-
1
-
-
14244255323
-
Verankerungseinrichtung mit seismischem Sensor
-
European Patent Appl. 99120626.9-2316; Japanese Patent Appl. HEI 11-322268
-
Borm, G., Giese, R., Schmidt-Hattenberger, C. & Bribach, J. 1999. Verankerungseinrichtung mit seismischem Sensor. (Anchoring system with seismic sensor.) German Patent Appl. 198 52 455.2; European Patent Appl. 99120626.9-2316; Japanese Patent Appl. HEI 11-322268.
-
(1999)
German Patent Appl. 198 52 455.2
-
-
Borm, G.1
Giese, R.2
Schmidt-Hattenberger, C.3
Bribach, J.4
-
2
-
-
0035790598
-
Integrated seismic imaging system for geological prediction ahead in underground construction
-
Rapid Excavation and Tunneling Conference (RETC), June 11-13, San Diego, USA
-
Borm, G., Giese, R., Otto, P., Dickmann, Th. & Amberg, F. 2001. Integrated seismic imaging system for geological prediction ahead in underground construction. Rapid Excavation and Tunneling Conference (RETC), June 11-13, San Diego, USA.
-
(2001)
-
-
Borm, G.1
Giese, R.2
Otto, P.3
Dickmann, Th.4
Amberg, F.5
-
3
-
-
0030470911
-
Drivage concurrent tunnel seismic prediction (TSP)
-
Dickmann, T. & Sander, B. K. 1996. Drivage concurrent tunnel seismic prediction (TSP). Felsbau, 14 (6), 406-411.
-
(1996)
Felsbau
, vol.14
, Issue.6
, pp. 406-411
-
-
Dickmann, T.1
Sander, B.K.2
-
4
-
-
0031843087
-
Acoustic emission and ultrasonic-velocity methods used to characterize the excavation disturbance associated with deep tunnels in hard rock
-
Falls, S. D. & Young, R. P. 1998. Acoustic emission and ultrasonic-velocity methods used to characterize the excavation disturbance associated with deep tunnels in hard rock. Tectonophysics 289, 1-15.
-
(1998)
Tectonophysics
, vol.289
, pp. 1-15
-
-
Falls, S.D.1
Young, R.P.2
-
5
-
-
0033911479
-
Automated seismic prediction ahead of the tunnel boring machine
-
Kneib, G., Kassel, A. & Lorenz, K. 2000. Automated seismic prediction ahead of the tunnel boring machine. First Break, 295-302.
-
(2000)
First Break
, pp. 295-302
-
-
Kneib, G.1
Kassel, A.2
Lorenz, K.3
-
7
-
-
0013233553
-
Tomography to evaluate site conditions during tunneling
-
3rd National Conference of the GeoInstitute of ASCE Geo-Engineering for Underground Facilities University of Illinois-Urbana, 13-17 June
-
Neil, D. M., Haramy, K. Y., Hanson, D. H. & Descour, J. M. 1999. Tomography to evaluate site conditions during tunneling. Proceedings of Geo-Institute, 99. 3rd National Conference of the GeoInstitute of ASCE Geo-Engineering for Underground Facilities, University of Illinois-Urbana, 13-17 June.
-
(1999)
Proceedings of Geo-Institute, 99
-
-
Neil, D.M.1
Haramy, K.Y.2
Hanson, D.H.3
Descour, J.M.4
-
8
-
-
14244254413
-
Schlussbericht Sondierstollen Piora-Mulde, Phase 1, Geologie/Geotechnik /Hydrologie/Geothermie
-
Reg. No. 144, (Final Report on the Priora Mould Testing Gallery, Phase 1, Geology/Geotechnique/Hydrology/Geothermics)
-
Schneider, T. R. 1997. Schlussbericht Sondierstollen Piora-Mulde, Phase 1, Geologie/Geotechnik/Hydrologie/Geothermie. (Final Report on the Priora Mould Testing Gallery, Phase 1, Geology/Geotechnique/Hydrology/ Geothermics), Reg. No. 144, 1-30.
-
(1997)
, pp. 1-30
-
-
Schneider, T.R.1
-
9
-
-
0022825394
-
Characteristics of fault and shear zones in deep mines
-
Wallace, R. E. & Morris, H. T. 1986. Characteristics of fault and shear zones in deep mines. Pure and Applied Geophysics, 124, 107-125.
-
(1986)
Pure and Applied Geophysics
, vol.124
, pp. 107-125
-
-
Wallace, R.E.1
Morris, H.T.2
-
10
-
-
0026442686
-
Seismic traveltime inversion for 2-D crustal velocity structure
-
Zelt, C. A. & Smith, R. B. 1992. Seismic traveltime inversion for 2-D crustal velocity structure. Geophysical Journal International, 108, 16-34.
-
(1992)
Geophysical Journal International
, vol.108
, pp. 16-34
-
-
Zelt, C.A.1
Smith, R.B.2
|