메뉴 건너뛰기




Volumn 76, Issue 6, 2004, Pages 577-583

Goal setting with six sigma mean shift determination

Author keywords

Manufacturing industries; Quality programmes; Statistical process control

Indexed keywords

AIRCRAFT MANUFACTURE; AIRCRAFT PARTS AND EQUIPMENT; PROBABILITY; QUALITY CONTROL; STATISTICAL METHODS;

EID: 10144220666     PISSN: 00022667     EISSN: None     Source Type: Journal    
DOI: 10.1108/00022660410565490     Document Type: Article
Times cited : (19)

References (7)
  • 1
    • 3042625508 scopus 로고    scopus 로고
    • American Management Association, New York, NY
    • Bhote, K.R. (2002), The Ultimate Six Sigma, American Management Association, New York, NY.
    • (2002) The Ultimate Six Sigma
    • Bhote, K.R.1
  • 2
    • 0036225770 scopus 로고    scopus 로고
    • "Statistical reason for the 1.5 σ shift"
    • Bothe, D.R. (2002), "Statistical reason for the 1.5 σ shift", Quality Engineering, Vol. 14 No. 3, pp. 479-87.
    • (2002) Quality Engineering , vol.14 , Issue.3 , pp. 479-487
    • Bothe, D.R.1
  • 6
    • 10144233967 scopus 로고    scopus 로고
    • "Nasser, Ford embrace data-driven quality plan"
    • Detroit News, 26 January
    • Truby, M. (2000), "Nasser, Ford embrace data-driven quality plan", Detroit News, 26 January, p. F1.
    • (2000) Detroit News
    • Truby, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.