메뉴 건너뛰기




Volumn 165, Issue 1, 2005, Pages 139-156

An experimental analysis of solution performance in a resource sharing and scheduling problem

Author keywords

Experimental design; Manufacturing; Mathematical programming; Production planning; Resource sharing

Indexed keywords

BOUNDARY CONDITIONS; COMPUTATIONAL COMPLEXITY; ENGINEERS; LINEAR PROGRAMMING; MANUFACTURE; PROBLEM SOLVING; PRODUCTION CONTROL; RESOURCE ALLOCATION; STRATEGIC PLANNING;

EID: 12344260607     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2003.12.020     Document Type: Article
Times cited : (17)

References (34)
  • 1
    • 0019590377 scopus 로고
    • Hierarchical production planning: A single stage system
    • Bitran G.R., Haas E.A., Hax A.C. Hierarchical production planning: A single stage system. Operations Research. 29(4):1981;717-743
    • (1981) Operations Research , vol.29 , Issue.4 , pp. 717-743
    • Bitran, G.R.1    Haas, E.A.2    Hax, A.C.3
  • 2
    • 84985824397 scopus 로고
    • A hierarchical production planning and scheduling model
    • Bowers M.R., Jarvis J.P. A hierarchical production planning and scheduling model. Decision Sciences. 23(1):1992;144-159
    • (1992) Decision Sciences , vol.23 , Issue.1 , pp. 144-159
    • Bowers, M.R.1    Jarvis, J.P.2
  • 3
    • 0023399272 scopus 로고
    • Capacity cost and scheduling analysis for a multiproduct flexible manufacturing cell
    • Chakravarty A.K., Shtub A. Capacity cost and scheduling analysis for a multiproduct flexible manufacturing cell. International Journal of Production Research. 25(8):1987;1143-1156
    • (1987) International Journal of Production Research , vol.25 , Issue.8 , pp. 1143-1156
    • Chakravarty, A.K.1    Shtub, A.2
  • 4
    • 0025429972 scopus 로고
    • A multiobjective evaluation of flexible manufacturing system loading heuristic
    • Chen Y., Askin R.G. A multiobjective evaluation of flexible manufacturing system loading heuristic. International Journal of Production Research. 28:1990;895-911
    • (1990) International Journal of Production Research , vol.28 , pp. 895-911
    • Chen, Y.1    Askin, R.G.2
  • 5
    • 0025595213 scopus 로고
    • A methodical approach to the flexible-manufacturing-system batching, loading and tool configuration problems
    • Co H.C., Biermann J.S., Chen S.K. A methodical approach to the flexible-manufacturing-system batching, loading and tool configuration problems. International Journal of Production Research. 28:1990;2171-2186
    • (1990) International Journal of Production Research , vol.28 , pp. 2171-2186
    • Co, H.C.1    Biermann, J.S.2    Chen, S.K.3
  • 6
    • 0024769314 scopus 로고
    • Single machine scheduling with controllable processing times and number of jobs tardy
    • Daniels R.L., Sarin R.K. Single machine scheduling with controllable processing times and number of jobs tardy. Operations Research. 37:1989;981-984
    • (1989) Operations Research , vol.37 , pp. 981-984
    • Daniels, R.L.1    Sarin, R.K.2
  • 7
    • 0015725454 scopus 로고
    • Project scheduling under resource constraints: Historical review and categorization of procedures
    • Davis E.W. Project scheduling under resource constraints: Historical review and categorization of procedures. AIIE Transactions. 5(4):1973;297-313
    • (1973) AIIE Transactions , vol.5 , Issue.4 , pp. 297-313
    • Davis, E.W.1
  • 10
    • 0020100192 scopus 로고
    • Using lagrangean techniques to solve hierarchical production planning problems
    • Graves S.C. Using lagrangean techniques to solve hierarchical production planning problems. Management Science. 28(3):1982;260-274
    • (1982) Management Science , vol.28 , Issue.3 , pp. 260-274
    • Graves, S.C.1
  • 13
    • 0025460582 scopus 로고
    • Joint consideration of grouping and loading problems in a flexible manufacturing system
    • Kumar P., Tewari N.K., Singh N. Joint consideration of grouping and loading problems in a flexible manufacturing system. International Journal of Production Research. 28:1990;1345-1356
    • (1990) International Journal of Production Research , vol.28 , pp. 1345-1356
    • Kumar, P.1    Tewari, N.K.2    Singh, N.3
  • 14
    • 0015095281 scopus 로고
    • An efficient algorithm for multi-item scheduling
    • Lasdon L.S., Terjung R.C. An efficient algorithm for multi-item scheduling. Operations Research. 19(4):1971;946-969
    • (1971) Operations Research , vol.19 , Issue.4 , pp. 946-969
    • Lasdon, L.S.1    Terjung, R.C.2
  • 16
    • 0001372404 scopus 로고
    • Programming of economic lot sizes
    • Manne A.S. Programming of economic lot sizes. Management Science. 4(2):1958;115-135
    • (1958) Management Science , vol.4 , Issue.2 , pp. 115-135
    • Manne, A.S.1
  • 17
    • 0020895635 scopus 로고
    • A modeling framework for planning and control of production in discrete parts manufacturing systems and assembly systems
    • Maxwell W., Muckstadt J.A., Thomas J., Vander-Eecken J. A modeling framework for planning and control of production in discrete parts manufacturing systems and assembly systems. Interfaces. 13:1983;92-104
    • (1983) Interfaces , vol.13 , pp. 92-104
    • Maxwell, W.1    Muckstadt, J.A.2    Thomas, J.3    Vander-Eecken, J.4
  • 18
    • 0030213838 scopus 로고
    • Hierarchical production planning for complex manufacturing systems
    • Mehra A., Minis I., Proth J.M. Hierarchical production planning for complex manufacturing systems. Advances in Engineering Software. 26:1995;209-218
    • (1995) Advances in Engineering Software , vol.26 , pp. 209-218
    • Mehra, A.1    Minis, I.2    Proth, J.M.3
  • 19
    • 0003486756 scopus 로고    scopus 로고
    • Design and Analysis of Experiments
    • New York: John Wiley
    • Montgomery D.C. Design and Analysis of Experiments. fourth ed.:2001;John Wiley, New York
    • (2001) Fourth Ed.
    • Montgomery, D.C.1
  • 20
    • 0022787783 scopus 로고
    • Two level heuristic for the resource constrained scheduling problem
    • Norbis M.I., Smith J.M. Two level heuristic for the resource constrained scheduling problem. International Journal of Production Research. 24(5):1986;1203-1220
    • (1986) International Journal of Production Research , vol.24 , Issue.5 , pp. 1203-1220
    • Norbis, M.I.1    Smith, J.M.2
  • 21
    • 0024925588 scopus 로고
    • Control of a production system with variable yield and random demand
    • Parlar M., Gerchak Y. Control of a production system with variable yield and random demand. Computers and Operations Research. 16:1989;315-324
    • (1989) Computers and Operations Research. , vol.16 , pp. 315-324
    • Parlar, M.1    Gerchak, Y.2
  • 22
    • 0021460636 scopus 로고
    • A comparison approach for solving the multiple constrained resource project scheduling problem
    • Patterson J.H. A comparison approach for solving the multiple constrained resource project scheduling problem. Management Science. 30(7):1984;854-867
    • (1984) Management Science , vol.30 , Issue.7 , pp. 854-867
    • Patterson, J.H.1
  • 24
    • 0025418241 scopus 로고
    • A model and a solution procedure for the machine loading and tool allocation problem in a flexible manufacturing system
    • Ram B., Sarin S., Chen C.S. A model and a solution procedure for the machine loading and tool allocation problem in a flexible manufacturing system. International Journal of Production Research. 28:1990;637-645
    • (1990) International Journal of Production Research , vol.28 , pp. 637-645
    • Ram, B.1    Sarin, S.2    Chen, C.S.3
  • 29
    • 0025548968 scopus 로고
    • The location routing problem: Considerations in physical distribution systems
    • Srivastava R., Benton W.C. The location routing problem: Considerations in physical distribution systems. Computers and Operations Research. 17:1990;427-435
    • (1990) Computers and Operations Research. , vol.17 , pp. 427-435
    • Srivastava, R.1    Benton, W.C.2
  • 30
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time resource tradeoffs: The nonpreemptive case
    • Talbot F.B. Resource-constrained project scheduling with time resource tradeoffs: The nonpreemptive case. Management Science. 28(10):1982;1192-1210
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1192-1210
    • Talbot, F.B.1
  • 32
    • 0022229173 scopus 로고
    • Planning programmable assembly systems
    • S.Y. Nof. New York: John Wiley & Sons. (Chapter 62)
    • Whitney D.E. Planning programmable assembly systems. Nof S.Y. Handbook of Industrial Robotics. 1985;John Wiley & Sons, New York. (Chapter 62)
    • (1985) Handbook of Industrial Robotics
    • Whitney, D.E.1
  • 33
    • 12344266313 scopus 로고
    • The Charles Stark Draper Laboratory, MIT, Boston, Massachusetts, personal communication
    • Whitney, D.E., 1988. The Charles Stark Draper Laboratory, MIT, Boston, Massachusetts, personal communication
    • (1988)
    • Whitney, D.E.1
  • 34
    • 0022471389 scopus 로고
    • Models of flexible manufacturing systems with limited local buffers
    • Yao D.D., Buzacott J.A. Models of flexible manufacturing systems with limited local buffers. International Journal of Production Research. 24(1):1986;107-1
    • (1986) International Journal of Production Research , vol.24 , Issue.1 , pp. 107-111
    • Yao, D.D.1    Buzacott, J.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.