Planning and scheduling highway construction

Author keywords

Computer aided scheduling; Construction planning; Highway construction; Resource allocation

Indexed keywords

COMPUTER OPERATING SYSTEMS; COMPUTER SOFTWARE; CONSTRUCTION INDUSTRY; DATABASE SYSTEMS; MATHEMATICAL MODELS; OBJECT ORIENTED PROGRAMMING; PLANNING; RESOURCE ALLOCATION; SCHEDULING;

EID: 13944282624     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:5(638)     Document Type: Article
Times cited : (35)

References (23)
  • 1
    • 0347010776 scopus 로고
    • Development of an integrated system for planning earthwork operation in road construction
    • Alkass, S., and Harris, F. (1991). "Development of an integrated system for planning earthwork operation in road construction." Constr. Manage. Econom., 9, 263-289.
    • (1991) Constr. Manage. Econom. , vol.9 , pp. 263-289
    • Alkass, S.1    Harris, F.2
  • 2
    • 0003893750 scopus 로고    scopus 로고
    • 28th Ed., Caterpillar, Inc., Peoria, Ill.
    • Caterpillar performance handbook. (1997). 28th Ed., Caterpillar, Inc., Peoria, Ill.
    • (1997) Caterpillar Performance Handbook
  • 3
    • 0035454715 scopus 로고    scopus 로고
    • Developing a draft schedule using templates and rules
    • Chevallier, N., and Russell, A. D. (2000). "Developing a draft schedule using templates and rules." J. Constr. Eng. Manage., 127(5), 391-398.
    • (2000) J. Constr. Eng. Manage. , vol.127 , Issue.5 , pp. 391-398
    • Chevallier, N.1    Russell, A.D.2
  • 4
    • 0022917749 scopus 로고
    • Application of linear scheduling
    • Chrzanowski, E., and Johnston, D. (1986). "Application of linear scheduling." J. Constr. Eng. fage., 112(4), 476-491.
    • (1986) J. Constr. Eng. Fage. , vol.112 , Issue.4 , pp. 476-491
    • Chrzanowski, E.1    Johnston, D.2
  • 5
    • 12444344998 scopus 로고    scopus 로고
    • Resource-driven scheduling of repetitive activities
    • El-Rayes, K., and Moselhi, O. (1998). "Resource-driven scheduling of repetitive activities." Constr. Manage. Econom., 16 433-446.
    • (1998) Constr. Manage. Econom. , vol.16 , pp. 433-446
    • El-Rayes, K.1    Moselhi, O.2
  • 6
    • 0035279776 scopus 로고    scopus 로고
    • Impact of rainfall on the productivity of highway construction
    • El-Rayes, K., and Moselhi, O. (2001). "Impact of rainfall on the productivity of highway construction." J. Constr. Eng. Manage., 127(2), 125-131.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.2 , pp. 125-131
    • El-Rayes, K.1    Moselhi, O.2
  • 8
    • 0017539377 scopus 로고
    • Road construction-simulation game for site mangers
    • Harris, F. C., and Evans, J. B. (1977). "Road construction- Simulation game for site mangers." J. Constr. Div., Am. Soc. Civ. Eng., 103(3), 405-414.
    • (1977) J. Constr. Div., Am. Soc. Civ. Eng. , vol.103 , Issue.3 , pp. 405-414
    • Harris, F.C.1    Evans, J.B.2
  • 10
    • 0023569757 scopus 로고
    • Evaluation of scheduling techniques for highway construction projects
    • Transportation Research Board, D.C.
    • Herbsman, Z. J. (1987). "Evaluation of scheduling techniques for highway construction projects." Transportation Research Record 1126, Transportation Research Board, D.C., 110-120.
    • (1987) Transportation Research Record , vol.1126 , pp. 110-120
    • Herbsman, Z.J.1
  • 11
    • 11644308477 scopus 로고    scopus 로고
    • Lane rental: Innovative way to reduce road construction time
    • Herbsman, Z. J., and Glagola, C. R. (1998). "Lane rental: Innovative way to reduce road construction time." J. Constr. Eng. Manage., 124(5), 411-417.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.5 , pp. 411-417
    • Herbsman, Z.J.1    Glagola, C.R.2
  • 12
    • 0019583188 scopus 로고
    • Linear scheduling method for highway construction
    • Johnston, D. (1981). "Linear scheduling method for highway construction." J. Constr. Div., Am. Soc. Civ. Eng., 107(2), 247-261.
    • (1981) J. Constr. Div., Am. Soc. Civ. Eng. , vol.107 , Issue.2 , pp. 247-261
    • Johnston, D.1
  • 13
    • 13944273902 scopus 로고    scopus 로고
    • Lavalin (2002). SNC-Lavalin Website, 〈http://www.407etr./com/ map_4.pdf〉.
    • (2002) SNC-Lavalin Website
  • 14
    • 13944281504 scopus 로고
    • Principles of project scheduling and monitoring
    • Transportation Research Board, Washington, D.C.
    • National Cooperative Highway Research Program (NCHRP). (1970). "Principles of project scheduling and monitoring." Synthesis of Highway Practice 6, Transportation Research Board, Washington, D.C.
    • (1970) Synthesis of Highway Practice , vol.6
  • 15
    • 0017907075 scopus 로고
    • Effect of weather on highway construction
    • Transportation Research Board, Washington, D.C.
    • National Cooperative Highway Research Program (NCHRP. (1978). "Effect of weather on highway construction." Synthesis of Highway Practice 47, Transportation Research Board, Washington, D.C.
    • (1978) Synthesis of Highway Practice , vol.47
  • 16
    • 13944283941 scopus 로고
    • Determination of contract time for highway construction project
    • Transportation Research Board, Washington, D.C.
    • National Cooperative Highway Research Program (NCHRP. (1995). "Determination of contract time for highway construction project." Synthesis of Highway Practice 215, Transportation Research Board, Washington, D.C.
    • (1995) Synthesis of Highway Practice , vol.215
  • 17
    • 13944274288 scopus 로고    scopus 로고
    • Stabilization of existing subgrades to improve constructibility during interstate pavement reconstruction
    • Transportation Research Board, Washington, D.C.
    • National Cooperative Highway Research Program (NCHRP. (1997). "Stabilization of existing subgrades to improve constructibility during interstate pavement reconstruction." Synthesis of Highway Practice 247, Transportation Research Board, Washington, D.C.
    • (1997) Synthesis of Highway Practice , vol.247
  • 21
    • 0028495816 scopus 로고
    • CPM/LOB: New methodology to integrate CPM and line of balance
    • Suhail, S. A., and Neale, R. H. (1994). "CPM/LOB: new methodology to integrate CPM and line of balance." J. Constr. Eng. Manage., 120(3), 667-684.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.3 , pp. 667-684
    • Suhail, S.A.1    Neale, R.H.2
  • 22
    • 0002872941 scopus 로고
    • Linear scheduling and visualization
    • Transportation Research Board, Washington, D.C.
    • Vorster, M. C., Beliveau, Y. J., and Bafna, T. (1992). "Linear scheduling and visualization." Transportation Research Record 1351, Transportation Research Board, Washington, D.C., 32-39.
    • (1992) Transportation Research Record , vol.1351 , pp. 32-39
    • Vorster, M.C.1    Beliveau, Y.J.2    Bafna, T.3
  • 23
    • 0025625710 scopus 로고
    • Consequential equipment costs associated with lack of availability and downtime
    • Vorster, M., and De La Garza, J. (1990). "Consequential equipment costs associated with lack of availability and downtime." J. Constr. Eng. Manage., 116(4), 656-669.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.4 , pp. 656-669
    • Vorster, M.1    De La Garza, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.