메뉴 건너뛰기




Volumn 50, Issue 12, 2004, Pages 1690-1703

Simulation of the new product development process for performance improvement

Author keywords

Concurrent engineering; Cross functional teams; New product development; Overlapping; Sequential engineering; Stochastic simulation

Indexed keywords

COMPUTER SIMULATION; CONCURRENT ENGINEERING; COSTS; MATHEMATICAL MODELS; RANDOM PROCESSES; RESOURCE ALLOCATION;

EID: 11844285666     PISSN: 00251909     EISSN: None     Source Type: Journal    
DOI: 10.1287/mnsc.1040.0309     Document Type: Article
Times cited : (86)

References (32)
  • 1
    • 0029306335 scopus 로고
    • Is concurrent engineering always a sensible proposition?
    • AitSahlia, F. E., P. W. Johnson. 1995. Is concurrent engineering always a sensible proposition? IEEE Trans. Engrg. Management 42(2) 166-170.
    • (1995) IEEE Trans. Engrg. Management , vol.42 , Issue.2 , pp. 166-170
    • AitSahlia, F.E.1    Johnson, P.W.2
  • 4
    • 0008761925 scopus 로고
    • The validity of computational models in organization science: From model realism to purpose of the model
    • Burton, R. M., B. Obel. 1995. The validity of computational models in organization science: From model realism to purpose of the model. Comput. Math. Organ. Theory 1(1) 57-71.
    • (1995) Comput. Math. Organ. Theory , vol.1 , Issue.1 , pp. 57-71
    • Burton, R.M.1    Obel, B.2
  • 5
    • 0842315291 scopus 로고    scopus 로고
    • The Heinz School, Carnegie Mellon University, Pittsburgh, PA
    • Carley, K. 1996. Validating computational models. The Heinz School, Carnegie Mellon University, Pittsburgh, PA.
    • (1996) Validating Computational Models
    • Carley, K.1
  • 8
    • 43949151922 scopus 로고
    • Third generation new product processes
    • Cooper, R. G. 1994. Third generation new product processes. J. Product Innovation Management 11(1) 3-14.
    • (1994) J. Product Innovation Management , vol.11 , Issue.1 , pp. 3-14
    • Cooper, R.G.1
  • 11
    • 0038257091 scopus 로고
    • Accelerating adaptive processes: Product innovation in the global computer industry
    • Eisenhardt, K. M., B. N. Tabrizi. 1995. Accelerating adaptive processes: Product innovation in the global computer industry. Admin. Sci. Quart. 40(1) 84-110.
    • (1995) Admin. Sci. Quart. , vol.40 , Issue.1 , pp. 84-110
    • Eisenhardt, K.M.1    Tabrizi, B.N.2
  • 13
    • 0036651460 scopus 로고    scopus 로고
    • An evaluation of research on integrated product development
    • Gerwin, D., N. J. Barrowman. 2002. An evaluation of research on integrated product development. Management Sci. 48(7) 938-953.
    • (2002) Management Sci. , vol.48 , Issue.7 , pp. 938-953
    • Gerwin, D.1    Barrowman, N.J.2
  • 14
    • 0029369186 scopus 로고
    • Optimal timing of reviews in concurrent design for manufacturability
    • Ha, A. Y., E. L. Porteus. 1995. Optimal timing of reviews in concurrent design for manufacturability. Management Sci. 41(9) 1431-1447.
    • (1995) Management Sci. , vol.41 , Issue.9 , pp. 1431-1447
    • Ha, A.Y.1    Porteus, E.L.2
  • 15
    • 0030143538 scopus 로고    scopus 로고
    • Composite forms of organization as a strategy for concurrent engineering effectiveness
    • Hull, F., P. Collins, J. Liker. 1996. Composite forms of organization as a strategy for concurrent engineering effectiveness. IEEE Trans. Engrg. Management 43(2) 133-142.
    • (1996) IEEE Trans. Engrg. Management , vol.43 , Issue.2 , pp. 133-142
    • Hull, F.1    Collins, P.2    Liker, J.3
  • 16
    • 0000107740 scopus 로고
    • Technology integration: Managing technological evolution in a complex environment
    • Iansiti, M. 1995. Technology integration: Managing technological evolution in a complex environment. Res. Policy 24(2) 521-542.
    • (1995) Res. Policy , vol.24 , Issue.2 , pp. 521-542
    • Iansiti, M.1
  • 17
    • 0000676522 scopus 로고    scopus 로고
    • The virtual design team: A computational model of project organizations
    • Jin, Y., R. E. Levitt. 1996. The virtual design team: A computational model of project organizations. Comput. Math. Organ. Theory 2(3) 171-196.
    • (1996) Comput. Math. Organ. Theory , vol.2 , Issue.3 , pp. 171-196
    • Jin, Y.1    Levitt, R.E.2
  • 18
    • 0035707626 scopus 로고    scopus 로고
    • Performance of coupled product development activities with a deadline
    • Joglekar, N. R., A. A. Yassine, S. D. Eppinger, D. E. Whitney. 2001. Performance of coupled product development activities with a deadline. Management Sci, 47(12) 1605-1620.
    • (2001) Management Sci , vol.47 , Issue.12 , pp. 1605-1620
    • Joglekar, N.R.1    Yassine, A.A.2    Eppinger, S.D.3    Whitney, D.E.4
  • 19
    • 0030147006 scopus 로고    scopus 로고
    • Managing the simultaneous execution of coupled phases in concurrent product development
    • Krishnan, V. S. D. 1996. Managing the simultaneous execution of coupled phases in concurrent product development. IEEE Trans. Engrg. Management 43(2) 210-217.
    • (1996) IEEE Trans. Engrg. Management , vol.43 , Issue.2 , pp. 210-217
    • Krishnan, V.S.D.1
  • 20
    • 0031108561 scopus 로고    scopus 로고
    • A model-based framework to overlap product development activities
    • Krishnan, V. S. D., S. D. Eppinger, D. E. Whitney. 1997. A model-based framework to overlap product development activities. Management Sci. 43(4) 437-451.
    • (1997) Management Sci. , vol.43 , Issue.4 , pp. 437-451
    • Krishnan, V.S.D.1    Eppinger, S.D.2    Whitney, D.E.3
  • 21
    • 0033358240 scopus 로고    scopus 로고
    • Simulating project work processes and organizations: Toward a micro-contingency theory of organizational design
    • Levitt, R. E., J. Thomsen, T. R. Christiansen, J. C. Kunz, Y. Lin, C. Nass. 1999. Simulating project work processes and organizations: Toward a micro-contingency theory of organizational design. Management Sci. 45(11) 1479-1495.
    • (1999) Management Sci. , vol.45 , Issue.11 , pp. 1479-1495
    • Levitt, R.E.1    Thomsen, J.2    Christiansen, T.R.3    Kunz, J.C.4    Lin, Y.5    Nass, C.6
  • 22
    • 0032140351 scopus 로고    scopus 로고
    • Communication and uncertainty in concurrent engineering
    • Loch, C., C. Terwiesch. 1998. Communication and uncertainty in concurrent engineering. Management Sci. 44(8) 1032-1047.
    • (1998) Management Sci. , vol.44 , Issue.8 , pp. 1032-1047
    • Loch, C.1    Terwiesch, C.2
  • 23
    • 0033101783 scopus 로고    scopus 로고
    • R&D-production integration in the early phases of new product development projects
    • Nihtila, J. 1999. R&D-Production integration in the early phases of new product development projects. J. Engrg. Tech. Management 16(1) 55-81.
    • (1999) J. Engrg. Tech. Management , vol.16 , Issue.1 , pp. 55-81
    • Nihtila, J.1
  • 24
    • 0031153160 scopus 로고    scopus 로고
    • Social identification effects in product and process development teams
    • Scott, S. G. 1997. Social identification effects in product and process development teams. J. Engrg. Tech. Management 14(2) 97-127.
    • (1997) J. Engrg. Tech. Management , vol.14 , Issue.2 , pp. 97-127
    • Scott, S.G.1
  • 26
    • 0030142989 scopus 로고    scopus 로고
    • Customizing concurrent engineering processes: Five case studies
    • Swink, M. L., J. C. Sandvig, V. A. Mabert. 1996. Customizing concurrent engineering processes: Five case studies. J. Product Innovation Management 13(3) 229-244.
    • (1996) J. Product Innovation Management , vol.13 , Issue.3 , pp. 229-244
    • Swink, M.L.1    Sandvig, J.C.2    Mabert, V.A.3
  • 27
    • 0032635365 scopus 로고    scopus 로고
    • Measuring the effectiveness of overlapping development activities
    • Terwiesch, C., C. H. Loch. 1999. Measuring the effectiveness of overlapping development activities. Management Sci. 45(4) 455-465.
    • (1999) Management Sci. , vol.45 , Issue.4 , pp. 455-465
    • Terwiesch, C.1    Loch, C.H.2
  • 28
    • 0033891822 scopus 로고    scopus 로고
    • The effect of front-loading problem-solving on product development performance
    • Thomke, S., T. Fujimoto. 2000. The effect of front-loading problem-solving on product development performance. J. Product Innovation Management 17(2) 128-142.
    • (2000) J. Product Innovation Management , vol.17 , Issue.2 , pp. 128-142
    • Thomke, S.1    Fujimoto, T.2
  • 31
    • 0032634750 scopus 로고    scopus 로고
    • A decision analytic framework for evaluating concurrent engineering
    • Yassine, A., K. Chelst, D. Falkenburg. 1999. A decision analytic framework for evaluating concurrent engineering. IEEE Trans. Engrg. Management 46(2) 144-157.
    • (1999) IEEE Trans. Engrg. Management , vol.46 , Issue.2 , pp. 144-157
    • Yassine, A.1    Chelst, K.2    Falkenburg, D.3
  • 32
    • 0030149461 scopus 로고    scopus 로고
    • The effect of acceleration techniques on product span time
    • Zirger, B. J., J. L. Hartley. 1996. The effect of acceleration techniques on product span time. IEEE Trans. Engrg. Management 43(2) 143-152.
    • (1996) IEEE Trans. Engrg. Management , vol.43 , Issue.2 , pp. 143-152
    • Zirger, B.J.1    Hartley, J.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.