메뉴 건너뛰기




Volumn 129, Issue 4, 2003, Pages 454-460

Engineering information classification system

Author keywords

Classification; Information management; Management engineering

Indexed keywords

CONSTRUCTION INDUSTRY; ENCODING (SYMBOLS); INDUSTRIAL ENGINEERING; INFORMATION MANAGEMENT; SCHEDULING; STRATEGIC PLANNING;

EID: 13944262170     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2003)129:4(454)     Document Type: Article
Times cited : (19)

References (16)
  • 3
    • 0000614348 scopus 로고    scopus 로고
    • Methodological and practical aspects of data mining
    • Feelders, A., Daniels, H., and Holsheimer, M. (2000). "Methodological and practical aspects of data mining." Inf. & Manage., 37, 271-281.
    • (2000) Inf. & Manage. , vol.37 , pp. 271-281
    • Feelders, A.1    Daniels, H.2    Holsheimer, M.3
  • 5
    • 0029538120 scopus 로고
    • Constructability information classification scheme
    • Hanlon, E. J., and Sanvido, V. E. (1995). "Constructability information classification scheme." J. Constr. Eng. Manage., 121(4), 337-345.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 337-345
    • Hanlon, E.J.1    Sanvido, V.E.2
  • 6
    • 0011466189 scopus 로고    scopus 로고
    • Adaptability of information classification systems for civil works
    • Kang, L. S., and Paulson, B. C. (1997). "Adaptability of information classification systems for civil works." J. Constr. Eng. Manage., 123(4), 419-426.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.4 , pp. 419-426
    • Kang, L.S.1    Paulson, B.C.2
  • 7
    • 0342809824 scopus 로고    scopus 로고
    • Information management to integrate cost and schedule for civil engineering projects
    • Kang, L. S., and Paulson, B. C. (1998). "Information management to integrate cost and schedule for civil engineering projects." J. Constr. Eng. Manage., 124(5), 381-389.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.5 , pp. 381-389
    • Kang, L.S.1    Paulson, B.C.2
  • 8
    • 0026403348 scopus 로고
    • Work breakdown structure: A simple tool for complex jobs
    • Mansuy, J. (1991). "Work breakdown structure: A simple tool for complex jobs." Cost Eng., 33(12), 15-18.
    • (1991) Cost Eng. , vol.33 , Issue.12 , pp. 15-18
    • Mansuy, J.1
  • 10
    • 0020146991 scopus 로고
    • The control function of management
    • Merchant, K. A. (1982). "The control function of management." Sloan Management Review, Summer, 43-55.
    • (1982) Sloan Management Review , Issue.SUMMER , pp. 43-55
    • Merchant, K.A.1
  • 13
    • 0018519695 scopus 로고
    • A conceptual framework for the design of organizational control mechanisms
    • Ouchi, W. G. (1979). "A conceptual framework for the design of organizational control mechanisms." Manage. Sci., September, 833-847.
    • (1979) Manage. Sci. , Issue.SEPTEMBER , pp. 833-847
    • Ouchi, W.G.1
  • 14
    • 0033310624 scopus 로고    scopus 로고
    • Advocating a deliverable-oriented work breakdown structure
    • Rad, P. F. (1999). "Advocating a deliverable-oriented work breakdown structure." Cost Eng., 41(12), 35-39.
    • (1999) Cost Eng. , vol.41 , Issue.12 , pp. 35-39
    • Rad, P.F.1
  • 16
    • 0022727166 scopus 로고
    • Designing project organizations: An expanded process
    • Tatum, C. B. (1986). "Designing project organizations: An expanded process." J. Constr. Eng. Manage., 112(2), 259-272.
    • (1986) J. Constr. Eng. Manage. , vol.112 , Issue.2 , pp. 259-272
    • Tatum, C.B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.