메뉴 건너뛰기




Volumn 18, Issue 4, 2002, Pages 179-185

Renovation projects: Design process problems and improvement mechanisms

Author keywords

Buildings, office; Constraints; Design; Project management; Renovation

Indexed keywords

CONSTRAINTS; DESIGN PROCESSES; OFFICE; RENOVATION;

EID: 14744290555     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0742-597X(2002)18:4(179)     Document Type: Article
Times cited : (32)

References (6)
  • 1
    • 33644583983 scopus 로고    scopus 로고
    • Positive versus negative iteration in design
    • Brighton, U.K.
    • Ballard, G. (2000). "Positive versus negative iteration in design." Proc., 8th Annual Conf. Int. Group for Lean Construction, Brighton, U.K., 〈http://www.sussex.ac.uk/spru/imichair/news/template.cfm? content =iglc-8.cfm〉.
    • (2000) Proc., 8th Annual Conf. Int. Group for Lean Construction
    • Ballard, G.1
  • 2
    • 0029746285 scopus 로고    scopus 로고
    • Lessons learned from multiphase reconstruction project
    • Krizek, R. J., Lo, W., and Hadavi, A. (1996). "Lessons learned from multiphase reconstruction project." J. Constr. Eng. Manage., 122(1), 44-54.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.1 , pp. 44-54
    • Krizek, R.J.1    Lo, W.2    Hadavi, A.3
  • 5
    • 84860094011 scopus 로고    scopus 로고
    • Commercial and institutional building construction 1997
    • Jan. 4, 2000
    • U.S. Census Bureau. (2000). "Commercial and institutional building construction 1997." Economic Census 1997, 〈http://www.census.gov/prod/ ec97/97c2333b.pdf〉 (Jan. 4, 2000).
    • (2000) Economic Census 1997


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.