![]() |
Volumn 16, Issue 4, 2003, Pages 425-442
|
Real-time management of a sewage system: Verification of the optimality and applicability of graphical linear programming compared to mixed linear programming;Gestion en temps réel d'un réseau d'assainissement: Vérification de l'optimalité et de l'applicabilité de la théorie des graphes par rapport à la programmation linéaire mixte
|
Author keywords
Combined sewer network; Graph linear programming; Mixed linear programming; Optimisation; Real time controls
|
Indexed keywords
ALGORITHMS;
HYDRAULICS;
LINEAR PROGRAMMING;
MANAGEMENT;
OPERATIONS RESEARCH;
OPTIMIZATION;
RAIN;
VALVES (MECHANICAL);
WASTEWATER;
GRAPH PROGRAMMING;
SEWAGE;
COMPUTER PROGRAM;
CONTROL SYSTEM;
GRAPHICAL METHOD;
OPTIMIZATION;
SEWER NETWORK;
WASTEWATER;
|
EID: 0842344512
PISSN: 09927158
EISSN: None
Source Type: Journal
DOI: 10.7202/705516ar Document Type: Article |
Times cited : (4)
|
References (16)
|