메뉴 건너뛰기




Volumn 5493, Issue , 2004, Pages 331-340

Robotic telecope scheduling: The Liverpool Telescope experience

Author keywords

Objective functions; Optimization; Scheduling; Search

Indexed keywords

FUNCTIONS; JAVA PROGRAMMING LANGUAGE; MOON BASES; OBSERVATORIES; OPTIMIZATION; PHOTOMETRY; ROBUSTNESS (CONTROL SYSTEMS); SCHEDULING;

EID: 10444266681     PISSN: 0277786X     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1117/12.551380     Document Type: Conference Paper
Times cited : (22)

References (4)
  • 1
    • 9944265893 scopus 로고    scopus 로고
    • Control software and scheduling of the Liverpool Robotic Telescope
    • I.A. Steele and D. Carter, "Control software and scheduling of the Liverpool Robotic Telescope" in Telescope Control Systems II, Proc. SPIE 3112, pp. 222-233, 1997.
    • (1997) Telescope Control Systems II, Proc. SPIE , vol.3112 , pp. 222-233
    • Steele, I.A.1    Carter, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.