-
1
-
-
0027634134
-
"BPSS: A scheduling system for the packaging industry
-
Alder, L., Fraiman, N. M., Kobacker, E., Pinendo, M., Plotnitcoff, J. C., and Wu, T. P. (1993). "BPSS: a scheduling system for the packaging industry." Oper. Res., 41, 641-648.
-
(1993)
Oper. Res.
, vol.41
, pp. 641-648
-
-
Alder, L.1
Fraiman, N.M.2
Kobacker, E.3
Pinendo, M.4
Plotnitcoff, J.C.5
Wu T., P.6
-
2
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
Pergamon, New York
-
Allahverdi, A., Gupta, J. N. D., and Aldowaisan, T. (1999). "A review of scheduling research involving setup considerations." Omega international journal management science, Vol. 27, Pergamon, New York, 219-239.
-
(1999)
Omega International Journal Management Science
, vol.27
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
3
-
-
0035275612
-
Irrigation scheduling using mixed-integer linear programming
-
Anwar, A. A., and Clarke, D. (2001). "Irrigation scheduling using mixed-integer linear programming." J. Irrig. Drain. Eng., 127(2), 63-69.
-
(2001)
J. Irrig. Drain. Eng.
, vol.127
, Issue.2
, pp. 63-69
-
-
Anwar, A.A.1
Clarke, D.2
-
4
-
-
0002349523
-
Weighted-tardiness scheduling on parallel machines with proportional weights
-
Arkin, E. M., and Roundy, R. O. (1991). "Weighted-tardiness scheduling on parallel machines with proportional weights." Oper. Res., 39(1), 64-81.
-
(1991)
Oper. Res.
, vol.39
, Issue.1
, pp. 64-81
-
-
Arkin, E.M.1
Roundy, R.O.2
-
5
-
-
0026923121
-
Minimizing job idleness in a deadline constrained environments
-
Bagchi, U., and Ahmadi, R. H. (1992). "Minimizing job idleness in a deadline constrained environments." Oper. Res., 40(5), 972-985.
-
(1992)
Oper. Res.
, vol.40
, Issue.5
, pp. 972-985
-
-
Bagchi, U.1
Ahmadi, R.H.2
-
6
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
Baker, K. R., and Scudder, G. D. (1990). "Sequencing with earliness and tardiness penalties: A review." Oper. Res., 38(1), 22-36.
-
(1990)
Oper. Res.
, vol.38
, Issue.1
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
7
-
-
0034187636
-
Scheduling aircraft landings - The static case
-
Beasley, J. E., Krishnamoorthy, M., Sharaiha, Y. M., and Abramson, D. (2000). "Scheduling aircraft landings-The static case." Transp. Sci., 34(2), 180-197.
-
(2000)
Transp. Sci.
, vol.34
, Issue.2
, pp. 180-197
-
-
Beasley, J.E.1
Krishnamoorthy, M.2
Sharaiha, Y.M.3
Abramson, D.4
-
8
-
-
84989725928
-
Scheduling tasks with sequence-dependent processing times
-
Bianco, L., Ricciardelli, S., Rinaldi, G., and Sassano, A. (1988). "Scheduling tasks with sequence-dependent processing times." Naval Res. Logistics Quart., 35(2), 177-184.
-
(1988)
Naval Res. Logistics Quart.
, vol.35
, Issue.2
, pp. 177-184
-
-
Bianco, L.1
Ricciardelli, S.2
Rinaldi, G.3
Sassano, A.4
-
9
-
-
0020969878
-
Irrigation water delivery for equity between users
-
Bishop, A. A., and Long, A. K. (1983). "Irrigation water delivery for equity between users." J. Irrig. Drain. Eng., 109(4), 349-356.
-
(1983)
J. Irrig. Drain. Eng.
, vol.109
, Issue.4
, pp. 349-356
-
-
Bishop, A.A.1
Long, A.K.2
-
10
-
-
0023977809
-
Single machine scheduling to minimize weighted earliness subject to no tardy jobs
-
Chard, S., and Schneeberger, H. (1988). "Single machine scheduling to minimize weighted earliness subject to no tardy jobs." Eur. J. Oper. Res., 34(2), 221-230.
-
(1988)
Eur. J. Oper. Res.
, vol.34
, Issue.2
, pp. 221-230
-
-
Chard, S.1
Schneeberger, H.2
-
11
-
-
84987012917
-
Technical note: A simple model for optimizing the single machine early/tardy problem with sequence dependent setups
-
Coleman, B. J. (1992). "Technical note: A simple model for optimizing the single machine early/tardy problem with sequence dependent setups." Prod. Oper. Manage., 1(2), 225-228.
-
(1992)
Prod. Oper. Manage.
, vol.1
, Issue.2
, pp. 225-228
-
-
Coleman, B.J.1
-
12
-
-
0023558664
-
A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden
-
Fry, T. D., and Leong, G. K. (1987). "A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden." Comput. Oper. Res., 14(5), 363-368.
-
(1987)
Comput. Oper. Res.
, vol.14
, Issue.5
, pp. 363-368
-
-
Fry, T.D.1
Leong, G.K.2
-
13
-
-
0034269570
-
A model for equitable distribution of canal water
-
Khepar, S. D., Gulati, H. S., Yadav, A. K., and Brar, T. P. S. (2000). "A model for equitable distribution of canal water." Irrig. Sci., 19, 191-197.
-
(2000)
Irrig. Sci.
, vol.19
, pp. 191-197
-
-
Khepar, S.D.1
Gulati, H.S.2
Yadav, A.K.3
Brar, T.P.S.4
-
14
-
-
0028669874
-
Proposal for equitable water allocation for rotational irrigation in Pakistan
-
Latif, M., and Sarwar, S. (1994). "Proposal for equitable water allocation for rotational irrigation in Pakistan." Irrig. Drain. Syst., 8(1), 35-48.
-
(1994)
Irrig. Drain. Syst.
, vol.8
, Issue.1
, pp. 35-48
-
-
Latif, M.1
Sarwar, S.2
-
15
-
-
0033165933
-
A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem
-
Liaw, C.-F. (1999). "A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem." Comput. Oper. Res., 26(7), 679-693.
-
(1999)
Comput. Oper. Res.
, vol.26
, Issue.7
, pp. 679-693
-
-
Liaw, C.-F.1
-
16
-
-
0009565705
-
Heuristic algorithms for solving earliness-tardiness scheduling problem with machine vacations
-
Mannur, N. R., and Addagatla, J. B. (1993). "Heuristic algorithms for solving earliness-tardiness scheduling problem with machine vacations." Comput. Ind. Eng., 25(1-4), 255-258.
-
(1993)
Comput. Ind. Eng.
, vol.25
, Issue.1-4
, pp. 255-258
-
-
Mannur, N.R.1
Addagatla, J.B.2
-
17
-
-
0005232076
-
Optimal scheduling of irrigation for lateral canals
-
Reddy, J. M., Wilamowski, B., and Sharmasarkar, F. C. (1999). "Optimal scheduling of irrigation for lateral canals." ICID J., 48(3), 1-12.
-
(1999)
ICID J.
, vol.48
, Issue.3
, pp. 1-12
-
-
Reddy, J.M.1
Wilamowski, B.2
Sharmasarkar, F.C.3
-
18
-
-
0034066565
-
A new planning model for canal scheduling of rotational irrigation
-
Santhi, C., and Pundarikanthan, N. (2000). "A new planning model for canal scheduling of rotational irrigation." Agric. Water Manage., 43, 327-343.
-
(2000)
Agric. Water Manage.
, vol.43
, pp. 327-343
-
-
Santhi, C.1
Pundarikanthan, N.2
-
19
-
-
0027168086
-
Equitable distribution in a rotation irrigation system
-
July 21-23, Park City, Utah, ASCE, New York
-
Shah, M. H., and Willardson, L. S. (1993). "Equitable distribution in a rotation irrigation system." Management of Irrigation and Drainage Systems: Integrated Perspectives, Conf., July 21-23, Park City, Utah, ASCE, New York, 24-31.
-
(1993)
Management of Irrigation and Drainage Systems: Integrated Perspectives, Conf.
, pp. 24-31
-
-
Shah, M.H.1
Willardson, L.S.2
-
20
-
-
0029304850
-
Improved 0-1 programming model for optimal flow scheduling in irrigation canals
-
Wang, Z., Reddy, M. J., and Feyen, J. (1995). "Improved 0-1 programming model for optimal flow scheduling in irrigation canals." Irrig. Drain. Syst., 9, 105-116.
-
(1995)
Irrig. Drain. Syst.
, vol.9
, pp. 105-116
-
-
Wang, Z.1
Reddy, M.J.2
Feyen, J.3
-
21
-
-
0033078946
-
Survey of scheduling research involving setup times
-
Yang, W., and Liao, C. (1999). "Survey of scheduling research involving setup times." Int. J. Syst. Sci., 30(2), 143-155.
-
(1999)
Int. J. Syst. Sci.
, vol.30
, Issue.2
, pp. 143-155
-
-
Yang, W.1
Liao, C.2
|