-
2
-
-
33646209702
-
"Exact and approximate methods for the daily management of a remote sensing satellite"
-
Proc. 5th Workshop Artif. Intell. Knowledge-Based Syst. Space. ESTEC, Noordwijk, The Netherlands, Oct., 10-12
-
J. C. Agǹese, N. Bataille, D. Blumstein, E. Bensana, and G. Verfaillie, "Exact and approximate methods for the daily management of a remote sensing satellite," in Proc. 5th Workshop Artif. Intell. Knowledge-Based Syst. Space. ESTEC, Noordwijk, The Netherlands, Oct., 10-12 1995.
-
(1995)
-
-
Agǹese, J.C.1
Bataille, N.2
Blumstein, D.3
Bensana, E.4
Verfaillie, G.5
-
3
-
-
0028516246
-
"Maximizing the value of a space mission"
-
N. G. Hall and M. J. Magazine, "Maximizing the value of a space mission," Eur. J. Oper. Res., vol. 78, pp. 224-241, 1994.
-
(1994)
Eur. J. Oper. Res.
, vol.78
, pp. 224-241
-
-
Hall, N.G.1
Magazine, M.J.2
-
4
-
-
0025384041
-
"Scheduling job with simple precedence constraints on parallel machines"
-
D. J. Hoitomt, P. B. Luh, E. Max, and K. R. Pattipati, "Scheduling job with simple precedence constraints on parallel machines," Contral Syst. Mag., vol. 10, no. 2, pp. 34-40, 1990.
-
(1990)
Contral Syst. Mag.
, vol.10
, Issue.2
, pp. 34-40
-
-
Hoitomt, D.J.1
Luh, P.B.2
Max, E.3
Pattipati, K.R.4
-
5
-
-
0016025814
-
"Validation and subgradient optimization"
-
M. Held, P. Wolfe, and H. Crowder, "Validation and subgradient optimization," Math. Program., vol. 6, pp. 62-88, 1974.
-
(1974)
Math. Program.
, vol.6
, pp. 62-88
-
-
Held, M.1
Wolfe, P.2
Crowder, H.3
-
6
-
-
0028462998
-
"Impact of sequence dependent setup time on job shop scheduling performance"
-
S. C. Kim and P. M. Bobrowski, "Impact of sequence dependent setup time on job shop scheduling performance," Int. J. Prod. Res., vol. 32, no. 7, pp. 1503-1520, 1994.
-
(1994)
Int. J. Prod. Res.
, vol.32
, Issue.7
, pp. 1503-1520
-
-
Kim, S.C.1
Bobrowski, P.M.2
-
7
-
-
0034248849
-
"Scheduling flexible flow shops with sequence dependent setup effects"
-
Apr
-
C. Y. Liu and S. C. Chang, "Scheduling flexible flow shops with sequence dependent setup effects," IEEE Trans. Robot. Autom., vol. 16, no. 4, pp. 408-419, Apr. 2000.
-
(2000)
IEEE Trans. Robot. Autom.
, vol.16
, Issue.4
, pp. 408-419
-
-
Liu, C.Y.1
Chang, S.C.2
-
8
-
-
0027625736
-
"Scheduling of manufacturing systems using the Lagrangian relaxation technique"
-
Jul
-
P. B. Luh and D. J. Hoitomt, "Scheduling of manufacturing systems using the Lagrangian relaxation technique," IEEE Trans. Autom. Control, vol. 38, no. 7, pp. 1066-1079, Jul. 1993.
-
(1993)
IEEE Trans. Autom. Control
, vol.38
, Issue.7
, pp. 1066-1079
-
-
Luh, P.B.1
Hoitomt, D.J.2
-
9
-
-
0039490362
-
"Selecting and scheduling observations of agile satellites"
-
M. Lemaitre, G. Verfaillie, F. Jouhaud, J.-M. Lachiver, and N. Bataille, "Selecting and scheduling observations of agile satellites," Aerospace Sci. Technol., vol. 6, pp. 367-381, 2002.
-
(2002)
Aerospace Sci. Technol.
, vol.6
, pp. 367-381
-
-
Lemaitre, M.1
Verfaillie, G.2
Jouhaud, F.3
Lachiver, J.-M.4
Bataille, N.5
-
10
-
-
0028452709
-
"Rolling horizon algorithms for a single machine dynamic scheduling problem with sequence dependent setup times"
-
I. M. Ovacik and R. Uzsoy, "Rolling horizon algorithms for a single machine dynamic scheduling problem with sequence dependent setup times," Int. J. Prod. Res. vol. 32, no. 6, pp. 1243-1263, 1994.
-
(1994)
Int. J. Prod. Res.
, vol.32
, Issue.6
, pp. 1243-1263
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
12
-
-
0003438602
-
-
2nd Edition, Englewood Cliffs, NJ: Prentice-Hall
-
M. Pinedo, Scheduling Theory, Algorithms, and Systems - 2nd Edition Englewood Cliffs, NJ: Prentice-Hall, 2002.
-
(2002)
Scheduling Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
14
-
-
0035501794
-
"A logic-constrained knapsack formulation and a Tabu algorithm for the daily photograph scheduling of an earth observation satellite"
-
M. Vasquez and J.-K. Hao, "A logic-constrained knapsack formulation and a Tabu algorithm for the daily photograph scheduling of an earth observation satellite," Computat. Optim. Applicat., vol. 20, no. 2, pp. 137-157, 2001.
-
(2001)
Computat. Optim. Applicat.
, vol.20
, Issue.2
, pp. 137-157
-
-
Vasquez, M.1
Hao, J.-K.2
-
15
-
-
0033885012
-
"Three scheduling algorithms applied to the earth observing systems domain"
-
W. J. Wolfe and S. E. Sorensen, "Three scheduling algorithms applied to the earth observing systems domain," Manage. Sci. INFORMS, vol. 46, no. 1, pp. 148-168, 2000.
-
(2000)
Manage. Sci. INFORMS
, vol.46
, Issue.1
, pp. 148-168
-
-
Wolfe, W.J.1
Sorensen, S.E.2
-
16
-
-
33646209600
-
-
National Space Programs Office. [Online]. Available
-
National Space Programs Office. [Online]. Available: http://www.nspo.gov.tw/
-
-
-
-
17
-
-
33646209308
-
-
LANDSAT 7. [Online]. Available
-
LANDSAT 7. [Online]. Available: http://landsat.gsfc.nasa.gov/
-
-
-
-
18
-
-
33646206840
-
-
Spot Image Spot 5. [Online]. Available
-
Spot Image Spot 5. [Online]. Available: http://www.spotimage.fr/home/ system/future/spot5/welcome.htm
-
-
-
|