메뉴 건너뛰기




Volumn 131, Issue 1, 2005, Pages 23-32

Building better: Technical support for construction

Author keywords

Constructability; Construction management; Design build; Information management; Innovation; Professional development

Indexed keywords

CONSTRUCTABILITY; CONSTRUCTION MANAGEMENT; DESIGN/BUILD; INNOVATION; PROFESSIONAL DEVELOPMENT;

EID: 12344310356     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:1(23)     Document Type: Article
Times cited : (17)

References (21)
  • 1
    • 12344310886 scopus 로고
    • Constructability concepts file
    • Austin, Tex.
    • Construction Industry Institute (CII) (1987). "Constructability concepts file." Constructability task force, publication 3-3, Austin, Tex.
    • (1987) Constructability Task Force, Publication 3-3
  • 2
    • 0030196033 scopus 로고    scopus 로고
    • Examples and characteristics of shared project models
    • Fischer, M., and Froese, T. (1996). "Examples and characteristics of shared project models," J. Comput. Civ. Eng., 10(3), 174-182.
    • (1996) J. Comput. Civ. Eng. , vol.10 , Issue.3 , pp. 174-182
    • Fischer, M.1    Froese, T.2
  • 3
    • 0004411582 scopus 로고    scopus 로고
    • Characteristics of design-relevant Constructability knowledge
    • Fischer, M. A. and Tatum, C. B. (1997). "Characteristics of design-relevant Constructability knowledge." J. Constr. Eng. Manage., 123(3), 253-260.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 253-260
    • Fischer, M.A.1    Tatum, C.B.2
  • 4
    • 0028494765 scopus 로고
    • Model for Constructability approach selection
    • Gugel, J. G., and Russell, J. S. (1994). "Model for Constructability approach selection," J. Constr. Eng. Manage., 120(3), 509-521.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.3 , pp. 509-521
    • Gugel, J.G.1    Russell, J.S.2
  • 5
    • 0004554435 scopus 로고    scopus 로고
    • Technology strategy and competitive performance in bridge construction
    • Hampson, K., and Tatum, C. B. (1997). "Technology strategy and competitive performance in bridge construction." J. Constr. Eng. Manage., 123(2), 153-161.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.2 , pp. 153-161
    • Hampson, K.1    Tatum, C.B.2
  • 6
    • 0031268137 scopus 로고    scopus 로고
    • Constructability feedback systems: Issues and illustrative prototype
    • Kartam, N. (1997). "Constructability feedback systems: Issues and illustrative prototype." J. Perform. Constr. Facil, 11(4), 178-183.
    • (1997) J. Perform. Constr. Facil , vol.11 , Issue.4 , pp. 178-183
    • Kartam, N.1
  • 7
    • 0026172143 scopus 로고
    • Microlevel study of integration in high-strength concrete innovation
    • Nam, C. H., Gasiorowski, J. G., and Tatum, C. B. (1991). "Microlevel study of integration in high-strength concrete innovation." J. Constr. Eng. Manage., 117(2), 294-309.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.2 , pp. 294-309
    • Nam, C.H.1    Gasiorowski, J.G.2    Tatum, C.B.3
  • 8
    • 0022674213 scopus 로고
    • Industrial project constructability improvement
    • O'Connor, J. T., and Tucker, R. L. (1986). "Industrial project Constructability improvement." J. Constr. Eng. Manage., 112(1), 69-82.
    • (1986) J. Constr. Eng. Manage. , vol.112 , Issue.1 , pp. 69-82
    • O'Connor, J.T.1    Tucker, R.L.2
  • 9
    • 0015316163 scopus 로고
    • System for control of construction quality
    • Parsons, R. (1972). "System for control of construction quality." J. Constr. Eng. Div., 98(1), 21-36.
    • (1972) J. Constr. Eng. Div. , vol.98 , Issue.1 , pp. 21-36
    • Parsons, R.1
  • 11
    • 0023770427 scopus 로고
    • Segmental placement of the renton outfall: Construction innovation
    • Stewart, W. S., and Tatum, C. B. (1988). "Segmental placement of the renton outfall: Construction innovation." J. Constr. Eng. Manage., 114(3), 390-407.
    • (1988) J. Constr. Eng. Manage. , vol.114 , Issue.3 , pp. 390-407
    • Stewart, W.S.1    Tatum, C.B.2
  • 12
    • 0020719569 scopus 로고
    • Heavy rigging for nuclear projects
    • Tatum, C. B. (1983a). "Heavy rigging for nuclear projects." J. Constr. Eng. Manage., 109(1), 48-60.
    • (1983) J. Constr. Eng. Manage. , vol.109 , Issue.1 , pp. 48-60
    • Tatum, C.B.1
  • 13
    • 0020764401 scopus 로고
    • Innovations in nuclear concrete construction
    • Tatum, C. B. (1983b) "Innovations in nuclear concrete construction." J. Constr. Eng. Manage., 109(2), 131-145.
    • (1983) J. Constr. Eng. Manage. , vol.109 , Issue.2 , pp. 131-145
    • Tatum, C.B.1
  • 14
    • 0021494316 scopus 로고
    • Organizing large projects: How managers decide
    • Tatum, C. B. (1984). "Organizing large projects: How managers decide." J. Constr. Eng. Manage., 110(3) 346-358.
    • (1984) J. Constr. Eng. Manage. , vol.110 , Issue.3 , pp. 346-358
    • Tatum, C.B.1
  • 15
    • 0023363812 scopus 로고
    • Improving constructibility during conceptual planning
    • Tatum, C. B. (1987). "Improving constructibility during conceptual planning." J. Constr. Eng. Manage., 113(2) 191-207.
    • (1987) J. Constr. Eng. Manage. , vol.113 , Issue.2 , pp. 191-207
    • Tatum, C.B.1
  • 16
    • 0024649254 scopus 로고
    • Management challenges of integrating construction methods and design approaches
    • Tatum, C. B., (1989a). "Management challenges of integrating construction methods and design approaches." J. Manage. Eng., 5(2), 139-154.
    • (1989) J. Manage. Eng. , vol.5 , Issue.2 , pp. 139-154
    • Tatum, C.B.1
  • 17
    • 0024754043 scopus 로고
    • Managing for increased design and construction innovation
    • Tatum, C. B., (1989b). "Managing for increased design and construction innovation." J. Manage. Eng., 5(4) 385-399.
    • (1989) J. Manage. Eng. , vol.5 , Issue.4 , pp. 385-399
    • Tatum, C.B.1
  • 18
    • 0141902445 scopus 로고
    • Process of innovation for "up/down" construction at Rowes Wharf
    • Tatum, C. B., Bauer, M. F., and Meade, A. W. (1989). "Process of innovation for "up/down" construction at Rowes Wharf." J. Constr. Eng. Manage., 115(2) 179-195.
    • (1989) J. Constr. Eng. Manage. , vol.115 , Issue.2 , pp. 179-195
    • Tatum, C.B.1    Bauer, M.F.2    Meade, A.W.3
  • 19
    • 0019690505 scopus 로고
    • Construction plant requirements for nuclear sites
    • Tatum, C. B., and Harris, J. A. (1981). "Construction plant requirements for nuclear sites." J. Constr. Div., Am. Soc. Civ. Eng., 107(4), 543-550.
    • (1981) J. Constr. Div., Am. Soc. Civ. Eng. , vol.107 , Issue.4 , pp. 543-550
    • Tatum, C.B.1    Harris, J.A.2
  • 20
    • 0034545205 scopus 로고    scopus 로고
    • Coordinating building systems: Process and knowledge
    • Tatum, C. B., and Korman, T. (2000). "Coordinating building systems: Process and knowledge." J. Archil. Eng., 6(4), 116-121.
    • (2000) J. Archil. Eng. , vol.6 , Issue.4 , pp. 116-121
    • Tatum, C.B.1    Korman, T.2
  • 21
    • 84929986553 scopus 로고
    • Managing the engineering/ construction interface for improved project performance
    • Boston
    • Tatum, C. B., and Teague, F. G. (1981). "Managing the engineering/ construction interface for improved project performance." Project Management Institute Proc., Boston.
    • (1981) Project Management Institute Proc.
    • Tatum, C.B.1    Teague, F.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.