메뉴 건너뛰기




Volumn 18, Issue 2, 2004, Pages 79-85

Progressive analysis procedure for progressive collapse

Author keywords

Collapse; Dynamic analysis; New York; New York City; Nonlinear analysis; Structural analysis; Structural failures; Terrorism

Indexed keywords

COLLAPSE; DYNAMIC ANALYSIS; NEW YORK CITY; NONLINEAR ANALYSIS; STRUCTURAL FAILURES; TERRORISM;

EID: 13944264465     PISSN: 08873828     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0887-3828(2004)18:2(79)     Document Type: Article
Times cited : (195)

References (11)
  • 1
    • 0003611634 scopus 로고    scopus 로고
    • American Society of Civil Engineers publication (note revision of 7-98, does not include building security or antiterrorism but covers all natural hazards), ISBN: 0-7844-0624-3
    • ASCE. (2002). "Minimum design loads for buildings and other structures." American Society of Civil Engineers publication (note revision of 7-98, does not include building security or antiterrorism but covers all natural hazards), ISBN: 0-7844-0624-3.
    • (2002) Minimum Design Loads for Buildings and Other Structures
  • 3
    • 33750126112 scopus 로고    scopus 로고
    • Applicability of seismic design in mitigating progressive collapse
    • Multihazard Mitigation Council of the National Institute of Building Sciences, Washington, D.C.
    • Corley, W. G. (2002). "Applicability of seismic design in mitigating progressive collapse." National Workshop on Prevention of Progressive Collapse in Rosemont, Ill, Multihazard Mitigation Council of the National Institute of Building Sciences, Washington, D.C.
    • (2002) National Workshop on Prevention of Progressive Collapse in Rosemont, Ill
    • Corley, W.G.1
  • 4
    • 33646188916 scopus 로고    scopus 로고
    • Unified facilities criteria (UFC), DoD minimum antiterrorism standards for buildings
    • Department of Defense, U.S. Army Corps of Engineering, Washington, D.C.
    • Department of Defense (DoD). (2002). "Unified facilities criteria (UFC), DoD minimum antiterrorism standards for buildings." Department of Defense, UFC 4-010-01, U.S. Army Corps of Engineering, Washington, D.C., 31.
    • (2002) UFC 4-010-01 , pp. 31
  • 5
    • 45949085719 scopus 로고    scopus 로고
    • Review of existing guidelines and provisions related to progressive collapse
    • Multihazard Mitigation Council of the National Institute of Building Sciences, Washington, D.C.
    • Dusenberry, D. O. (2002). "Review of existing guidelines and provisions related to progressive collapse." National Workshop on Prevention of Progressive Collapse in Rosemont, Ill, Multihazard Mitigation Council of the National Institute of Building Sciences, Washington, D.C.
    • (2002) National Workshop on Prevention of Progressive Collapse in Rosemont, Ill
    • Dusenberry, D.O.1
  • 9
    • 27644490901 scopus 로고    scopus 로고
    • Development of progressive collapse analysis procedure and condition assessment for structures
    • Multihazard Mitigation Council of the National Institute of Building Sciences, Washington, D.C.
    • Krauthammer, T., Hall, R. L., Woodson, S. C., Baylot, J. T., Hayes, J. R., and Sohn, Y. (2002). "Development of progressive collapse analysis procedure and condition assessment for structures." National Workshop on Prevention of Progressive Collapse in Rosemont, Ill. Multihazard Mitigation Council of the National Institute of Building Sciences, Washington, D.C.
    • (2002) National Workshop on Prevention of Progressive Collapse in Rosemont, Ill.
    • Krauthammer, T.1    Hall, R.L.2    Woodson, S.C.3    Baylot, J.T.4    Hayes, J.R.5    Sohn, Y.6
  • 10
    • 14244260281 scopus 로고    scopus 로고
    • Version 8, analysis reference manual, Computers and Structures, Inc., Berkeley, Calif.
    • SAP2000. (2002). Version 8, analysis reference manual, Computers and Structures, Inc., Berkeley, Calif.
    • (2002) SAP2000


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.