|
Volumn 1, Issue 2-3, 2005, Pages 287-292
|
Some lessons learnt from the use of PRA during the design phase
|
Author keywords
Design optimisation; PBMR; PRA; Risk criteria
|
Indexed keywords
NUCLEAR ENGINEERING;
NUCLEAR REACTOR LICENSING;
OPTIMIZATION;
PERTURBATION TECHNIQUES;
PROBABILISTIC LOGICS;
RISK ASSESSMENT;
STRUCTURAL DESIGN;
DESIGN PHASES;
PEBBLE BED MODULE REACTORS (PBMR);
PROBABILISTIC RISK ASSESSMENT (PRA);
RISK CRITERIA;
NUCLEAR REACTORS;
|
EID: 14844333556
PISSN: 14753219
EISSN: None
Source Type: Journal
DOI: 10.1504/IJCIS.2005.006125 Document Type: Article |
Times cited : (7)
|
References (3)
|