Electric power network flexible planning model based on the probability of scene occurrence

Author keywords

Blind number planning; Branch chosen probability; Electric power engineering; Flexible constraints; Flexible planning; Multi scenario technique; Uncertainty

Indexed keywords

MATHEMATICAL MODELS; OPTIMIZATION; PROBABILITY;

EID: 11144240031     PISSN: 02588013     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Article
Times cited : (32)

References (13)
  • 1
    • 0031675507 scopus 로고    scopus 로고
    • Increased uncertainty a new challenge for power system planners
    • Van Geert, Edwin. Increased uncertainty a new challenge for power system planners[C]. IEE Colloquium (Digest), 1998, n200, 1/1-1/6.
    • (1998) IEE Colloquium (Digest) , vol.N200
    • van Geert1    Edwin2
  • 2
    • 0034274480 scopus 로고    scopus 로고
    • A novel method of electric power network flexible planning considering the selected probability of transmission Line
    • Zhu Haifeng, Cheng Haozhong, Zhang Yan. A novel method of electric power network flexible planning considering the selected probability of transmission Line [J]. Power System Automation, 2002, 24(17): 20-24.
    • (2002) Power System Automation , vol.24 , Issue.17 , pp. 20-24
    • Zhu, H.1    Cheng, H.2    Zhang, Y.3
  • 3
    • 0034335195 scopus 로고    scopus 로고
    • The evaluation method of fuzzy reliability in electric power network planning
    • Zhang Yan. The evaluation method of fuzzy reliability in electric power network planning [J]. Proceedings of the CSEE, 2000, 20(11): 77-80.
    • (2000) Proceedings of the CSEE , vol.20 , Issue.11 , pp. 77-80
    • Zhang, Y.1
  • 4
    • 0032261504 scopus 로고    scopus 로고
    • Flexible strategy approach for transmission system expansion planning
    • Zhang Hongming, Fan Yaliang, Liao Peihong. Flexible strategy approach for transmission system expansion planning [J]. Proceedings of the CSEE, 1998, 18(1): 48-50.
    • (1998) Proceedings of the CSEE , vol.18 , Issue.1 , pp. 48-50
    • Zhang, H.1    Fan, Y.2    Liao, P.3
  • 5
    • 0442296180 scopus 로고    scopus 로고
    • Electric power networks flexible planning via the BM model of unascertained number
    • Cheng Haozhong, Zhu Haifeng, Wang Jianmin et al. Electric power networks flexible planning via the BM model of unascertained number[J]. Proceedings of Shanghai Jiaotong University, 2003, 37(9): 1347-1350.
    • (2003) Proceedings of Shanghai Jiaotong University , vol.37 , Issue.9 , pp. 1347-1350
    • Cheng, H.1    Zhu, H.2    Wang, J.3
  • 6
    • 0036552473 scopus 로고    scopus 로고
    • A study on the productive time of a working procedure in a network planning with uncertainty
    • Zhang Qinghe, Zhang Yunbo. A study on the productive time of a working procedure in a network planning with uncertainty[J]. Journal of Huaqiao University (Natural Science). 2002, 23(2): 142-146.
    • (2002) Journal of Huaqiao University (Natural Science) , vol.23 , Issue.2 , pp. 142-146
    • Zhang, Q.1    Zhang, Y.2
  • 8
    • 11144234134 scopus 로고    scopus 로고
    • New application of the minimum or maximum regret value method in uncertain decision making
    • Zhang Haitao. New application of the minimum or maximum regret value method in uncertain decision making [J]. Decision making and reference, 1996, 9(2): 41-42.
    • (1996) Decision Making and Reference , vol.9 , Issue.2 , pp. 41-42
    • Zhang, H.1
  • 9
    • 11144221189 scopus 로고    scopus 로고
    • Chinese source
  • 10
    • 7244251750 scopus 로고    scopus 로고
    • The application of fuzzy evaluation of blind information in electric network planning
    • Gao Ciwei, Cheng Haozhong, Wang Xu. The application of fuzzy evaluation of blind information in electric network planning[J]. Proceedings of the CSEE, 2004, 24(9): 24-29.
    • (2004) Proceedings of the CSEE , vol.24 , Issue.9 , pp. 24-29
    • Gao, C.1    Cheng, H.2    Wang, X.3
  • 11
    • 0035435357 scopus 로고    scopus 로고
    • Power flow analysis of electric power networks flexible planning by means of unascertained number
    • Zhu Haifeng, Cheng Haozhong, Zhang Yan, et al. Power flow analysis of electric power networks flexible planning by means of unascertained number [J]. Proceedings of CSEE, 1998, 21(8): 74-78.
    • (1998) Proceedings of CSEE , vol.21 , Issue.8 , pp. 74-78
    • Zhu, H.1    Cheng, H.2    Zhang, Y.3
  • 12
    • 10644295736 scopus 로고    scopus 로고
    • Multi-population central solution searching algorithm based on computation resource distributing for electric network planning
    • Gao Ciwei, Cheng Haozhong, Wang Xu. Multi-population central solution searching algorithm based on computation resource distributing for electric network planning[J]. Proceedings of the CSEE, 2004, 24(10): 8-14.
    • (2004) Proceedings of the CSEE , vol.24 , Issue.10 , pp. 8-14
    • Gao, C.1    Cheng, H.2    Wang, X.3
  • 13
    • 10644261953 scopus 로고    scopus 로고
    • Improving transmission network planning model by using genetic algorithm
    • Zhang Junfang, Wang Xiuli, Wang Xifan. Improving transmission network planning model by using genetic algorithm[J]. Power System Technology, 1997, 21(4): 25-32.
    • (1997) Power System Technology , vol.21 , Issue.4 , pp. 25-32
    • Zhang, J.1    Wang, X.2    Wang, X.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.