-
1
-
-
0347010776
-
Development of an integrated system for planning earthwork operation in road construction
-
Alkass, S., and Harris, F. (1991). "Development of an integrated system for planning earthwork operation in road construction." Constr. Manage. Econom., 9, 263-289.
-
(1991)
Constr. Manage. Econom.
, vol.9
, pp. 263-289
-
-
Alkass, S.1
Harris, F.2
-
2
-
-
0003893750
-
-
28th Ed., Caterpillar, Inc., Peoria, Ill.
-
Caterpillar performance handbook. (1997). 28th Ed., Caterpillar, Inc., Peoria, Ill.
-
(1997)
Caterpillar Performance Handbook
-
-
-
3
-
-
0035454715
-
Developing a draft schedule using templates and rules
-
Chevallier, N., and Russell, A. D. (2000). "Developing a draft schedule using templates and rules." J. Constr. Eng. Manage., 127(5), 391-398.
-
(2000)
J. Constr. Eng. Manage.
, vol.127
, Issue.5
, pp. 391-398
-
-
Chevallier, N.1
Russell, A.D.2
-
4
-
-
0022917749
-
Application of linear scheduling
-
Chrzanowski, E., and Johnston, D. (1986). "Application of linear scheduling." J. Constr. Eng. fage., 112(4), 476-491.
-
(1986)
J. Constr. Eng. Fage.
, vol.112
, Issue.4
, pp. 476-491
-
-
Chrzanowski, E.1
Johnston, D.2
-
5
-
-
12444344998
-
Resource-driven scheduling of repetitive activities
-
El-Rayes, K., and Moselhi, O. (1998). "Resource-driven scheduling of repetitive activities." Constr. Manage. Econom., 16 433-446.
-
(1998)
Constr. Manage. Econom.
, vol.16
, pp. 433-446
-
-
El-Rayes, K.1
Moselhi, O.2
-
6
-
-
0035279776
-
Impact of rainfall on the productivity of highway construction
-
El-Rayes, K., and Moselhi, O. (2001). "Impact of rainfall on the productivity of highway construction." J. Constr. Eng. Manage., 127(2), 125-131.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.2
, pp. 125-131
-
-
El-Rayes, K.1
Moselhi, O.2
-
8
-
-
0017539377
-
Road construction-simulation game for site mangers
-
Harris, F. C., and Evans, J. B. (1977). "Road construction- Simulation game for site mangers." J. Constr. Div., Am. Soc. Civ. Eng., 103(3), 405-414.
-
(1977)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.103
, Issue.3
, pp. 405-414
-
-
Harris, F.C.1
Evans, J.B.2
-
9
-
-
13944272022
-
-
PhD thesis, Dept. of Building, Civil, and Environmental Engineering, Concordia Univ., Montreal
-
Hassanein, A. (2002). "Planning and scheduling highway construction using GIS and dynamic programming." PhD thesis, Dept. of Building, Civil, and Environmental Engineering, Concordia Univ., Montreal.
-
(2002)
Planning and Scheduling Highway Construction Using GIS and Dynamic Programming
-
-
Hassanein, A.1
-
10
-
-
0023569757
-
Evaluation of scheduling techniques for highway construction projects
-
Transportation Research Board, D.C.
-
Herbsman, Z. J. (1987). "Evaluation of scheduling techniques for highway construction projects." Transportation Research Record 1126, Transportation Research Board, D.C., 110-120.
-
(1987)
Transportation Research Record
, vol.1126
, pp. 110-120
-
-
Herbsman, Z.J.1
-
11
-
-
11644308477
-
Lane rental: Innovative way to reduce road construction time
-
Herbsman, Z. J., and Glagola, C. R. (1998). "Lane rental: Innovative way to reduce road construction time." J. Constr. Eng. Manage., 124(5), 411-417.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.5
, pp. 411-417
-
-
Herbsman, Z.J.1
Glagola, C.R.2
-
12
-
-
0019583188
-
Linear scheduling method for highway construction
-
Johnston, D. (1981). "Linear scheduling method for highway construction." J. Constr. Div., Am. Soc. Civ. Eng., 107(2), 247-261.
-
(1981)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.107
, Issue.2
, pp. 247-261
-
-
Johnston, D.1
-
13
-
-
13944273902
-
-
Lavalin (2002). SNC-Lavalin Website, 〈http://www.407etr./com/ map_4.pdf〉.
-
(2002)
SNC-Lavalin Website
-
-
-
14
-
-
13944281504
-
Principles of project scheduling and monitoring
-
Transportation Research Board, Washington, D.C.
-
National Cooperative Highway Research Program (NCHRP). (1970). "Principles of project scheduling and monitoring." Synthesis of Highway Practice 6, Transportation Research Board, Washington, D.C.
-
(1970)
Synthesis of Highway Practice
, vol.6
-
-
-
15
-
-
0017907075
-
Effect of weather on highway construction
-
Transportation Research Board, Washington, D.C.
-
National Cooperative Highway Research Program (NCHRP. (1978). "Effect of weather on highway construction." Synthesis of Highway Practice 47, Transportation Research Board, Washington, D.C.
-
(1978)
Synthesis of Highway Practice
, vol.47
-
-
-
16
-
-
13944283941
-
Determination of contract time for highway construction project
-
Transportation Research Board, Washington, D.C.
-
National Cooperative Highway Research Program (NCHRP. (1995). "Determination of contract time for highway construction project." Synthesis of Highway Practice 215, Transportation Research Board, Washington, D.C.
-
(1995)
Synthesis of Highway Practice
, vol.215
-
-
-
17
-
-
13944274288
-
Stabilization of existing subgrades to improve constructibility during interstate pavement reconstruction
-
Transportation Research Board, Washington, D.C.
-
National Cooperative Highway Research Program (NCHRP. (1997). "Stabilization of existing subgrades to improve constructibility during interstate pavement reconstruction." Synthesis of Highway Practice 247, Transportation Research Board, Washington, D.C.
-
(1997)
Synthesis of Highway Practice
, vol.247
-
-
-
18
-
-
0004139859
-
-
Wiley, New York
-
Oglesby, C. H., and Hicks, R. G. (1982). Highway engineering, 4th Ed, Wiley, New York.
-
(1982)
Highway Engineering, 4th Ed
-
-
Oglesby, C.H.1
Hicks, R.G.2
-
19
-
-
0003511049
-
-
Prentice-Hall, Englewood Cliffs, N.J.
-
Rumbaugh, J., Blaha, M., Premerlani, W., Eddy, F., and Lorensen, W. (1991). Object-oriented modelling and design, Prentice-Hall, Englewood Cliffs, N.J.
-
(1991)
Object-oriented Modelling and Design
-
-
Rumbaugh, J.1
Blaha, M.2
Premerlani, W.3
Eddy, F.4
Lorensen, W.5
-
20
-
-
0027205813
-
Linear scheduling: A practical implementation
-
ASCE, New York
-
Russell, A. D., McGowan, N. (1993). "Linear scheduling: A practical implementation." Proc., Computing in Civil and Building Engineering, ASCE, New York, 279-286.
-
(1993)
Proc., Computing in Civil and Building Engineering
, pp. 279-286
-
-
Russell, A.D.1
McGowan, N.2
-
21
-
-
0028495816
-
CPM/LOB: New methodology to integrate CPM and line of balance
-
Suhail, S. A., and Neale, R. H. (1994). "CPM/LOB: new methodology to integrate CPM and line of balance." J. Constr. Eng. Manage., 120(3), 667-684.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.3
, pp. 667-684
-
-
Suhail, S.A.1
Neale, R.H.2
-
22
-
-
0002872941
-
Linear scheduling and visualization
-
Transportation Research Board, Washington, D.C.
-
Vorster, M. C., Beliveau, Y. J., and Bafna, T. (1992). "Linear scheduling and visualization." Transportation Research Record 1351, Transportation Research Board, Washington, D.C., 32-39.
-
(1992)
Transportation Research Record
, vol.1351
, pp. 32-39
-
-
Vorster, M.C.1
Beliveau, Y.J.2
Bafna, T.3
-
23
-
-
0025625710
-
Consequential equipment costs associated with lack of availability and downtime
-
Vorster, M., and De La Garza, J. (1990). "Consequential equipment costs associated with lack of availability and downtime." J. Constr. Eng. Manage., 116(4), 656-669.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.4
, pp. 656-669
-
-
Vorster, M.1
De La Garza, J.2
|