메뉴 건너뛰기




Volumn 3, Issue 1-2, 1996, Pages 83-95

Cost estimating practices in Australian construction

Author keywords

[No Author keywords available]

Indexed keywords


EID: 13044265789     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/eb021024     Document Type: Review
Times cited : (3)

References (35)
  • 2
    • 84992932170 scopus 로고
    • Co-ordinated system of information retrieval for building contractor's tendering
    • University of Salford, January
    • Betts, M. (1987) Co-ordinated system of information retrieval for building contractor's tendering. Transactions of Building Cost Research Conference, University of Salford, January, 339-355.
    • (1987) Transactions of Building Cost Research Conference , pp. 339-355
    • Betts, M.1
  • 3
    • 4243130940 scopus 로고
    • Achieving and measuring flexibility in project information retrieval
    • Betts, M. (1991) Achieving and measuring flexibility in project information retrieval. Construction Management and Economics, 9(3), 231-245.
    • (1991) Construction Management and Economics , vol.9 , Issue.3 , pp. 231-245
    • Betts, M.1
  • 4
    • 4243151144 scopus 로고
    • Risk analysis of construction cost estimates
    • School of Building, University of New South Wales
    • Brotherton, R. (1993) Risk analysis of construction cost estimates. B. Build. Thesis, School of Building, University of New South Wales.
    • (1993) B. Build. Thesis
    • Brotherton, R.1
  • 10
    • 4243187558 scopus 로고
    • Risk analysis-an extension of price prediction techniques for building work
    • Flanagan, R. & Norman, G. (1984) Risk analysis-an extension of price prediction techniques for building work. Construction Papers, 1(3), 27-34.
    • (1984) Construction Papers , vol.1 , Issue.3 , pp. 27-34
    • Flanagan, R.1    Norman, G.2
  • 13
    • 4243066781 scopus 로고
    • Method of quantifying probabilities and multivariate utilities
    • Huber, G.P. (1974) Method of quantifying probabilities and multivariate utilities. Decision Sciences, 5, 12-17.
    • (1974) Decision Sciences , vol.5 , pp. 12-17
    • Huber, G.P.1
  • 16
    • 85005307030 scopus 로고
    • Simulation versus single value estimates in capital expenditure analysis
    • Lewellen, W.G. & Long, M.S. (1972) Simulation versus single value estimates in capital expenditure analysis. Decision Sciences, 3(4), 19-23.
    • (1972) Decision Sciences , vol.3 , Issue.4 , pp. 19-23
    • Lewellen, W.G.1    Long, M.S.2
  • 18
    • 84910909593 scopus 로고
    • Critique of ranking procedure and subjective probability distributions
    • Morrison, N. (1967) Critique of ranking procedure and subjective probability distributions. Management Science, 14, B253-B254.
    • (1967) Management Science , vol.14 , pp. B253-B254
    • Morrison, N.1
  • 20
    • 0039399786 scopus 로고
    • Methods of analysing risk exposure in the cost estimates of high quality offices
    • Newton, S. (1992) Methods of analysing risk exposure in the cost estimates of high quality offices. Construction Management and Economics, 10(5), 431-449.
    • (1992) Construction Management and Economics , vol.10 , Issue.5 , pp. 431-449
    • Newton, S.1
  • 22
    • 4243062158 scopus 로고
    • Closing the credibility gap in construction cost estimating
    • February
    • Picardi, A. (1973) Closing the credibility gap in construction cost estimating. APEC Journal, February, p.4.
    • (1973) APEC Journal , pp. 4
    • Picardi, A.1
  • 23
    • 0001579697 scopus 로고
    • Risk aversion in the small and in the large
    • Pratt, J.W. (1964) Risk aversion in the small and in the large. Econometrica, 32, 122-136.
    • (1964) Econometrica , vol.32 , pp. 122-136
    • Pratt, J.W.1
  • 25
    • 84990718285 scopus 로고
    • Addison-Wesley, Reading, Massachusetts
    • RaiflFa, H. (1968) Decision Analysis. Addison-Wesley, Reading, Massachusetts.
    • (1968) Decision Analysis
    • RaiflFa, H.1
  • 27
    • 0028681920 scopus 로고
    • Contingency revisited
    • Samid, G. (1994) Contingency revisited. Cost Engineer, 36(12), 23-26.
    • (1994) Cost Engineer , vol.36 , Issue.12 , pp. 23-26
    • Samid, G.1
  • 28
  • 31
    • 4243148920 scopus 로고
    • The effect of risks and uncertainties on subcontract bid prices
    • University of New South Wales
    • Uher, T.E. (1990) The effect of risks and uncertainties on subcontract bid prices. PhD Thesis, University of New South Wales.
    • (1990) PhD Thesis
    • Uher, T.E.1
  • 32
    • 84992965292 scopus 로고
    • Practical approach to risk management in construction
    • School of Building, University of New South Wales
    • Uher, T.E. (1991) Practical approach to risk management in construction. Proceedings of the Continuing Education Seminar. School of Building, University of New South Wales.
    • (1991) Proceedings of the Continuing Education Seminar
    • Uher, T.E.1
  • 34
    • 84947355523 scopus 로고
    • The assessment of prior distributions in Baysian analysis
    • Winkler, R.L. (1967) The assessment of prior distributions in Baysian analysis. Journal of American Statistical Society, 62, 776-800.
    • (1967) Journal of American Statistical Society , vol.62 , pp. 776-800
    • Winkler, R.L.1
  • 35
    • 2942572914 scopus 로고
    • Project cost sensitivity and variability analysis
    • Yeo, K.T. (1991) Project cost sensitivity and variability analysis. International Journal of Project Management, 9(2), 111-116.
    • (1991) International Journal of Project Management , vol.9 , Issue.2 , pp. 111-116
    • Yeo, K.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.