Volumn 35, Issue 1, 2004, Pages 27-33

Optimal deployment of construction equipment using linear programming with fuzzy coefficients

Author keywords

Extension principle; Flexibility; Fuzzy linear programming; Fuzzy numbers; Fuzzy sets; Membership function

Indexed keywords

APPROXIMATION THEORY; ARTIFICIAL INTELLIGENCE; CONSTRUCTION INDUSTRY; DECISION MAKING; FUZZY SETS; HYDRAULIC CONTROL EQUIPMENT; LINEAR PROGRAMMING; METALLURGY; OPTIMIZATION; PERSONNEL; PROBLEM SOLVING;

EID: 0942279037     PISSN: 09659978     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0965-9978(03)00111-X     Document Type: Article
Times cited : (5)

References (13)
  • 1
    • 0000483477 scopus 로고    scopus 로고
    • Innovation in construction equipment and its flow into the construction industry
    • ASCE
    • Arditi D., Kale S., Tangkar M. Innovation in construction equipment and its flow into the construction industry. J Construct Engng Mgmt, ASCE. 123:(4):1998;371-378.
    • (1998) J Construct Engng Mgmt , vol.123 , Issue.4 , pp. 371-378
    • Arditi, D.1    Kale, S.2    Tangkar, M.3
  • 2
    • 0033156974 scopus 로고    scopus 로고
    • Fuzzy optimal model for resource-constrained construction scheduling
    • ASCE
    • Leu S., Chen A., Yang C. Fuzzy optimal model for resource-constrained construction scheduling. J Construct Engng Mgmt, ASCE. 13:(3):1999;207-216.
    • (1999) J Construct Engng Mgmt , vol.13 , Issue.3 , pp. 207-216
    • Leu, S.1    Chen, A.2    Yang, C.3
  • 3
    • 0346636333 scopus 로고
    • Decision making in fuzzy environment
    • Bellman R.E., Zadeh L.A. Decision making in fuzzy environment. Mgmt Sci. 17:(4):1970;141-154.
    • (1970) Mgmt Sci , vol.17 , Issue.4 , pp. 141-154
    • Bellman, R.E.1    Zadeh, L.A.2
  • 4
    • 0015558134 scopus 로고
    • Outline of a new approach to the analysis of complex systems and decision processes
    • Zadeh L.A. Outline of a new approach to the analysis of complex systems and decision processes. IEEE Trans Syst Man Cybern. 3:(1):1973;28-44.
    • (1973) IEEE Trans Syst Man Cybern , vol.3 , Issue.1 , pp. 28-44
    • Zadeh, L.A.1
  • 5
    • 0032030008 scopus 로고    scopus 로고
    • Fuzzy optimization model for water quality management of a river system
    • Sasikumar K., Mujumdar P.P. Fuzzy optimization model for water quality management of a river system. J Water Resour Plan Mgmt. 124:(2):1996;79-88.
    • (1996) J Water Resour Plan Mgmt , vol.124 , Issue.2 , pp. 79-88
    • Sasikumar, K.1    Mujumdar, P.P.2
  • 6
    • 0021441936 scopus 로고
    • Project scheduling using fuzzy set concepts
    • ASCE
    • Ayyub B.M., Haldar A. Project scheduling using fuzzy set concepts. J Construct Engng Mgmt, ASCE. 110:(2):1984;189-204.
    • (1984) J Construct Engng Mgmt , vol.110 , Issue.2 , pp. 189-204
    • Ayyub, B.M.1    Haldar, A.2
  • 7
    • 0000133542 scopus 로고    scopus 로고
    • Evaluation and competitive tendering of BOT power plant project in China
    • ASCE
    • Wang S.Q., Tiong R.L.K., Ting S.K., Chew D., Ashley D. Evaluation and competitive tendering of BOT power plant project in China. J Construct Engng Mgmt, ASCE. 124:(4):1998;333-347.
    • (1998) J Construct Engng Mgmt , vol.124 , Issue.4 , pp. 333-347
    • Wang, S.Q.1    Tiong, R.L.K.2    Ting, S.K.3    Chew, D.4    Ashley, D.5
  • 8
    • 84992974062 scopus 로고    scopus 로고
    • Assessment of working capital requirements by fuzzy set theory
    • Kumar V.S.S., Hanna A.S., Adams T. Assessment of working capital requirements by fuzzy set theory. J Engng Construct Architect Mgmt. 7:(1):2000;93-107.
    • (2000) J Engng Construct Architect Mgmt , vol.7 , Issue.1 , pp. 93-107
    • Kumar, V.S.S.1    Hanna, A.S.2    Adams, T.3
  • 9
    • 0025211002 scopus 로고
    • Linear programming approach to construction equipment and labor assignments
    • Skibniewski M., Armijos A. Linear programming approach to construction equipment and labor assignments. Civil Engng Syst. 7:(1):1990;44-50.
    • (1990) Civil Engng Syst , vol.7 , Issue.1 , pp. 44-50
    • Skibniewski, M.1    Armijos, A.2
  • 10
    • 0040784761 scopus 로고    scopus 로고
    • Fuzzy system modelling for optimal crop planning
    • Mohan S., Jothi Prakash V. Fuzzy system modelling for optimal crop planning. Inst Engrs. 81:2000;9-17.
    • (2000) Inst Engrs , vol.81 , pp. 9-17
    • Mohan, S.1    Jothi Prakash, V.2
  • 11
    • 0021424468 scopus 로고
    • Fuzzy linear programming problems with fuzzy numbers
    • Tanaka H., Asai K. Fuzzy linear programming problems with fuzzy numbers. Fuzzy Sets Syst. 13:1984;11-23.
    • (1984) Fuzzy Sets Syst , vol.13 , pp. 11-23
    • Tanaka, H.1    Asai, K.2
  • 12
    • 38449103932 scopus 로고
    • Fuzzy interactive multi objective optimisation on borrowing/lending problems
    • Cross V., Cabello M. Fuzzy interactive multi objective optimisation on borrowing/lending problems. IEEE Proc ISUMA-NAFIPS. 1995;513-518.
    • (1995) IEEE Proc ISUMA-NAFIPS , pp. 513-518
    • Cross, V.1    Cabello, M.2
  • 13
    • 0000732919 scopus 로고    scopus 로고
    • Project-network analysis using fuzzy sets theory
    • ASCE
    • Lorterapong P., Moselhi O. Project-network analysis using fuzzy sets theory. J Construct Engng Mgmt, ASCE. 122:(4):1996;308-318.
    • (1996) J Construct Engng Mgmt , vol.122 , Issue.4 , pp. 308-318
    • Lorterapong, P.1    Moselhi, O.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.