메뉴 건너뛰기




Volumn 130, Issue 4, 2004, Pages 576-585

Effective practice utilization using performance prediction software

Author keywords

Computer software; Construction industry; Predictions; Project management; Project planning

Indexed keywords

DISCRIMINANT FUNCTION ANALYSIS (DFA); PREDICTIONS; PROJECT PLANNING; SCHEDULE PERFORMANCE;

EID: 13944252926     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:4(576)     Document Type: Article
Times cited : (9)

References (17)
  • 1
    • 0003594777 scopus 로고
    • Rep. Source Document 87 (Feb.), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • Albanese, R. (1993). "Team building: Implications for the design/construction process." Rep. Source Document 87 (Feb.), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • (1993) Team Building: Implications for the Design/construction Process.
    • Albanese, R.1
  • 2
    • 0003747807 scopus 로고
    • Publication 3-1 (July), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (1986). "Constructability: A primer." Publication 3-1 (July), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • (1986) Constructability: A Primer
  • 3
    • 6744247968 scopus 로고
    • Publication 32-1 (May), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (1993). "Zero injury techniques." Publication 32-1 (May), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • (1993) Zero Injury Techniques
  • 4
    • 0004715737 scopus 로고
    • Special Publication 43-1 (Nov.), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (1994). "Project change management." Special Publication 43-1 (Nov.), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • (1994) Project Change Management
  • 5
    • 13944254515 scopus 로고    scopus 로고
    • BMM99-3 (July), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (1999). "Benchmarking and metrics value of best practices report." BMM99-3 (July), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • (1999) Benchmarking and Metrics Value of Best Practices Report
  • 6
    • 13944261351 scopus 로고    scopus 로고
    • BMM2000-2 (Aug.), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (2000). "Benchmarking and metrics data report for 2000." BMM2000-2 (Aug.), Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • (2000) Benchmarking and Metrics Data Report for 2000
  • 11
    • 0033690431 scopus 로고    scopus 로고
    • Project performance control in reconstruction projects
    • McKim, R., Hegazy, T., and Attalla, M. (2000). "Project performance control in reconstruction projects." J. Constr. Eng. Manage., 126(2), 137-141.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.2 , pp. 137-141
    • McKim, R.1    Hegazy, T.2    Attalla, M.3
  • 13
    • 0026171588 scopus 로고
    • Resource strategies for dynamic project management
    • Padilla, E. M., and Carr, R. I. (1991). "Resource strategies for dynamic project management." J. Constr. Eng. Manage., 117(2), 279-293.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.2 , pp. 279-293
    • Padilla, E.M.1    Carr, R.I.2
  • 15
    • 0026219168 scopus 로고
    • Cost and schedule control integration: Issues and needs
    • Rasdorf, W. J., and Abudayyeh, O. Y. (1991). "Cost and schedule control integration: Issues and needs." J. Constr. Eng. Manage., 117(3), 486-502.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.3 , pp. 486-502
    • Rasdorf, W.J.1    Abudayyeh, O.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.