-
1
-
-
14544268908
-
Review of selected electrical system disturbances in North America
-
Princeton, New Jersey, March
-
"Review of Selected Electrical System Disturbances in North America," North America Electric Reliability Council, Princeton, New Jersey, March 2001.
-
(2001)
North America Electric Reliability Council
-
-
-
2
-
-
14544283257
-
The Washington heights network shutdown - July 6, 1999
-
New York, NY, December 10
-
"The Washington Heights Network Shutdown - July 6, 1999," Report by the Corporate Review Committee, Consolidated Edison Company of New York. New York, NY, December 10, 1999.
-
(1999)
Report by the Corporate Review Committee, Consolidated Edison Company of New York
-
-
-
3
-
-
14544284942
-
Severe accident risks for VVER reactors: Vol. 3: Procedure guides
-
Brookhaven National Laboratory, September
-
"Severe Accident Risks for VVER Reactors: Vol. 3: Procedure Guides," NUREG/CR-6572, BNL-NUREG-52534, Brookhaven National Laboratory, September 1999.
-
(1999)
NUREG/CR-6572, BNL-NUREG-52534
-
-
-
5
-
-
14544299508
-
Electrical substation reliability evaluation with emphasis on evolving interdependence on communication infrastructure
-
Brookhaven National Laboratory, February
-
M.A. Azarm, R.A. Bari, and Z. Musicki, "Electrical Substation Reliability Evaluation with Emphasis on Evolving Interdependence On Communication Infrastructure," BNL Technical report (Non-Proprietary Version), Brookhaven National Laboratory, February 2004.
-
(2004)
BNL Technical Report (Non-proprietary Version)
-
-
Azarm, M.A.1
Bari, R.A.2
Musicki, Z.3
-
6
-
-
14544292832
-
Power system analysis software, algorithm, modeling, and user's guide
-
Energy Science and Technology Department, Brookhaven National Laboratory, February
-
M. Yue, M A. Azarm, and R. A. Bari, "Power System Analysis Software, Algorithm, Modeling, and User's Guide," BNL Technical Report, Energy Science and Technology Department, Brookhaven National Laboratory, February 2004.
-
(2004)
BNL Technical Report
-
-
Yue, M.1
Azarm, M.A.2
Bari, R.A.3
-
7
-
-
84860097625
-
A summary of the final results and conclusions of the second international enquiry on the reliability of high voltage circuit breakers
-
on behalf of CIGRE Working Group 13.06, 29-31 March 1995, Conference Publication No. 406, ©IEEE
-
P.L. Fletcher and W. Degen on behalf of CIGRE Working Group 13.06, "A Summary of the Final Results and Conclusions of the Second International Enquiry on the Reliability of High Voltage Circuit Breakers", Proceedings of the Reliability of Transmission Equipment conference, 29-31 March 1995, Conference Publication No. 406, ©IEEE, 1995.
-
(1995)
Proceedings of the Reliability of Transmission Equipment Conference
-
-
Fletcher, P.L.1
Degen, W.2
-
8
-
-
0029215962
-
Transmission equipment reliability using the canadian electrical association information system
-
29-31 March 1995, Conference Publication No. 406, ©IEEE
-
R. Billinton, R. Ghajar, F. Filippelli, and R. Del Bianco, "Transmission Equipment Reliability Using the Canadian Electrical Association Information System", Proceedings of the Reliability of Transmission Equipment Conference, 29-31 March 1995, Conference Publication No. 406, ©IEEE, 1995
-
(1995)
Proceedings of the Reliability of Transmission Equipment Conference
-
-
Billinton, R.1
Ghajar, R.2
Filippelli, F.3
Del Bianco, R.4
-
9
-
-
14544288565
-
Network reliability best practices, packet switching and circuit switching
-
Network Reliability and Interoperability Council V, Subcommittees 2.A, Focus Group 2, January
-
NRIC, Network Reliability and Interoperability Council V, Subcommittees 2.A, Focus Group 2, "Network Reliability Best Practices, Packet Switching and Circuit Switching", Final Report, January 2002
-
(2002)
Final Report
-
-
|