메뉴 건너뛰기




Volumn 131, Issue 1, 2005, Pages 127-136

Automating schedule review for expressway construction

Author keywords

Automation; Construction management; Highway construction; Scheduling

Indexed keywords

AUTOMATION; COMPUTER SOFTWARE; COMPUTER SYSTEMS; CONTRACTS; ERROR ANALYSIS; PROJECT MANAGEMENT; SCHEDULING; STRATEGIC PLANNING;

EID: 12344251992     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:1(127)     Document Type: Review
Times cited : (10)

References (9)
  • 2
    • 0025415681 scopus 로고
    • Knowledge-elicitation study in construction scheduling domain
    • De La Garza, J. M., and Ibbs, C. W. (1990). "Knowledge-elicitation study in construction scheduling domain." J. Comput. Civ. Eng., 4(2), 135-153.
    • (1990) J. Comput. Civ. Eng. , vol.4 , Issue.2 , pp. 135-153
    • De La Garza, J.M.1    Ibbs, C.W.2
  • 3
    • 0038552641 scopus 로고    scopus 로고
    • Development of activity network modules for expressway projects
    • Taiwan Area National Expressway Engineering Bureau, Taipei, Taiwan (in Chinese)
    • Dzeng, R. J. (2000). "Development of activity network modules for expressway projects." Tech. Rep., Taiwan Area National Expressway Engineering Bureau, Taipei, Taiwan (in Chinese).
    • (2000) Tech. Rep.
    • Dzeng, R.J.1
  • 4
    • 0009115069 scopus 로고    scopus 로고
    • Boiler erection scheduling using product models and case-based reasoning
    • Dzeng, R. J., and Tommelein, I. D. (1997). "Boiler erection scheduling using product models and case-based reasoning." J. Constr. Eng. Manage., 123(3), 338-347.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 338-347
    • Dzeng, R.J.1    Tommelein, I.D.2
  • 5
    • 0037809298 scopus 로고    scopus 로고
    • Automatic schedule integration for highway projects
    • Dzeng, R. J., and Wang, W. C. (2003) "Automatic schedule integration for highway projects." Autom. Constr., 12(4), 447-461.
    • (2003) Autom. Constr. , vol.12 , Issue.4 , pp. 447-461
    • Dzeng, R.J.1    Wang, W.C.2
  • 6
    • 12344331133 scopus 로고    scopus 로고
    • Module-based construction schedule administration for public infrastructure agencies
    • Dzeng, R. J., Wang, W. C., and Tserng, H. P. (2004). "Module-based construction schedule administration for public infrastructure agencies." J. Constr. Eng. Manage., 130(1), 5-14.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.1 , pp. 5-14
    • Dzeng, R.J.1    Wang, W.C.2    Tserng, H.P.3
  • 8
    • 0001582375 scopus 로고
    • Knowledge-based system for construction planning of high-rise buildings
    • Shaked, O., and Warszawski, A. (1995). "Knowledge-based system for construction planning of high-rise buildings." J. Constr. Eng. Manage., 121(2), 172-182.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.2 , pp. 172-182
    • Shaked, O.1    Warszawski, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.