메뉴 건너뛰기




Volumn , Issue , 2004, Pages 50-55

An analytical method for determining effect of transmission system forced outages on the reliability of interconnected power system

Author keywords

Forced outage; Interconnected Power System; LOLP; Power reserve; Reliability; Transmission system

Indexed keywords

COMPUTER SOFTWARE; CUSTOMER SATISFACTION; DC POWER TRANSMISSION; EHV POWER TRANSMISSION; ELECTRIC LOADS; ELECTRIC POWER SYSTEM INTERCONNECTION; ELECTRIC POWER TRANSMISSION; MATHEMATICAL MODELS; OUTAGES; PROBABILITY; RELIABILITY; RISK ASSESSMENT; UHV POWER TRANSMISSION;

EID: 14544277444     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (3)

References (9)
  • 3
    • 0038397911 scopus 로고    scopus 로고
    • 3000-4500 MW from Inga Falls (Zaire) to South Africa with HVDC: A prefeasibility study
    • Johannesburg
    • A. Clerici, "3000-4500 MW from Inga Falls (Zaire) to South Africa with HVDC: a prefeasibility study", CIGRE Int'l Colloquium on HVDC and FACTS, Johannesburg, 1997.
    • (1997) CIGRE Int'l Colloquium on HVDC and FACTS
    • Clerici, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.