-
2
-
-
14644445472
-
"How to manage the spatial variability of natural soils"
-
NATO, Cachan, France
-
Bolle, A. (1994). "How to manage the spatial variability of natural soils." NATO ASI Series E, Vol. 269, NATO, Cachan, France.
-
(1994)
NATO ASI Series E
, vol.269
-
-
Bolle, A.1
-
4
-
-
0031103116
-
"Uncertainty analysis by point estimate methods incorporating marginal distribution"
-
Chang, C. H., Yang, J. C., and Tung, Y. K. (1997). "Uncertainty analysis by point estimate methods incorporating marginal distribution." J. Hydraul. Eng., 123(3), 244-250.
-
(1997)
J. Hydraul. Eng.
, vol.123
, Issue.3
, pp. 244-250
-
-
Chang, C.H.1
Yang, J.C.2
Tung, Y.K.3
-
5
-
-
0029244876
-
"Evaluation of probability point estimate methods"
-
Chang, C. H., Tung, Y. K., and Yang, J. C. (1995). "Evaluation of probability point estimate methods." Appl. Math. Model., 19(2), 95-105.
-
(1995)
Appl. Math. Model.
, vol.19
, Issue.2
, pp. 95-105
-
-
Chang, C.H.1
Tung, Y.K.2
Yang, J.C.3
-
6
-
-
0027848091
-
"Stochastic risk modeling of dam overtopping"
-
B. C. Yen and Y. K. Tung, eds., ASCE, Reston, Va
-
Cheng, S. T., Yen, B. C., and Tang, W. H. (1993). "Stochastic risk modeling of dam overtopping." Reliability and uncertainty analysis in hydraulic design, B. C. Yen and Y. K. Tung, eds., ASCE, Reston, Va, 123-132.
-
(1993)
Reliability and Uncertainty Analysis in Hydraulic Design
, pp. 123-132
-
-
Cheng, S.T.1
Yen, B.C.2
Tang, W.H.3
-
7
-
-
0033200102
-
"Point-estimate method as numerical quadrature"
-
Christian, J. T., and Baecher, G. B. (1999). "Point-estimate method as numerical quadrature." J. Geotech. Geoenviron. Eng., 125(9), 779-786.
-
(1999)
J. Geotech. Geoenviron. Eng.
, vol.125
, Issue.9
, pp. 779-786
-
-
Christian, J.T.1
Baecher, G.B.2
-
8
-
-
0242504859
-
"The effect of shape and density on the free settling of particles at high Reynolds numbers"
-
Christiansen, E. B., and Barker, D. H. (1965). "The effect of shape and density on the free settling of particles at high Reynolds numbers." AIChE J., 11(1), 145-150.
-
(1965)
AIChE J.
, vol.11
, Issue.1
, pp. 145-150
-
-
Christiansen, E.B.1
Barker, D.H.2
-
9
-
-
14644395206
-
"Reliability assessment based on point estimates of probability moments"
-
Zurich, Switzerland
-
Grivas, A. D., and Stiefel, U. C. (1983). "Reliability assessment based on point estimates of probability moments." Proc., Int. Conf. on Mathematical Modeling, Zurich, Switzerland.
-
(1983)
Proc., Int. Conf. on Mathematical Modeling
-
-
Grivas, A.D.1
Stiefel, U.C.2
-
10
-
-
0034947946
-
"Stochastic water quality analysis using reliability method"
-
Han, K.-Y., Kim, S.-H., and Bae, D.-H. (2001). "Stochastic water quality analysis using reliability method." J. Am. Water Resources Assoc., 37(3), 695-708.
-
(2001)
J. Am. Water Resources Assoc.
, vol.37
, Issue.3
, pp. 695-708
-
-
Han, K.-Y.1
Kim, S.-H.2
Bae, D.-H.3
-
11
-
-
0024656259
-
"Probability estimate for multivariate analysis"
-
Harr, M. E. (1989). "Probability estimate for multivariate analysis." Appl. Math. Model., 13(5), 313-318.
-
(1989)
Appl. Math. Model.
, vol.13
, Issue.5
, pp. 313-318
-
-
Harr, M.E.1
-
12
-
-
0026899172
-
"Point estimate method for calculating statistical moments"
-
Li, K. S. (1992). "Point estimate method for calculating statistical moments." J. Eng. Mech., 118(7), 1506-1511.
-
(1992)
J. Eng. Mech.
, vol.118
, Issue.7
, pp. 1506-1511
-
-
Li, K.S.1
-
13
-
-
0037330229
-
"Comparison of risk calculation methods for a culvert"
-
Lian, Y., and Yen, C. B. (2003). "Comparison of risk calculation methods for a culvert." J. Hydraul. Eng., 129(2), 140-152.
-
(2003)
J. Hydraul. Eng.
, vol.129
, Issue.2
, pp. 140-152
-
-
Lian, Y.1
Yen, C.B.2
-
14
-
-
0026924845
-
"Improved first-order uncertainty method for water-quality modeling"
-
Melching, C. S., and Anmangandla, S. (1992). "Improved first-order uncertainty method for water-quality modeling." J. Environ. Eng., 118(5), 791-805.
-
(1992)
J. Environ. Eng.
, vol.118
, Issue.5
, pp. 791-805
-
-
Melching, C.S.1
Anmangandla, S.2
-
15
-
-
0035504386
-
"Uncertainty in coupled nonpoint source and stream water-quality models"
-
Melching, C. S., and Bauwens, W. (2001). "Uncertainty in coupled nonpoint source and stream water-quality models." J. Water Resour. Plan. Manage., 127(6), 403-413.
-
(2001)
J. Water Resour. Plan. Manage.
, vol.127
, Issue.6
, pp. 403-413
-
-
Melching, C.S.1
Bauwens, W.2
-
16
-
-
0030089388
-
"Key sources of uncertainty in QUAL2E model of Passaic River"
-
Melching, C. S., and Yoon, C. G. (1996). "Key sources of uncertainty in QUAL2E model of Passaic River." J. Water Resour. Plan. Manage., 122(2), 105-113.
-
(1996)
J. Water Resour. Plan. Manage.
, vol.122
, Issue.2
, pp. 105-113
-
-
Melching, C.S.1
Yoon, C.G.2
-
17
-
-
0016772780
-
"Point estimates for probability moments"
-
Rosenblueth, E. (1975). "Point estimates for probability moments." Proc. Natl. Acad. Sci. U.S.A., 72(10), 3812-3814.
-
(1975)
Proc. Natl. Acad. Sci. U.S.A.
, vol.72
, Issue.10
, pp. 3812-3814
-
-
Rosenblueth, E.1
-
18
-
-
0019622642
-
"Point estimates for probability"
-
Rosenblueth, E. (1981). "Point estimates for probability." Appl. Math. Model., 5, 329-335.
-
(1981)
Appl. Math. Model.
, vol.5
, pp. 329-335
-
-
Rosenblueth, E.1
-
19
-
-
0033117536
-
"Uncertainty analysis of reservoir sedimentation"
-
Salas, J. D., and Shin, H.-S. (1999). "Uncertainty analysis of reservoir sedimentation." J. Hydraul. Eng., 125(4), 339-350.
-
(1999)
J. Hydraul. Eng.
, vol.125
, Issue.4
, pp. 339-350
-
-
Salas, J.D.1
Shin, H.-S.2
-
22
-
-
0035473355
-
"Reliability, risk, and uncertainty analysis using generic expectation functions"
-
Tyagi, A., and Haan, C. T. (2001a). "Reliability, risk, and uncertainty analysis using generic expectation functions." J. Environ. Eng., 127(10), 938-945.
-
(2001)
J. Environ. Eng.
, vol.127
, Issue.10
, pp. 938-945
-
-
Tyagi, A.1
Haan, C.T.2
-
23
-
-
0035015969
-
"Uncertainty analysis using corrected first-order approximation method"
-
Tyagi, A., and Haan, C. T. (2001b). "Uncertainty analysis using corrected first-order approximation method." Water Resour. Res., 37(6), 1847-1858.
-
(2001)
Water Resour. Res.
, vol.37
, Issue.6
, pp. 1847-1858
-
-
Tyagi, A.1
Haan, C.T.2
-
24
-
-
0027795330
-
"Some recent progress in uncertainty analysis for hydraulic design"
-
B. C. Yen and Y. K. Tung, eds., ASCE, Reston, Va
-
Tung, Y. K., and Yen, B. C. (1993). "Some recent progress in uncertainty analysis for hydraulic design." Reliability and uncertainty analysis in hydraulic design, B. C. Yen and Y. K. Tung, eds., ASCE, Reston, Va, 17-34.
-
(1993)
Reliability and Uncertainty Analysis in Hydraulic Design
, pp. 17-34
-
-
Tung, Y.K.1
Yen, B.C.2
-
25
-
-
0035794641
-
"Comparison of uncertainty analysis methods for a distributed rainfall-runoff model"
-
Yu, P. S., Yang, T. C., and Chen, S. J. (2001). "Comparison of uncertainty analysis methods for a distributed rainfall-runoff model." J. Hydrol., 244, 43-59.
-
(2001)
J. Hydrol.
, vol.244
, pp. 43-59
-
-
Yu, P.S.1
Yang, T.C.2
Chen, S.J.3
|