-
1
-
-
0024641438
-
Computational complexity of uncapacitated multi-echelon production planning problems
-
Arkin E., Joneja D., Roundy R. Computational complexity of uncapacitated multi-echelon production planning problems. Operations Research Letters. 8:1989;61-66.
-
(1989)
Operations Research Letters
, vol.8
, pp. 61-66
-
-
Arkin, E.1
Joneja, D.2
Roundy, R.3
-
4
-
-
0026208005
-
A simple forward algorithm to solve general dynamic lot sizing models with n periods in O(nlogn) or O(n) time
-
Federgruen A., Tzur M. A simple forward algorithm to solve general dynamic lot sizing models with. n periods in O(nlogn) or O(n) time Management Science. 37:1991;909-925.
-
(1991)
Management Science
, vol.37
, pp. 909-925
-
-
Federgruen, A.1
Tzur, M.2
-
5
-
-
0028550667
-
The joint replenishment problem with time-varying costs and demand: Efficient, asymptotic and ε -optimal solutions
-
Federgruen A., Tzur M. The joint replenishment problem with time-varying costs and demand: Efficient, asymptotic and. ε -optimal solutions Operations Research. 42:1994;1067-1086.
-
(1994)
Operations Research
, vol.42
, pp. 1067-1086
-
-
Federgruen, A.1
Tzur, M.2
-
6
-
-
0022031091
-
An application oriented guide to Lagrangian relaxation
-
Fisher M.L. An application oriented guide to Lagrangian relaxation. Interfaces. 15(2):1985;10-21.
-
(1985)
Interfaces
, vol.15
, Issue.2
, pp. 10-21
-
-
Fisher, M.L.1
-
7
-
-
0039444428
-
Decision support systems support the search for win-win solutions in railway network design
-
Hooghiemstra J.S., Kroon L.G., Odijk M.A., Salomon M., Zwaneveld P.J. Decision support systems support the search for win-win solutions in railway network design. Interfaces. 29(2):1999;15-32.
-
(1999)
Interfaces
, vol.29
, Issue.2
, pp. 15-32
-
-
Hooghiemstra, J.S.1
Kroon, L.G.2
Odijk, M.A.3
Salomon, M.4
Zwaneveld, P.J.5
-
8
-
-
0022851257
-
A heuristic algorithm for the multi-vehicle advance request dial-a-ride problem with time windows
-
Jaw J.-J., Odoni A.R., Psaraftis H.N., Wilson N.H.M. A heuristic algorithm for the multi-vehicle advance request dial-a-ride problem with time windows. Transportation Research. 20B:1986;243-257.
-
(1986)
Transportation Research
, vol.20 B
, pp. 243-257
-
-
Jaw, J.-J.1
Odoni, A.R.2
Psaraftis, H.N.3
Wilson, N.H.M.4
-
9
-
-
0029252453
-
Optimized transfer opportunities in public transport
-
Knopper P., Muller T. Optimized transfer opportunities in public transport. Transportation Science. 29:1995;101-105.
-
(1995)
Transportation Science
, vol.29
, pp. 101-105
-
-
Knopper, P.1
Muller, T.2
-
10
-
-
56749180550
-
Single-product single-location models
-
S.C. Graves, A.H.G. Rinnooy Kan, Zipkin P.H. Amsterdam: North-Holland
-
Lee H.L., Nahmias S. Single-product single-location models. Graves S.C., Rinnooy Kan A.H.G., Zipkin P.H. Handbooks in Operations Research and Management Science, vol. 4, Logistics of Production and Inventory. 1993;3-55 North-Holland, Amsterdam.
-
(1993)
Handbooks in Operations Research and Management Science, Vol. 4, Logistics of Production and Inventory
, vol.4
, pp. 3-55
-
-
Lee, H.L.1
Nahmias, S.2
-
11
-
-
0030143150
-
A genetic algorithm approach to periodic railway synchronization
-
Nachtigall K., Voget S. A genetic algorithm approach to periodic railway synchronization. Computers and Operations Research. 23:1996;453-463.
-
(1996)
Computers and Operations Research
, vol.23
, pp. 453-463
-
-
Nachtigall, K.1
Voget, S.2
-
12
-
-
0002697840
-
Dispatching policies for a transportation route
-
Newell G.F. Dispatching policies for a transportation route. Transportation Science. 5:1971;91-105.
-
(1971)
Transportation Science
, vol.5
, pp. 91-105
-
-
Newell, G.F.1
-
13
-
-
0019045411
-
Scheduling bus systems with interchange
-
Salzborn F.J.M. Scheduling bus systems with interchange. Transportation Science. 14:1980;211-231.
-
(1980)
Transportation Science
, vol.14
, pp. 211-231
-
-
Salzborn, F.J.M.1
-
14
-
-
0000857408
-
A Lagrangian-based heuristic for dynamic multi-level multi-item constrained lotsizing with setup times
-
Tempelmeier H., Derstroff M. A Lagrangian-based heuristic for dynamic multi-level multi-item constrained lotsizing with setup times. Management Science. 42:1996;738-757.
-
(1996)
Management Science
, vol.42
, pp. 738-757
-
-
Tempelmeier, H.1
Derstroff, M.2
-
15
-
-
0008572946
-
DONS: Computer aided design of regular service timetables
-
Madrid
-
J.H.A. Van den Berg, M.A. Odijk, DONS: Computer aided design of regular service timetables, Proceedings of COMPRAIL 94, Madrid, 1994, pp. 109-115.
-
(1994)
Proceedings of COMPRAIL 94
, pp. 109-115
-
-
Van den Berg, J.H.A.1
Odijk, M.A.2
|