메뉴 건너뛰기




Volumn 128, Issue 5, 2002, Pages 400-408

Spatial integration in construction

Author keywords

Computer applications; Construction; Global positioning; Information; Surveys

Indexed keywords

BUILDING LAYOUTS; CONSTRUCTION SITE; ROBOTIC BRICKLAYERS;

EID: 13944272639     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2002)128:5(400)     Document Type: Review
Times cited : (21)

References (16)
  • 1
    • 13944277741 scopus 로고
    • Robot crane technology
    • National Institute of Standards and Technology, Gaithersburg, Md
    • Albus, J. S. (1989). "Robot crane technology." Final Rep., NIST Tech. Note 1267, National Institute of Standards and Technology, Gaithersburg, Md.
    • (1989) Final Rep., NIST Tech. Note , vol.1267
    • Albus, J.S.1
  • 3
    • 0025460096 scopus 로고
    • Process planning for automated stone cutting
    • Bernold, L. E., and Reinhart, D. (1990). "Process planning for automated stone cutting." J. Comput. Civ. Eng., 4(3), 255-268.
    • (1990) J. Comput. Civ. Eng. , vol.4 , Issue.3 , pp. 255-268
    • Bernold, L.E.1    Reinhart, D.2
  • 5
    • 0343164212 scopus 로고    scopus 로고
    • CAD-integrated excavation and pipe laying
    • Huang, X., and Bernold, L. (1997). "CAD-integrated excavation and pipe laying." J. Constr. Eng. Manage., 123(3), 318-323.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 318-323
    • Huang, X.1    Bernold, L.2
  • 8
    • 13944271449 scopus 로고
    • Prentice-Hall, Englewood Cliffs, N.J.
    • Kavanagh, B. F., and Bird, S. J. G. (1992). Surveying, Prentice-Hall, Englewood Cliffs, N.J.
    • (1992) Surveying
    • Kavanagh, B.F.1    Bird, S.J.G.2
  • 11
    • 13944264388 scopus 로고
    • Julius Hoffman Verlag, Stuttgart, Germany
    • Peters, T. F. (1981). Time is money, Julius Hoffman Verlag, Stuttgart, Germany.
    • (1981) Time Is Money
    • Peters, T.F.1
  • 13
    • 0028732527 scopus 로고
    • Effects of design-integrated process planning on productivity in rebar placement
    • Salim, Md., and Bernold, L. E. (1994). "Effects of design-integrated process planning on productivity in rebar placement." J. Constr. Eng. Manage., 120(4), 720-738.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.4 , pp. 720-738
    • Salim, M.1    Bernold, L.E.2
  • 14
    • 84860081702 scopus 로고    scopus 로고
    • Nov. 26, 2001
    • Trimble, Inc. (2000). (Nov. 26, 2001).
    • (2000)
  • 15
    • 84930121715 scopus 로고
    • Perfection of the buggy whip
    • Tucker, R. (1988). "Perfection of the buggy whip." J. Constr. Eng. Manage., 114(2), 157-171.
    • (1988) J. Constr. Eng. Manage. , vol.114 , Issue.2 , pp. 157-171
    • Tucker, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.