiodic Scheduling for Hard Real-Time System," J. Real-Time Systems, vol. 1, pp. 27-60, 1989.
    • (1989) J. Real-Time Systems , vol.1 , pp. 27-60
    • Sprunt, B.1    Sha, L.2    Lehoczky, J.P.3
  • 20
    • 0030380269 scopus 로고    scopus 로고
    • "Bounding Completion Times of Jobs with Arbitrary Release Times and Variable Execution Times"
    • Dec
    • J. Sun and J.W.S. Liu, "Bounding Completion Times of Jobs with Arbitrary Release Times and Variable Execution Times," Proc. IEEE Real-Time System Symp., Dec. 1996.
    • (1996) Proc. IEEE Real-Time System Symp.
    • Sun, J.1    Liu, J.W.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.