메뉴 건너뛰기




Volumn 130, Issue 4, 2004, Pages 490-499

Process versus data oriented techniques in pile construction productivity assessment

Author keywords

Construction industry; Data analysis; Neural networks; Piles; Predictions; Productivity; Simulation; Statistical analysis

Indexed keywords

DATA ORIENTED TECHNIQUES; INFRASTRUCTURE; PILING MACHINES; PREDICTIONS;

EID: 13944267165     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:4(490)     Document Type: Article
Times cited : (13)

References (9)
  • 2
    • 0023451328 scopus 로고
    • The theory of ratio scale estimation: Saaty analytic hierarchy process
    • Harker, P. T., and Vargas, L. G. (1987). "The theory of ratio scale estimation: Saaty analytic hierarchy process." J. Manage. Sci., 33(11), 1383-1403.
    • (1987) J. Manage. Sci. , vol.33 , Issue.11 , pp. 1383-1403
    • Harker, P.T.1    Vargas, L.G.2
  • 6
    • 13944265363 scopus 로고    scopus 로고
    • Construction productivity assessment using artificial intelligence
    • Victoria, B.C., Canada
    • Zayed, T. M., and Halpin, D. W. (2001a). "Construction productivity assessment using artificial intelligence." Canadian Society for Civil Engineering (CSCE) Conf., Victoria, B.C., Canada, C55.
    • (2001) Canadian Society for Civil Engineering (CSCE) Conf.
    • Zayed, T.M.1    Halpin, D.W.2
  • 7
    • 13944265743 scopus 로고    scopus 로고
    • Simulation of bored piles construction
    • Arlington, Va
    • Zayed, T. M., and Halpin, D. W. (2001b). "Simulation of bored piles construction." Winter Simulation Conf., Arlington, Va.
    • (2001) Winter Simulation Conf.
    • Zayed, T.M.1    Halpin, D.W.2
  • 8


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.