-
1
-
-
0032141956
-
Design of a TLM application program based on an AM/FM/GIS system
-
Aug.
-
T. H. Chen and J. T. Cherng, "Design of a TLM application program based on an AM/FM/GIS system," IEEE Trans. Power Syst., vol. 13, pp. 904-909, Aug. 1998.
-
(1998)
IEEE Trans. Power Syst.
, vol.13
, pp. 904-909
-
-
Chen, T.H.1
Cherng, J.T.2
-
2
-
-
0030142828
-
Realizing load reduction functions by aperiodic switching of load groups
-
May
-
N. Navid-Azarbaijani and M. H. Banakar, "Realizing load reduction functions by aperiodic switching of load groups," IEEE Trans. Power Syst., vol. 11, pp. 721-727, May 1996.
-
(1996)
IEEE Trans. Power Syst.
, vol.11
, pp. 721-727
-
-
Navid-Azarbaijani, N.1
Banakar, M.H.2
-
3
-
-
0025422338
-
Interruptible load control for Taiwan power company
-
Nov.
-
C. S. Chen and J. T. Leu, "Interruptible load control for Taiwan power company," IEEE Trans. Power Syst., vol. 5, pp. 460-465, Nov. 1990.
-
(1990)
IEEE Trans. Power Syst.
, vol.5
, pp. 460-465
-
-
Chen, C.S.1
Leu, J.T.2
-
4
-
-
0030142890
-
Interruptible load management using optimal power flow analysis
-
May
-
S. Majumdar, D. Chattopadhyay, and J. Parikh, "Interruptible load management using optimal power flow analysis," IEEE Trans. Power Syst., vol. 11, pp. 715-720, May 1996.
-
(1996)
IEEE Trans. Power Syst.
, vol.11
, pp. 715-720
-
-
Majumdar, S.1
Chattopadhyay, D.2
Parikh, J.3
-
5
-
-
0031996525
-
Industrial power demand response analysis for a one-part real-time pricing
-
Feb.
-
J. G. Roos and I. E. Lane, "Industrial power demand response analysis for a one-part real-time pricing," IEEE Trans. Power Syst., vol. 13, pp. 159-164, Feb. 1998.
-
(1998)
IEEE Trans. Power Syst.
, vol.13
, pp. 159-164
-
-
Roos, J.G.1
Lane, I.E.2
-
6
-
-
0026821867
-
Optimization of energy procurement and load management
-
Feb.
-
L. Effler, G. Schellstede, and H. Wagner, "Optimization of energy procurement and load management," IEEE Trans. Power Syst., vol. 7, pp. 327-333, Feb. 1992.
-
(1992)
IEEE Trans. Power Syst.
, vol.7
, pp. 327-333
-
-
Effler, L.1
Schellstede, G.2
Wagner, H.3
-
7
-
-
0029305154
-
Integrating demand side options in electric utility planning: A multiobjective approach
-
May
-
D. Chattopadhyay, R. Banerjee, and J. Parikh, "Integrating demand side options in electric utility planning: A multiobjective approach," IEEE Trans. Power Syst., vol. 10, pp. 657-663, May 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, pp. 657-663
-
-
Chattopadhyay, D.1
Banerjee, R.2
Parikh, J.3
-
8
-
-
0031996906
-
Establishing a rule base for a hybrid ES/XPS approach to load management
-
Feb.
-
A. J. Gaul, E. Handschin, W. Hoffmann, and C. Lehmköster, "Establishing a rule base for a hybrid ES/XPS approach to load management," IEEE Trans. Power Syst., vol. 13, pp. 86-92, Feb. 1998.
-
(1998)
IEEE Trans. Power Syst.
, vol.13
, pp. 86-92
-
-
Gaul, A.J.1
Handschin, E.2
Hoffmann, W.3
Lehmköster, C.4
-
9
-
-
0029252524
-
Air conditioner direct load control by multi-pass dynamic programming
-
Feb.
-
D. C. Wei and N. Chen, "Air conditioner direct load control by multi-pass dynamic programming," IEEE Trans. Power Syst., vol. 10, pp. 307-313, Feb. 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, pp. 307-313
-
-
Wei, D.C.1
Chen, N.2
-
10
-
-
0032071803
-
Direct load control-a profit-based load management using linear programming
-
May
-
K. H. Ng and G. B. Sheblé, "Direct load control-a profit-based load management using linear programming," IEEE Trans. Power Syst., vol. 13, pp. 688-695, May 1998.
-
(1998)
IEEE Trans. Power Syst.
, vol.13
, pp. 688-695
-
-
Ng, K.H.1
Sheblé, G.B.2
-
11
-
-
84885975490
-
Fuzzy logic-based direct load control of residential electric water heaters and air conditioners recognizing customer preferences in a deregulated environment
-
Edmonton, AB, Canada, July, Paper no. 0-7803-5569-5
-
H. Salehfar, P. J. Noll, B. J. LaMeres, M. H. Nehrir, and V. Gerez, "Fuzzy logic-based direct load control of residential electric water heaters and air conditioners recognizing customer preferences in a deregulated environment," in Proc. IEEE/Power Eng. Soc. Summer Meeting, Edmonton, AB, Canada, July 1999, Paper no. 0-7803-5569-5, pp. 1055-1060.
-
(1999)
Proc. IEEE/Power Eng. Soc. Summer Meeting
, pp. 1055-1060
-
-
Salehfar, H.1
Noll, P.J.2
Lameres, B.J.3
Nehrir, M.H.4
Gerez, V.5
-
12
-
-
0032674145
-
Direct load control using fuzzy dynamic programming
-
May
-
H. T. Yang and K. Y. Huang, "Direct load control using fuzzy dynamic programming," Proc. Inst. Elect. Eng., Gen. Transm. Dist., vol. 146, no. 3, pp. 294-300, May 1999.
-
(1999)
Proc. Inst. Elect. Eng., Gen. Transm. Dist.
, vol.146
, Issue.3
, pp. 294-300
-
-
Yang, H.T.1
Huang, K.Y.2
-
13
-
-
0027695196
-
Scheduling of direct load control to minimize load reduction for a utility suffering from generation shortage
-
Nov.
-
W. C. Chu, B. K. Chen, and C. K. Fu, "Scheduling of direct load control to minimize load reduction for a utility suffering from generation shortage," IEEE Trans. Power Syst., vol. 8, pp. 1525-1530, Nov. 1993.
-
(1993)
IEEE Trans. Power Syst.
, vol.8
, pp. 1525-1530
-
-
Chu, W.C.1
Chen, B.K.2
Fu, C.K.3
-
15
-
-
0026202578
-
Fuzzy dynamic programming, an application to unit commitment
-
Aug.
-
C. C. Su and Y. Y. Hsu, "Fuzzy dynamic programming, an application to unit commitment," IEEE Trans. Power Syst., vol. 6, pp. 1231-1237, Aug. 1991.
-
(1991)
IEEE Trans. Power Syst.
, vol.6
, pp. 1231-1237
-
-
Su, C.C.1
Hsu, Y.Y.2
-
17
-
-
0026207054
-
A heuristic short-term unit commitment
-
Aug.
-
S. K. Tong, S. M. Shahidehpour, and Z. Ouyang, "A heuristic short-term unit commitment," IEEE Trans. Power Syst., vol. 6, pp. 1210-1216, Aug. 1991.
-
(1991)
IEEE Trans. Power Syst.
, vol.6
, pp. 1210-1216
-
-
Tong, S.K.1
Shahidehpour, S.M.2
Ouyang, Z.3
|