|
Volumn 37, Issue 5, 2005, Pages 493-501
|
Experiences with a gas driven, desiccant assisted air conditioning system with geothermal energy for an office building
|
Author keywords
Air conditioning; Borehole heat exchanger; Combined heat and power generation; Desiccant; Gas; Geothermal; Sorption
|
Indexed keywords
BOREHOLES;
CEILINGS;
COSTS;
ELECTRIC POWER GENERATION;
ENERGY UTILIZATION;
ESTIMATION;
GEOTHERMAL ENERGY;
HEAT EXCHANGERS;
INVESTMENTS;
OFFICE BUILDINGS;
SILICA GEL;
WASTE HEAT;
BOREHOLE HEAT EXCHANGERS;
COMBINED HEAT AND POWER GENERATION;
DESICCANT;
ELECTRIC CHILLERS;
GAS COSTS;
AIR CONDITIONING;
|
EID: 13244259443
PISSN: 03787788
EISSN: None
Source Type: Journal
DOI: 10.1016/j.enbuild.2004.09.011 Document Type: Article |
Times cited : (69)
|
References (14)
|